S05 Amendment for Vendor Questions Response Jun 11 2024.pdf
PDF 151 KB Posted
- Attached to
- Repair Chilled Water Pump Federal contract opportunity
- Solicitation number
- 36C24724Q0773
About this file
This document is an amendment to Solicitation 36C24724Q0773 for the Repair of Chilled Water Pump at the Tuskegee/Montgomery AL VA Medical Center. The amendment addresses vendor questions and concerns, including the known issues with the pump motors, the required repairs or replacements, and the timeline for completing the work. The agency is requesting fast turnaround due to the critical nature of the equipment and the summer season. All pump and motor assemblies can be removed from the station for service, but only two can be removed at the same time. The vendor will be required to inspect and test the equipment to determine the best service resolution, and provide a one-year warranty on the work. The bid/quote submission deadline is 11:00am EST on June 12, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 OM SDVOSB Solicitation Amendment 2 for 36C24724Q0773 Repair Chilled Water Pump.pdf | ||
| S02 OM SDVOSB Solicitation Amendment 1 for 36C24724Q0773 Repair Chilled Water Pump.pdf | ||
| S02 OM SDVOSB Solicitation 36C24724Q0773 Repair Chilled Water Pump.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
619-24-3-5243-0825
36C247-24-AP-4120
Department of Veterans Affairs
Central Alabama Veterans Health Care
215 Perry Hill Road
Montgomery AL 36109-3798
Department of Veterans Affairs
Central Alabama Health Care System
East Campus
2400 Hospital Road
Tuskegee AL 36083-5001
To all Offerors/Bidders
36C24724Q0773
X
X
Amendment to Address Vendor Questions
X 1
Amendment Purpose: To address question/concerns in reference to solicitation 36C24724Q0773 for Repair Chilled Water Pump
All bids/quotes must be emailed to Benford.Brundage@va.gov by 11:00am EST on Jun 12, 2024.
See Continuation Page(s)
Benford C. Brundage
Contracting Officer
CONTINUATION PAGE
Vendor Questions/Concerns for:
Repair Chilled Water Pump / 36C24724Q0773 / Tuskegee/Montgomery AL VA Medical
Center
No information will be provided about the past or current contract.
1. What is known to be wrong with the pump motors? Vibration and roaring noises. Due to the motors being critical equipment, we prefer to address all wear and tear issues while the equipment is down for service.
2. Would the government want the motor bearings replaced, the motors rewound, or both? VA want the equipment operating correctly and efficiently. Vendor is to inspect and test equipment to determine the state of the motor and best service resolution (repair, rebuild, or replace). Vendor will warranty the work and equipment for one (1) year after completion of work.
3. If rewinding is required, will we be able to remove all pump motors and take them to have the work done at our shop, or will we have to take them one at a time? All the pump and motors assembly can be removed from station for service. Only the two (2) Chilled Water Pump assembly can be removed at the same time for service. Being very critical equipment, the VA is requesting fast turnaround time due to the summer season.