36C24725Q0884 0001.docx

DOCX document 6 MB Posted

Attached to
GROSSING STATIONS
Solicitation number
36C24725Q0884
Issued by

About this file

This document is an Amendment to Solicitation for the Department of Veterans Affairs (VA) VISN 7 Network Contracting Activity, specifically for replacing two grossing stations at the WJB Dorn VA Medical Center in Columbia, South Carolina. The procurement encompasses acquiring two new grossing stations, removing and disposing of existing stations, and completing a turn-key installation and commissioning. Key details include an extended response deadline to September 19, 2025, at 1:00 EDT, and a required site survey to be conducted between September 8-12, 2025. The contractor must provide all necessary personnel, equipment, tools, and expertise for removal, installation, testing, and commissioning of the units, including decontamination, potential asbestos abatement, and providing a one-year warranty on parts and labor. Specific installation requirements include precise positioning, connecting electrical and utility lines, modifying vent hoods and countertops, and ensuring system functionality for both units.

View the file

Other files

File Type Posted
MOPEC Install quote checklist.pdf PDF
S02 Synopsis and Solicitation - Grossing Station.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

08-22-2025

Department of Veterans Affairs VISN 7 Network Contracting Activity 501 Greene Street Hatcher Building - Suite 2 Augusta GA 30901

Department of Veterans Affairs VISN 7 Network Contracting Activity 501 Greene Street Hatcher Building - Suite 2 Augusta GA 30901 To all Offerors/Bidders

36C24725Q0884

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 09-19-2025 1:00 EDT

This amendment is to do the following:

1. Extend the response due date and time for solicitation

2. Provide responses to request for information received prior to the deadline

3. All other terms and conditions remain the same.

James E. Boles Jr.

Contracting Officer

Request for Information- 36C24725Q0884

1. We wanted to confirm if the two new grossing stations that will be installed have already been purchased? Confirming if this is only uninstalling and installing or it also includes purchase of the grossing stations.

This procurement encompasses the following:

· Acquisition of two new grossing stations

· Removal and disposal of existing grossing stations

· Complete turn-key installation and commissioning of the two new grossing stations

1. Scope of Work, Item #5 (Page 8) This section is incorrect and needs to be redlined and amended to read:

“The connection to the facility will be completed by the Mopec contractor only if the facility rough-ins match the provided drawing. Mopec will not modify the facility rough-ins.”

The Contractor shall perform a preliminary site assessment to evaluate existing conditions and develop detailed plans for the removal and installation procedures. This site survey must be coordinated with the designated Point-of-Contact (POC) and conducted between September 8, 2025, and September 12, 2025.

Contractor shall provide:

•all requisite supervision
•personnel
•travel logistics
•tools
•equipment
•consumables
•materials
•technical expertise
•certified credentials

For Unit 1, Contractor will:

•initiate installation with the smaller unit located on the right side of the room
•acquire the new unit from the hospital’s receiving dock and transport it to the main front entrance
•remove the existing unit through the hospital’s front entrance, and install the new unit via the same access point
•position, elevate, and level the new unit; connect electrical power, drainage, and hot- and cold-water supply lines
•connect two flexible ducts to the existing vent hood, securing them with appropriate clamps, and attach them to the existing penetrations
•perform operational testing to verify system functionality, subsequently commissioning the system for active use
•following the successful commissioning of the first unit, proceed with the installation of the second unit

For Unit 2, Contractor will:

•remove the secondary unit, performing a detailed disassembly due to the extended countertop affixed to its right end
•modify the existing vent hood to facilitate the integration of two flexible duct connections
•cap the drain and water supply lines associated with the removed unit for temporary closure
•fabricate a stainless-steel countertop to replace the countertop associated with the cabinets remaining after system removal
•modify the existing countertop attached to the removed sink system, if feasible; otherwise, a new countertop shall be fabricated
•upon completion of vent hood and countertop modifications, the contractor will retrieve the second unit from receiving, transport it to the main front entrance, and install it following procedures identical to those used for the first unit

For both Units:

· The contractor will be tasked with decontaminating and disposing of biohazard components.

· The contractor will oversee any qualifications, re-qualifications, or testing and balancing of the exhaust fan.

· A one-year warranty on parts and labor for the supplied materials will be provided.

· The contractor will be accountable for all necessary asbestos abatement

1. Existing Equipment Details Without knowing the make and model of the existing equipment, we cannot provide an accurate quote. Please provide photos of the current units and their facility connections. If the old units are Fisher GrossPath, the rough-ins will not align, and installation cannot proceed immediately after removal.

Please provide photos of existing equipment, including the existing utility connections of these units, along with their make and model #’s.

Unit 1 grossing station: model MB600, serial number MB600J34

Unit 2 custom grossing station:

The connections shall be inspected and verified by the contractor during the site visit.

1. Delivery & Freight Requirements

3. This will be a ground delivery and will require a liftgate. Freight must be Pre-Paid and Add (PPA).

3. Cones or similar barricades are required to block traffic; this means we must purchase or rent and should be excluded from Mopec’s scope, this should be the GC issue as it is his work site.

3. Mopec does not work in the street to uncrate units we can work in a parking lot where the units can be delivered (near the front door).

Can you verify if this will require a lift gate and ground delivery? If that is the case, we will need more information to accurately quote freight.

This will be a dock delivery.

1. On-Site Fabrication Mopec does not modify or fabricate countertops on site.

The modification and/or fabrication of the countertops on the side housing the existing custom grossing station is an obligatory specification/requirement.

1. Emergency Call Provision The provision for a technician to arrive within 2 hours of a service call must be reviewed by Scott. Mopec does not currently provide 24-hour service to meet a 2-hour emergency response requirement.

7. Training Requirements We can meet the Sample 1 training requirement. Our lead installers hold OSHA 30 certifications, and we can request OSHA 10 certified workers as needed.

* Ignore the placeholder text related to the Katron system, as it was inadvertently retained from the form template.

The Contractor shall furnish, upon request, copies of all necessary training documentation (e.g., HVAC, biohazardous waste handling), valid licenses, certifications (e.g., NSF, OSHA, HVAC), and applicable permits.

TRAINING REQUIREMENTS:

HVAC Certified Technician Certified Ventilation Specialist

8. Site Access Requirements Please confirm any site access requirements beyond checking in with engineering upon arrival. Are there orientations or special requirements due to this being a VAMC site? Also, please confirm if this project is subject to prevailing wage requirements.

Any modifications or supplementary requirements pertaining to site access will be addressed and finalized during the site inspection.

** Site survey must be coordinated with the designated Point-of-Contact (POC) and conducted between September 8, 2025, and September 11, 2025, final questions will be taken September 12. Any questions beyond this date will not be accepted.** POC: Knightner, Joielle Email: Joielle.Knightner@va.gov image4.jpeg image1.jpeg image2.jpeg image3.jpeg