Solicitation 36C24724Q0184.pdf
PDF 565 KB Posted
- Solicitation number
- 36C24724Q0184
About this file
This is a solicitation for underground storage tank fuel removal and disposal services for the Atlanta VA Medical Center. The contractor will remove fuel from three decommissioned 25,000-gallon tanks containing approximately 1,500 gallons total of old fuel and sludge, and from one 550-gallon tank containing 375 gallons of fuel. The contractor will transport and dispose of all sludge and waste in compliance with Georgia regulations. The performance period is one time for this requirement. Quotes are due by January 17, 2024. The award will be firm-fixed price to the responsible contractor with the most advantageous quote based on price, technical capability, prior experience, and representations and certifications. The requirement is set aside for small businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24724Q0184 0001.docx | DOCX document | |
| Attachment 1 Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF 1. REQUISITION NO.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE NO. UEI: EFT:
PHONE: FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
508-24-1-539-0007
36C24724Q0184 12-20-2023
Monica Reed Monica.Reed@va.gov 01-17-2024
5:00 pm CST
Department of Veterans Affairs
VISN 7 Network Contracting Activity
501 Greene Street
Hatcher Building - Suite 2
Augusta GA 30901
X 100
X
562211
$47 Million
N/A N/A
X
Department of Veterans Affairs
Joseph Maxwell Cleland Atlanta VAMC
1670 Clairmont Road
Decatur GA 30033-4004
Department of Veterans Affairs
VISN 7 Network Contracting Activity
501 Greene Street
Hatcher Building - Suite 2
Augusta GA 30901
Department of Veterans Affairs
FMS-VA-2 (101)
Financial Services Center
P.O. Box 149971
Austin TX 78714-9971
See CONTINUATION Page
Underground Storage Tank Fuel Cleanup/Disposal for the
Atlanta VAMC.
The Service Contract Labor Standards statute applies to this requirement. See Section D for the applicable Department of
Labor Wage Determination.
See CONTINUATION Page
X
ROBERT KNIGHT
36C24724Q0184
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. CONTRACT ADMINISTRATION: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
CONTRACTOR NAME:
ADDRESS:
CITY-STATE-ZIP:
POINT OF CONTACT:
OFFICE NUMBER:
E-MAIL ADDRESS:
UEI / DUNS:
b. GOVERNMENT: Monica Reed, Contract Specialist
Rob Knight, Contracting Officer
Department of Veterans Affairs
Network Contracting Office 7
Contracting Office Code: 36C247
2. INVOICING: Use of the invoicing procedures set forth in this Contract is mandatory and supersede any other invoicing procedures otherwise used by the Contractor. Invoice payment, including the calculation of late fees when applicable, shall be conducted in accordance with current Department of
Veterans Affairs policies and procedures at the time an invoice is submitted. Under no circumstances shall a late payment be grounds for termination of this Contract.
a. Invoices Submitted in Arrears: Invoices shall be submitted electronically, monthly, in arrears in accordance with: VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT
REQUESTS (NOV 2018). Invoices shall not be submitted for work not yet performed.
b. Invoice Payment: Payments will be made in arrears upon receipt of a properly prepared invoice.
Advance payments for work not yet performed is not authorized under this Contract. All payments by the Government to the contractor will be made in accordance with FAR 52.232-33
PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD
MANAGEMENT (OCT 2018).
c. Invoice Processes and Procedures:
(1) Electronic Invoicing Required: Facsimile, e-mail, posted mail, and scanned documents are not acceptable forms of submission for payment requests.
(2) FMS Registration: Contractors new to the Department of Veterans Affairs must first register with the VA’s Financial Management System (FMS). In order to register a company with
FMS, the contractor must first register with https://www.id.me/, which is a simple and secure identity verification system. Once a contractor has registered with https://www.id.me/, the contractor can then access the digital registration form through the VA's Customer
Engagement Portal at http://www.cep.fsc.va.gov/. For assistance, contractors may call 1-877-
353-9791 or e-mail vafsccshd@va.gov.
