36C24818Q0678-004.pdf
PDF 116 KB Posted
- Attached to
- Equipment - Booster Water Pumps Federal contract opportunity
- Solicitation number
- 36C24818Q0678
About this file
36C24818Q0678 S02 - Attachment D.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24818Q0678-002.pdf | ||
| 36C24818Q0678-000.docx | DOCX document | |
| 36C24818Q0678-001.pdf | ||
| 36C24818Q0678-003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Background: The Malcom Randall VA Medical Center operates and maintains a Triplex Booster Pump that boost the water pressure for the upper floors of the E-Wing.
Objective: We need to replace the Existing Triplex DW Booster with 1 New Triplex Booster Pump.
Scope of Work:
• Replace the existing Triplex DW Booster Pump with 1 New Triplex Booster Pump
• Remove the existing DW Pump and Piping.
• Pipe in and install the new Pump Model.
• Provide and install all electrical and controls.
• Test operate the newly installed DW Pump
• Provide all documentation and certification to the COR
Qualifications/Certifications: The offeror shall possess, at a minimum, the following performance qualifications:
• Possess technical staff qualified by professional education and technical experience to perform the work required by this statement of work.
• Ensure that the offeror and all of the individuals working on the project on-site have taken an OSHA Certified 10-hour construction safety course.
Safety Regulations: The following ancillary conditions apply to the Statement of Work:
• All OSHA safety regulations shall be observed during the project.
• The VA Safety Officer shall have full authority to see that the offeror follows all safety rules and regulations relative to the fulfillment of this project.
• Provide the necessary tools, supplies, and barricades/signage where required.
Scheduling and Hours of Work: Additional considerations include:
• All on-site work shall be scheduled with three (3) days advance notice with the VA Operations Supervisor unless other mutually agreeable arrangements are made.
• The ten (10) holidays observed by the Federal Government are New Years Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas or any other day specifically declared by the President of the United States to be a national holiday.
On-site work will not be allowed on those days unless mutually agreeable arrangements are made beforehand.
File details come from the government source that posted it.