36C24723C0045_1.docx
DOCX document 14 KB Posted
- Solicitation number
- 36C24722R0074
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Award Notice
| SUBJECT* |
| Project 619A4-23-101 "Replace/Repair Roofs for Buildings 4, 15, 90 & 93" |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 30096 |
| SOLICITATION NUMBER* |
| 36C24722R0074 |
BASE NOTICE TYPE
| ARCHIVE |
| 30 DAYS AFTER THE AWARD DATE |
| RECOVERY ACT FUNDS |
| N |
| PRODUCT SERVICE CODE* |
| C1DA |
| NAICS CODE* |
| 541330 |
| SET-ASIDE |
| SDVOSBC |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
VISN 7 Network Contracting Office 3 FL Directors Office 3700 Crestwood Parkway Duluth GA 30096
POINT OF CONTACT*
Contract Specialist Ryan Crispin ryan.crispin@va.gov
(770) 279-1234
AWARD INFORMATION
| AWARD NUMBER* |
| 36C24723C0045 |
| AWARD AMOUNT* |
| $212,826.25 |
LINE ITEM NUMBER
| AWARD DATE (MM-DD-YYYY)* |
| 02-27-2023 |
| AWARDEE NAME* |
| RAYMOND ENGINEERING-GEORGIA, INC. |
| CONTRACTOR’S UEI |
| MVWXB9SQMJW9 |
AWARDEE ADDRESS LINE 1*
AWARDEE ADDRESS LINE 2*
| AWARDEE ADDRESS LINE 3* |
| 1035 GREEN ST SE |
| AWARDEE ADDRESS LINE 4* |
| STE A |
| AWARDEE CITY |
| CONYERS |
| AWARDEE STATE |
| GA |
| AWARDEE ZIP CODE |
| 30012 |
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
Provide Professional (PE) Architectural / Engineering services to verify existing conditions and utilities design and prepare contract working drawings and specifications for Project No. 619A4-23-101 “Replace/Repair Roofs for Buildings 4, 14 (Fire Department), 90 & 93 (Chapel)”.
The scope of work for this project is the development of construction documents (drawings and specifications, etc.) to replace deficient roofs on building 4 and 90 only. Roof repairs were completed in Building 15 and 93. Asphalt shingle and built-up roofs that are leaking and in poor condition should be replaced. The project shall include replacing gutters that show evidence of leaking and sagging. Deteriorated wood fascia and trim work will be repaired.
This will also include the install of fall protection in Building 4 and 90. Project will be inclusive of upgrading/repairing the roof insulation in all targeted buildings. Project will deem necessary to meet the minimum code insulation level of R-30.
*= Required Field Award Notice
File details come from the government source that posted it. Updated .