(3) Tungsten Network: Once registered in FMS, a contractor may now electronically submit invoices. The VA has mandated electronic invoice submission to the Veterans Affairs
Financial Services Center (VAFSC). VAFSC has partnered with Tungsten Network e-
Invoicing network, for submissions of all electronic invoices to the VA. Tungsten Network electronic invoicing is free to all VA vendors. In order to submit electronic invoices, all VA vendors must register with Tungsten Network by submitting an email to
VA.Registration@Tungsten-Network.com or calling 1-877-489-6135 for enrollment. Once successfully enrolled, please go to Tungsten Network (tungsten-network.com) to begin submitting electronic invoices.
(4) Invoice Information: All invoices shall reference the vendor’s name and address, customer name, contract number, appropriate obligation/funding order number, description of services provided, quantity, unit price, and total invoice amount (any additional info). Invoices shall also include any payment discount terms, if applicable.
(5) Electronic Invoice Submission: Contractors shall submit an electronic invoice by the tenth
(10th) of the following month services were performed to the Veterans Affairs Financial
Services Center (VAFSC) e-Invoice through the website at https://portal.Tungsten-
Network.com/Login.aspx. For questions regarding the submission of VA electronic invoices, Tungsten Network customer service may be contacted at 1-877-489-6135.
(6) Final Invoice Submission: The Contractor shall submit any outstanding invoices for work performed under this Contract within one (1) month following Contract expiration. In the event that there are any funds remaining on any Purchase Orders issued under this Contract after the one-month time period following Contract expiration, the Government will unilaterally deobligate any unused funds.
3. CONTRACTING OFFICER AUTHORITY: If the contractor receives a request from VA personnel directing or requesting work that the Contractor believes is not within the scope of the Contract, the Contractor must notify the COR and the Contracting Officer of the request.
Only the Contracting Officer is authorized to issue changes or modifications that will affect price, quantity, or quality of performance of this contract. Additional tasking required by changes in mission assignments must be documented by a bilateral contract modification, in accordance with FAR
52.212-4(c). In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change shall be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred thereof.
https://www.id.me/ https://www.id.me/ http://www.cep.fsc.va.gov/ mailto:vafsccshd@va.gov mailto:VA.Registration@Tungsten-Network.com https://www.tungsten-network.com/ https://portal.tungsten-network.com/Login.aspx https://portal.tungsten-network.com/Login.aspx
4. FIRM-FIXED-PRICE CONTRACT: This Contract is a firm-fixed-price contract, as defined in
FAR 16.202-1. As such, the prices set forth in Section B.2 Price Schedule are, “not subject to any adjustment on the basis of the contractor’s cost experience in performing the contract.” The
Contractor shall not perform any services outside the scope of this Contract without a properly awarded bilateral modification, in accordance with FAR 52.212-4(c).
5. NONPERSONAL SERVICES CONTRACT: This Contract is a nonpersonal services contract, as defined in FAR 37.101. VA personnel will not exercise any supervision or control over Contractor personnel performing work under this Contract. Such personnel shall be accountable solely to the
Contractor, which in turn is responsible to the Government for execution of the services under this
Contract.
6. GOVERNMENT LIABILITY: The Federal Tort Claims Act (FTCA), 28 U.S.C. §§ 2671-2680, prescribes a uniform procedure for handling of claims against the United States, for money damages only, on account of damage to or loss of property, or personal injury or death, caused by the negligent or wrongful act or omission of a Government employee while acting within the scope of his or her office or employment, under circumstances where the United States, if a private person, would be liable in accordance with the law of the place where the act or omission occurred. Under the FTCA, the federal government acts as a self-insurer. See Claims Under the Federal Tort Claims Act - Office of General Counsel (va.gov) for additional information.
