36C24724P0725_1.docx
DOCX document 16 KB Posted
- Solicitation number
- 36C24724Q0248
About this file
This document is an Award Notice for a federal contract opportunity. The contract was awarded to VSS LOGISTICS LLC on May 10, 2024 for $523,826.46 under Solicitation Number 36C24724Q0248 for Off-Site Warehouse Storage Pick-up and Delivery services. The contract was set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and was awarded by the Department of Veterans Affairs, Veterans Integrated Service Network 7. The Award Notice includes details on the contract number, NAICS code, contracting office address, contracting officer, and the awardee's information. The document also contains attachments with templates for estimating adjustments to the contract amount due to changes in professional services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Award Notification- Beta Sam 36C24724P0725.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Award Notice
| SUBJECT* |
| Off-Site Warehouse Storage Pick-up and Delivery |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 30084 |
| SOLICITATION NUMBER* |
| 36C24724Q0248 |
| BASE NOTICE TYPE |
| K |
| ARCHIVE |
| 30 DAYS AFTER THE AWARD DATE |
| RECOVERY ACT FUNDS |
| N |
| PRODUCT SERVICE CODE* |
| R706 |
| NAICS CODE* |
| 561210 |
| SET-ASIDE |
| SDVOSBC |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
VISN 7 Network Contracting Office LaVista Business Park - Bldg A 2008 Weems Road Tucker GA 30084
POINT OF CONTACT*
Gail Bargaineer Gail Bargaineer Gail.Bargaineer2@va.gov 404-321-6069
AWARD INFORMATION
| AWARD NUMBER* |
| 36C24724P0725 |
| AWARD AMOUNT* |
| $523,826.46 |
LINE ITEM NUMBER
| AWARD DATE (MM-DD-YYYY)* |
| 05-10-2024 |
| AWARDEE NAME* |
| VSS LOGISTICS LLC |
| CONTRACTOR’S UEI |
| LF6WG2JTL6S9 |
AWARDEE ADDRESS LINE 1*
AWARDEE ADDRESS LINE 2*
| AWARDEE ADDRESS LINE 3* |
| 2025 LOUISVILLE RD STE C |
AWARDEE ADDRESS LINE 4*
| AWARDEE CITY |
| SAVANNAH |
| AWARDEE STATE |
| GA |
| AWARDEE ZIP CODE |
| 31415 |
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
| EMAIL DESCRIPTION |
| gail.bargaineer2@va.gov |
DESCRIPTION
ATTACHMENT I
A/E'S ESTIMATE OF ADJUSTMENT IN CONTRACT AMOUNT
Adjustments in contract amount for changes in professional services beyond contract scope covered by FAR 52.243-1 CHANGES - FIXED PRICE, ALTERNATE III (APR 1984), and SP-5, "Adjustment in Contract Amount Due to Changes", shall be computed and submitted in this format. The following explanatory notes relate to the preparation of formats a & b.
FORMAT a:
Technical Supervision (Formats a & b)
Include only personnel directly supervising production of drawings, specifications, cost estimates and related work for the project, such as Group Captain, Job Captain, Squad Boss, etc. Do not include Top Management, Middle Management, and Lower Management personnel who are included in overhead.
Travel (Format a)
Travel covers cost of transportation relating to these changes in professional services and beyond that are required by the contract.
Columns (2), (3), (4) (Format a)
Summarize totals in Columns (2), (3) and (4) obtained from Format b. Use Format a for entering other professional service cost items.
Columns (5), (6), (7)
Use these columns for entering manhours of personnel working on such items as design calculations, specifications, and cost estimating.
FORMAT b:
Use for the analysis of estimated manhours for changing or preparing drawings. Tabulate thereon the estimated manhours for performing the work referenced in circled area, Column (2), on specific drawings, Column (1).
Also show the total number of manhours for each type of work for each drawing, column (8).
Include on Format b any explanation(s) that may be helpful in the review of the proposal.
