36C24818Q0549-00002000.docx

DOCX document 31 KB Posted

Attached to
Solid Waste Collection & Disposal Services
Solicitation number
36C24818Q0549
Issued by

About this file

36C24818Q0549 00002 36C24818Q0549 00002.docx

View the file

Other files

File Type Posted
36C24818Q0549-00001000.docx DOCX document
36C24818Q0549-002.pdf PDF
36C24818Q0549-001.docx DOCX document
36C24818Q0549-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24818Q0549 00002

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS

ENTERED INTO

PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 00002 06-07-2018 None 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 13800 Veterans Way Lakemont Bldg., Room 210 Orlando FL 32827 36C248

NCO 8

Orlando Services Team 13800 Veterans Way Lakemont Bldg., Room 210 Orlando FL 32827 To all Offerors/Bidders

36C24818Q0549 05-21-2018

X X X 11:00 a.m. (EST) on 06-11-2018 The purpose of this amendment is to provide responses to question, list site visit attendees, change PWS paragraph 2.3, and extend the hour and date specified for receipt of Offers;

A. See the Continuation Pages for responses to questions and the PWS revision.

B. Representatives from: Waste Management, Advanced D i s posal Services, American Waste Management, and Republic Services attended the site visit.

C. The hour and time specified for receipt of Offers is extended from 11:00 a m on 06-08-2018 to 11:00 a m on

06-11-2018.

Kurt Kramer Contracting Officer

CONTINUATION PAGE

RESPONSES TO QUESTIONS:

Q1. Would you accept a larger compactor?

A1. In accordance with 52.212-1 (e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation), or alternative commercial items for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.

Q2. How often is pick up for each compactor?

A2. The estimated quantities in Section B.4 SHEDULE OF SERVICES & PRICING are based on prior year annual pick up totals (e.g. 52 pick-ups = once per week, 104 pick-ups = twice per week). Therefore, the Government estimates:

· 20-yard compactor = once per week + additional pick-ups as required throughout the year.

· 30-yard compactor = once per week.

· 34-yard compactor = twice per week.

Q3. Should it be bid as written?

A3. Offerors may respond to the solicitation as written or propose alternative terms and conditions, including alternative line items. See response for Q1.

Q4. Is recycling part of this contract or is it separate?

A4. No. Recycling is a separate contract.

Q5. Who owns the bailers?

A5. Unknown. Bailers are not included in this requirement.

Q6. Are the compactors 3-phase or single phase?

A6. The compactors are 3-phase.

Q7. What is the voltage?

A7. 277-480 volts.

Q8. Are containers loaded by hand?

A8. Yes, containers are loaded by hand.

Q9. Would we be open to a tipper?

A9. Yes. Reference A1.

Q10. Is there reporting on recycling?

A10. Recycling is not a requirement contained in this solicitation. However, there are reporting requirements including in this solicitation for Class I & Class III waste tonnages.

Q11. Can we get copy of current rates?

A11. The following information is provided regarding the past contract. The solicitation was posted to the Federal Business Opportunities (FBO) website. Source selection was based on the Lowest-Priced Technically Acceptable (LPTA) received. The Government received four (4) offers. The award was made to American Waste Management of Sanford, Florida in the amount of $436,060.20 for the period from April 2014 through March 2018.

Q12. Are metal and construction materials thrown into these cans?

A12. At times, metal can be found mixed in with construction debris. The Government makes a cognizant effort to sort out any metal materials for recycling.

Q13. What is the tonnage for compactors?

A13. The estimated annual tonnage for the compactors is identified in Section B.4 SHEDULE OF SERVICES & PRICING.

Q14. What are the payment terms?

A14. See section E.1 52.212-1 (b). Payment and any discount terms should be included in your response to this solicitation.

Q15. How often are you billed currently?

A15. Invoice are submitted AFTER services are rendered on a monthly basis.

Q16. Is the Lake Nona VA Hospital located in the city of Orlando?

A16. Yes. Both the Lake Nona and Lake Baldwin campuses are located in the City of Orlando.

Q17. Do the gray carts onsite go out to the compactor?

A17. The gray carts/bins seen in and around the compactor area are used to collectively gather and transport trash from the buildings to the compactors and trash containers.

Q18. Can the compactors be loaded off the dock?

A18. At this time, there is no requirement nor plans to relocate or make the compactors adjacent to the loading dock.

Q19. Do you separate cardboard and metal from trash?

A19. Yes. The Government makes a conscious effort to remove and recycled cardboard and metal from trash.

Q20. Is the deodorizer on the solicitation?

Q20. No, a deodorizer is not specifically mentioned in the solicitation.

Q21. Does it matter if it is new or old equipment?

Q22. New or old equipment shall meet or exceed the specifications contained in the Performance Work Statement (PWS). Note: PWS, paragraphs 5.1.2 and 5.1.3.

Q22. Will the source selection be priced based?

A22. The government will conduct a comparative evaluation of the quotes to determine the best benefit to the government at a price that can be determined reasonable. Please refer to Section E.2 GENERAL INSTRUCTION TO OFFERORS on pages 38-40 for more details.

Q23. Can we pick up outside of times on solicitation?

A23. The Government will revise the allowable times the Contractor may provide services. However, if services (e.g. pick-ups) interfere with patient care or the day-to-day operations of the Orlando VAMC, the Contractor shall provide services at times conducive to the Orlando VAMC. The Government shall be to sole authority in determining allowable service times. Our primary concern is the health, welfare, and recovery of our veteran beneficiaries.

CHANGES TO:

· SECTION B.5 PERFORMANCE WORK STATEMENT (PWS), Paragraph 2.3 is changed from:

“2.3. Contractor may perform services Sunday through Saturday, no earlier the 6:00 a.m. and no later than 7:00 p.m.”; to now read:

“2.3. Contractor shall perform services at times which do not interfere with patient care or the daily operations of the Orlando VAMC. The Contracting Officer shall be the sole authority in determining allowable servicing timeframes.”

File details come from the government source that posted it.