7. GENERAL CONTRACT REQUIREMENTS: In addition to any other requirements set forth in this Contract, the Contractor, including its employees, agents, and subcontractors (collectively “the
Contractor”), shall comply with the following requirements. Any legal violations may be a violation of Federal law resulting in charges answerable in the United States District Court.
a. Parking: It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. The VA will not invalidate or make reimbursement for parking violations of the Contractor under any conditions.
b. Check-in/Check-out Requirements: All Contractor personnel shall check-in and check-out as directed by the COR/POC, in accordance with facility requirements.
c. Drug-free Policy: All VA facilities are drug-free. Possession of non-prescribed drugs, including alcohol, marijuana, and CBD products, is prohibited.
d. Non-smoking Policy: Smoking—including all tobacco products, e-cigarettes, and vaping products—is prohibited on the entire campus, both inside and outside the VA Facility.
e. Weapons Prohibited: Possession of any type of weapon on VA property is prohibited. Enclosed containers, including tool kits, are subject to search without consent while on VA property.
f. Facility Directives: All persons shall comply with all facility directives while on-campus, including the wearing of masks as required.
g. Contractor Orientation: The Contractor, including all employees providing service under this
Contract, shall attend an orientation prior to beginning any work under this Contract, at the https://www.law.cornell.edu/uscode/text/28/part-VI/chapter-171 https://www.va.gov/ogc/ftca.asp https://www.va.gov/ogc/ftca.asp
COR/POC’s discretion. This orientation may include the following topics: Contract terms and conditions; performance monitoring; badging procedures; check-in/check-out procedures; fire and safety policies; severe weather procedures; disease transmission; infection control; disaster procedures; conduct of Contractor personnel on facility property; location of the Contractor’s workspace; and any other topic deemed necessary by the COR/POC’s. At the COR/POC’s discretion, the Contractor may be responsible for providing some or all of this information/ training to its employees, as directed by the COR/POC.
h. Employee Requirements: In addition to any other requirements set forth in this Contract, the
Contractor shall ensure that each employee performing services under this contract:
1. is fully trained, entirely competent, and otherwise meets all legal requirements for performing work under this Contract at a Government facility;
2. has all training mandated by OSHA and the VA prior to beginning any work on site, to include without limitation: infection control and prevention; CDC guidelines for PPE, including required PPE, donning, use, and disposal; and compliance with VA policies, particularly regarding patient privacy;
3. has a clear criminal record, which means no felony convictions, or misdemeanor convictions for assaultive behavior or crimes of moral turpitude;
4. can effectively communicate in, read, and understand English so that all facility alerts and warnings can be effective understood and communicated; and
5. is healthy; sick personnel shall not perform any work under this Contract.
i. Employee Uniforms: The Contractor shall provide a uniform to its employees that is easily recognizable and clearly distinguishes them as Contractor employees. The company-issued uniform shall have the name of the company clearly visible on the front of the uniform top.
Uniforms shall present a professional appearance, be clean and maintained in good repair, and shall comply with all applicable safety regulations, e.g., protective footwear. Contractor employees shall wear their Government-issued identification badges so that it is clearly visible on the front of their uniform.
j. Noninterference with Facility Functions: The Contractor shall perform its services under this
Contract in a manner that does not interfere with the facility’s functions, including maintaining all tools and equipment in an orderly fashion and cleaning the work area at the conclusion of a service visit. The Contractor shall interrupt its work at any time so as to not interfere with the normal functioning of the facility, including utility services, fire protection systems, and passage of facility patients, personnel, equipment, and carts. In the event of an emergency, Contractor services may be stopped and rescheduled to a date and time mutually satisfactory to the
Contractor and the COR, at no additional cost to the Government.
k. Safety – Infection Control Risk Assessment (“ICRA”) Requirements: During the performance of this Contract, the Contractor shall follow all ICRA requirements, as set forth by the infection control staff.
l. Safety – OSHA Requirements: The Contractor shall comply with all OSHA and CDC requirements while performing work under this Contract at any VA facility, including without limitation: use of personal protective equipment; proper placement of caution signs; and providing the COR with all Material Safety Data Sheets, as applicable, prior to beginning any work under this Contract.
m. Photography: Photographs may be taken on facility grounds only during the performance of the services provided under this Contract; photographs shall not be taken for any other reason.