ATTACHMENT II
Format A
ESTIMATE OF ADJUSTMENT IN CONTRACT AMOUNT SUMMARY
WORK CATEGORIES | SUPERVISOR | DESIGNER | DRAFTSMAN | OTHER | SPECIFY
(1) | (2) | (3) | (4) | (5) | (6) (7) Drawings(Data from | | | | | Format b) | | | | | Design Calculations: | | | | | Structural | | | | | Electrical | | | | | Mechanical | | | | | Selection of Equipment| | | | | Revision of Equipment | | | | | Architectural- | | | | | Structural | | | | | Specification Section | | | | | Nos. | | | | | Mechanical-Electrical | | | | | Specification Section | | | | | Nos. | | | | | Construction Time | | | | | Duties | | | | |
TOTAL | | | | |
TOTAL COST BREAKDOWN
1. Supervisor ________ hrs. @ $__________/hr. $_____________
2. Designer ________ hrs @ $__________/hr. $_____________
3. Draftsman ________ hrs. @ $__________/hr. $_____________
4. Other ________ hrs. @ $__________/hr. $_____________
5. Other ________ hrs. @ $__________/hr. $_____________
6. Other ________ hrs. @ $__________/hr. $_____________
7. Total Design Costs (Lines 1 through 6) $_____________
8. Overhead & Profit @ $__________/hr.
9. Total (Lines 7 & 8) $_____________
10. Blueprinting* $_____________
11. Special Reproduction and Binding* $_____________
12. Travel* $_____________
13. Additional Item (Specify)_______________________ $_____________
14. Additional Item (Specify)_______________________ $_____________
15. GRAND TOTAL (Lines 9 through 14) $_____________
* Use additional blank sheets to explain blueprinting charges, specifications reproduction and binding charges, travel charges, etc., and other categories of work requiring explanation.
ATTACHMENT III
Format B A/E's ESTIMATE OF ADJUSTMENT IN CONTRACT AMOUNT ANALYSIS
OF ESTIMATED MANHOURS FOR DRAWINGS
DWG.NO | ITEM NO. | CODE | ESTIMATED TIME IN MANHOURS
(Ifnew |(Circleon |Letter|____________________________________________________ indicate|Drawing*) | Of | Technical | Designer | Draftsman | Total |Total this: | |Work**| Supervisor| | | | For "new") | | | | | | |Drawing
(1) | (2) | (3) | (4) | (5) | (6) | (7) | (8)
TOTAL | | | | |
* Submit blueprints of drawings requiring revision, indicating the portion of drawings which need revision by circling the portion(s) and identifying each by numbering in Column (2) above.
** For Column (3), identify type of work by use of the following code:
| A | Architectural | B | Electrical |
| L | Site Planning | H | Heating, Ventilating and Air conditioning |
| B | Subsurface(Structural) | G | Steam Geo |
| S | Structural | D | Outside Steam Distribution |
| W | Sanitary | DB Architectural Miscellaneous detail | |
| Q | Equipment(Laboratory) | FS Fallout Shelters | |
| P | Plumbing | - | Other |
ATTACHMENT IV
RELEASE OF CLAIMS
For and in consideration of the payments heretofore made, and payment of final installment now due by reason of performance of Contract No. _____________, dated ______________, the undersigned Architect/Engineer hereby releases and discharges the United States of America from any and all claims arising under or by virtue of said contract, except as follows:
(In this space describe and list in stated amounts excepted claims, if any;
otherwise this release will be considered as free of all claims.
If no claims reserved, insert NONE.)
IN WITNESS WHEREOF, This release has been duly executed this _______________________ day of _______________________.
| ______________________________________ |
| Architect/Engineer |
| BY:______________________________________ |
| (Print or type name under signature) |
| TITLE:______________________________________ |
| (Print or type) |
See attached document: Award Notification- Beta Sam 36C24724P0725.
*= Required Field Award Notice
File details come from the government source that posted it. Updated .