Award Notice
| SUBJECT* |
| Install 25,000-Gal Reserve Fuel Tank for Boiler Plant |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 30096 |
| SOLICITATION NUMBER* |
| 36C24722R0113 |
BASE NOTICE TYPE
| ARCHIVE |
| 30 DAYS AFTER THE AWARD DATE |
| RECOVERY ACT FUNDS |
| N |
| PRODUCT SERVICE CODE* |
| C1DZ |
| NAICS CODE* |
| 541330 |
| SET-ASIDE |
| SDVOSBC |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
VISN 7 Network Contracting Office 3 FL Directors Office 3700 Crestwood Parkway Duluth GA 30096
POINT OF CONTACT*
joyce.powers1@va.gov
AWARD INFORMATION
| AWARD NUMBER* |
| 36C24723C0026 |
| AWARD AMOUNT* |
| $105,807.30 |
LINE ITEM NUMBER
| AWARD DATE (MM-DD-YYYY)* |
| 01-12-2023 |
| AWARDEE NAME* |
| GATOR ENGINEERING & AQUIFER RESTORATION INC |
| CONTRACTOR’S UEI |
| T4GDE3CV7N41 |
AWARDEE ADDRESS LINE 1*
AWARDEE ADDRESS LINE 2*
| AWARDEE ADDRESS LINE 3* |
| 1928 BOOTHE CIR |
AWARDEE ADDRESS LINE 4*
| AWARDEE CITY |
| LONGWOOD |
| AWARDEE STATE |
| FL |
| AWARDEE ZIP CODE |
| 32750 |
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
Architect – Engineer (A/E) team, including architects, engineers, surveyors, and professional consultants shall provide design services for the development of specifications and drawings for the removal of two (2) 25,000-gallon underground storage tanks (USTs) used to store petroleum and the installation of one (1) new 25,000-gallon underground storage tank (UST), UG fuel piping, pumps, and controls. Atlanta VAMC uses four (4) Cleaver Brooks high-pressure, 10,000 BTU/hr, dual-fuel fired, fire tube boilers installed in 2015. Based on historical consumption data, the facility requires 6348 MMBTU to operate for 10-days in January. At 0.1396 MMBTU/gal, the facility requires 45,5000 gallons of fuel for 10-days of normal operation. A third existing 25,000-gal UST (Fuel Tank #3) is scheduled to be re-commissioned in 2023. One (1) additional 25,000-gal fuel supply tank is needed to provide required 10-day reserve fuel supply to the boiler plant, per VHA Directive 2008-062. The project includes the demolition of two (2) existing 25,000-gal, steel USTs (Fuel Tanks #1 and #2), installation of one (1) new direct-bury, double wall fiberglass type with interstitial monitoring tank-mounted submersible issue pumps and flexible fuel line.
*= Required Field Award Notice