Photographs shall not contain any images or personal information of patients, Government employees, or other contractor employees.
n. Legal/Professional Standards Compliance: In addition to any other requirements set forth in this
Contract, the Contractor shall ensure that all work and any required recordkeeping performed under this Contract complies with all applicable laws, regulations, ordinances, rules, policies, professional standards, and OEM standards/recommendation, including without limitation: the
Veterans Administration (VA); the Veterans Health Administration (VHA); Hines VA Hospital;
the Occupational Safety and Health Administration (OSHA); the Environmental Protection
Agency (EPA); the National Fire Protection Association (NFPA); the National Electrical Code
(NEC); Underwriters Laboratories (UL); and The Joint Commission.
o. Protection of Government Property: The Contractor shall take care to protect persons and personal/Government property while on VA property, including removal of all trash and debris at the completion of any job, and otherwise keeping the work area clean at all times. The Contractor shall be liable for any injuries and/or damage caused by the Contractor, including its employees and agents (including any subcontractors), to include all reasonable costs for medical treatment and/or damage repair. Any injuries and/or damage caused by the Contractor shall immediately be reported to the COR/POC.
p. VHA DIRECTIVE 1192.01 (Seasonal Influenza Policy): It is VHA policy that medical facilities will achieve a mandatory seasonal influenza vaccination program by requiring all HCP to receive annual seasonal influenza vaccination or obtain an exemption for medical or religious reasons.
Compliance with this directive is a condition of employment. HCP in violation of this directive may face disciplinary action up to and including removal from federal service.
Health Care Personnel (HCP) are individuals who, during the influenza season, work in VHA locations or who come into contact with VA patients or other HCP as part of their duties. VHA locations include, but are not limited to, VA hospitals and associated clinics, community living centers (CLCs), community-based outpatient clinics (CBOCs), domiciliary units, Vet centers and
VA-leased medical facilities. HCP include all VA licensed and unlicensed, clinical and administrative, remote and onsite, paid and without compensation, full- and part-time employees, intermittent employees, fee basis employees, VA contractors, researchers, volunteers and health professions trainees (HPTs) who are expected to perform any or all of their work at these facilities. HPTs may be paid or unpaid and include residents, interns, fellows and students. HCP also includes VHA personnel providing home-based care to Veterans and drivers and other personnel whose duties put them in contact with patients outside VA medical facilities.
Contractor personnel that fall under the category of HCP shall comply with VHA Directive
1192.01 by: receiving the annual seasonal influenza immunization; and providing proof of the immunization or a valid medical/religious exemption to the facility upon request. If a valid medical or religious exemption has been granted, Contractor personnel shall wear a face mask while at any VA location during influenza season (December 1 – March 31).
8. SECURITY & PRIVACY CONTROL:
a. Badging/Access: Badging and access for all Contractor personnel shall be coordinated with the
COR/POC. The Contractor shall strictly comply with all direction given by the COR and facility personnel during the badging process. Failure to comply with this requirement will be considered a material breach of this Contract.
b. Physical Security: The Contractor shall not permit its employees, including subcontractor employees, to open desk drawers, cabinets, or to use office equipment, including the use of non-pay telephones, for any purpose other than required for normal performance of duties under this
Contract.
c. Network/Data Security: The Contractor shall not connect any computing or data storage devices to the VA facility’s networks, except for publicly available Wi-Fi.
d. Contract Security: The Authorization & Accreditation (A&A) requirements of VHA Handbook
6500.6 do not apply to this requirement; therefore, a Security Accreditation Package is not required, nor is an A&A or MOU/ISA required. Sensitive information exposure as part of this contract involves applicable security controls within the facility as part of the VA Information
Security. If there are any questions related to privacy, please have a member of your staff contact the VA Privacy Service at (202) 461-6309. If there are any questions related to the information security, please have a member of your staff contact the Office of Cyber Security at (304) 262-
7733.
e. Patient Confidentiality: The Contractor shall adhere to all requirements of the Privacy Act due to the possibility that confidential medical record information may be accessible and/or visible to
Contractor employees while performing work under this Contract. The Privacy Act prohibits the disclosure of a record about an individual from a system of records, absent the written consent of the individual, unless the disclosure is pursuant to statutory exception. See Privacy Act of 1974 for additional information regarding the Privacy Act. At the COR’s direction, in the COR’s sole discretion, the Contractor shall obtain a signed Confidentiality Certificate from each employee and maintain that Certificate for inspection purposes.
[Remainder of Page Intentionally Left Blank] https://www.justice.gov/opcl/privacy-act-1974
B.2 PRICE SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1.00 JB __________________ __________________
Underground Storage Tank Fuel Cleanup/Disposal
Contract Period: Base
POP Begin: 01-22-2024
POP End: 02-29-2024
PRINCIPAL NAICS CODE: 562211 - Hazardous Waste Treatment and
Disposal
PRODUCT/SERVICE CODE: Z1GC - Maintenance of Fuel Storage
Buildings
GRAND TOTAL __________________
B.3 PERFORMANCE WORK STATEMENT
Fuel fuel/waste disposal and fuel tank cleanup services for the Atlanta VA Medical Center
A. GENERAL INFORMATION
1. Purpose: The Atlanta VA Medical Center has a requirement to procure fuel/waste disposal and fuel tank cleanup services for three decommissioned 25,000-gallon underground fuel tanks and one 550-gallon fuel tank still in use. All fuel tanks requiring these services are located at 1670
Clairmont Road, Decatur, GA 30033.
2. Background: The Atlanta VA Medical Center has four underground fuel tanks, three of which have been de-commissioned, that require the removal of old fuel and waste.
3. Scope of Work: The contractor shall perform the tasks below in accordance with Federal, State, and Local requirements for fuel handling and disposal:
➢ Remove fuel from Decommissioned 25,000-gallon tank (has approximately 1,500 gallons that is very old with water and sludge throughout);
➢ Remove fuel from 550-gallon tank (has approximately 375 gallons of fuel and is still in use);
➢ Transport and properly dispose of sludge/waste in compliance with all applicable standards listed under Paragraph C, below;
➢ Return all work areas to pre-work condition; and
➢ Certify and document that all tanks are free of waste.
4. Performance Period: This is a one-time procurement of fuel/waste disposal and UST fuel cleanup services.
5. Type of Contract: Firm-Fixed-Price.
6. Location: All services pertaining to the removal of fuel/waste and cleanup of the underground tanks will be performed at the Atlanta VA Medical Center located at 1670 Clairmont Road, Decatur, GA 30033.
7. Hours of Operation: Hospital normal hours of operation are between 8am and 4:30pm, Monday through Friday, except for the following Federal Holidays (specific dates available at Federal
Holidays (opm.gov)):
a. New Year’s Day;
b. Birthday of Martin Luther King, Jr.;
c. Washington’s Birthday;
d. Memorial Day;
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
e. Juneteenth National Independence Day;
f. Independence Day;
g. Labor Day;
h. Columbus Day;
i. Veterans Day;
j. Thanksgiving Day;
k. Christmas Day; and
l. Any other day declared a Federal Holiday by Presidential Proclamation.
B. GENERAL REQUIREMENTS
1. Permits and Licensure: The contractor shall possess all applicable permits and licenses associated with the cleaning and disposal of fuel from underground fuel storage tanks.
2. Staffing: The Contractor shall provide enough qualified personnel to fulfill all requirements of this Contract, including without limitation: transporting waste and cleaning requirements. At a minimum, the contractor shall assign a Field Supervisor who will work closely with the VA
Project Manager/Field Engineer, and a site visit will need to be coordinated before any work is performed.
3. Equipment: The Contractor shall furnish all equipment and supplies necessary to perform the work set forth in this Contract.
4. Documentation: The Contractor shall provide certify and provide documentation to the VA
Project Manager/Field Engineer confirming both USTs are empty and without waste.
C. LEGAL/PROFESSIONAL STANDARDS COMPLIANCE
1. Rules & Regulations of the State of Georgia (GA R&R).
a. Rule 391-3-11-.04 Notification of Hazardous Waste, Hazardous Secondary Material, and
Used Oil Activities.
(1) Every hazardous waste generator, hazardous waste transporter, hazardous waste transfer facility, hazardous secondary material generator, hazardous secondary material transporter, intermediate facility, verified hazardous secondary materials reclamation facility, hazardous secondary material remanufacturer, used oil transporter, used oil transfer facility, used oil processor, and owner or operator of a hazardous waste storage, treatment, or disposal facility shall notify the Division of such activities on forms provided by the Director. Very Small Quantity Generators are not required to notify. The owner or operator of a site that has ceased all regulated activities shall notify the Division that the EPA Identification Number assigned to the site should be deactivated.
(2) Any person who, on the effective date of these rules or effective date of any subsequent revisions of these rules, is generating or transporting hazardous waste or who owns or operates a hazardous waste storage, treatment, or disposal facility must notify the
Division of such activities within 90 days after these rules or revisions to these rules become effective, unless such notification has previously been provided to the Regional
Administrator of the Environmental Protection Agency in accordance with 3010 of the
Federal Act.
(3) Any person who, on the effective date of these rules or effective date of any subsequent revisions to these rules, is not generating hazardous waste and who subsequently begins to generate hazardous waste must, within 30 days after commencing such generation, notify the Division of such generation in accordance with subsection (1) above.
(4) Every hazardous waste transporter, hazardous waste transfer facility, used oil transporter, used oil transfer facility, used oil processor and owner or operator of a hazardous waste storage, treatment, or disposal facility with a physical location in Georgia shall, within 30 days after commencing such activities, notify the Division of such activities in accordance with subsection.
This notification shall be made to the Division, regardless of any notification to other states or the Environmental Protection Agency.
(5) 40 C.F.R. § 260.42 is hereby incorporated by reference.
b. Rule 391-3-15 UNDERGROUND STORAGE TANK MANAGEMENT: Rule 391-3-15-.11
Out-of-Service UST Systems and Closure.
(1) 40 C.F.R. Part 280, Subpart G, is hereby incorporated by reference.
(2) The owner or operator, or past owner or operator, of an UST system, in service on or after January 1, 1974, but taken out of service or abandoned before December 22, 1988, is not required to conduct closure activities or submit closure documents. However, corrective action is required if contamination is subsequently discovered.
(3) For all UST systems permanently closed after the effective date of these rules, a closure report, prepared on such forms as provided by EPD, must be submitted to EPD by the owner within 45 days of completion of closure.
c. Applicable Authorizing Statutes (Laws).
(1) OCGA 12-8-60 Georgia Hazardous Waste Management Act
(2) OCGA 12-13-1 Georgia Underground Storage Act
(3) OCGA 46-4-50 Georgia Underground Gas Storage Act of 1972
(4) OCGA 12-8-90 Georgia Hazardous Site Response Act
(5) OCGA 12-8-200 Georgia Brownfield Act https://public.fastcase.com/9SKwsfNqTc6OieYDhNMyM0YgZzy9umNKp%2fg%2f02lpdAbZMfZashmn5frmbc6rHcw8zOZqHvJ%2buE%2fOh9qXDFgB4A%3d%3d
(6) OCGA 12-14-1 Oil or Hazardous Spills or Releases
(7) OCGA 12-8-140 Mitigating Effect of Hazardous Materials Discharge
(8) 40 C.F.R. § 260.42 and Part 280
(9) 42 U.S.C. Chapter 82, Subchapter IX
d. Legal/Professional Standards Compliance: In addition to any other requirements set forth in this Contract, the Contractor shall ensure that all work and any required recordkeeping performed under this Contract complies with all applicable laws, regulations, ordinances, rules, policies, professional standards, and OEM standards/recommendation, including without limitation: the Veterans Administration (VA); the Veterans Health Administration
(VHA); Hines VA Hospital; the Occupational Safety and Health Administration (OSHA); the
Environmental Protection Agency (EPA); the National Fire Protection Association (NFPA);
the National Electrical Code (NEC); Underwriters Laboratories (UL); and The Joint
Commission.
e. Contractor Liability: The Contractor shall be strictly liable for compliance with all applicable laws, regulations, ordinances, and professional standards for work performed under this
Contract.
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any
Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the
Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal
Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The
Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the
Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds
Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other
Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by
EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act
(31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the
Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the
Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the
Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in
FAR 32.608-2 in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31
U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts;
18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety
Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments
(9) The specification.
(t) [Reserved]
(u) Unauthorized Obligations.
(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-
Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the
EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the
Government or any Government authorized end user to such clause.
(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
(End of Clause)
ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES
Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The following clauses are incorporated into 52.212-4 as an addendum to this contract:
C.2 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/
(End of Clause)
FAR
Number
Title Date
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT 2018
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE
MAINTENANCE
AUG 2020
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND
MATERIAL SAFETY DATA
FEB 2021
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL
BUSINESS SUBCONTRACTORS
MAR 2023
52.237-2 PROTECTION OF GOVERNMENT BUILDINGS,
EQUIPMENT, AND VEGETATION
APR 1984
852.203-70 COMMERCIAL ADVERTISING MAY 2018
852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-
OWNED SMALL BUSINESS EVALUATION FACTORS
(DEVIATION)
JAN 2023
852.215-71 EVALUATION FACTOR COMMITMENTS OCT 2019
C.3 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT
2020)
The Contracting Officer reserves the right to designate an Administrative Contracting Officer (ACO) for the purpose of performing certain tasks/duties in the administration of the contract. Such designation will be in writing through an ACO Letter of Delegation and will identify the responsibilities and limitations of the ACO. A copy of the ACO Letter of Delegation will be furnished to the Contractor.
(End of Clause)
C.4 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS
(NOV 2018)
(a) Definitions. As used in this clause—
(1) Contract financing payment has the meaning given in FAR 32.001;
(2) Designated agency office means the office designated by the purchase order, agreement, or contract to first receive and review invoices. This office can be contractually designated as the receiving entity.
This office may be different from the office issuing the payment;
(3) Electronic form means an automated system transmitting information electronically according to the accepted electronic data transmission methods and formats identified in paragraph (c) of this clause.
Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests;
(4) Invoice payment has the meaning given in FAR 32.001; and
(5) Payment request means any request for contract financing payment or invoice payment submitted by the contractor under this contract.
(b) Electronic payment requests. Except as provided in paragraph (e) of this clause, the contractor shall submit payment requests in electronic form. Purchases paid with a Government-wide commercial purchase card are considered to be an electronic transaction for purposes of this rule, and therefore no additional electronic invoice submission is required.
(c) Data transmission. A contractor must ensure that the data transmission method and format are through one of the following:
(1) VA’s Electronic Invoice Presentment and Payment System at the current website address provided in the contract.
(2) Any system that conforms to the X12 electronic data interchange (EDI) formats established by the
Accredited Standards Center (ASC) and chartered by the American National Standards Institute (ANSI).
(d) Invoice requirements. Invoices shall comply with FAR 32.905.
(e) Exceptions. If, based on one of the circumstances in this paragraph (e), the Contracting Officer directs that payment requests be made by mail, the Contractor shall submit payment requests by mail through the United States Postal Service to the designated agency office. Submission of payment requests by mail may be required for—
(1) Awards made to foreign vendors for work performed outside the United States;
(2) Classified contracts or purchases when electronic submission and processing of payment requests could compromise the safeguarding of classified or privacy information;
(3) Contracts awarded by contracting officers in the conduct of emergency operations, such as responses to national emergencies;
(4) Solicitations or contracts in which the designated agency office is a VA entity other than the VA
Financial Services Center in Austin, Texas; or
(5) Solicitations or contracts in which the VA designated agency office does not have electronic invoicing capability as described above.
(End of Clause)
(End of Addendum to 52.212-4)
C.5 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO
IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
(JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing
Appropriat…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .