H144-- Life Expectancy and Reliability Evaluation for Boiler, Deaerator and Condensate Tank
Solicitation number
36C24721Q0954
Issued by

View the file

Other files

File Type Posted
557-21-3-5151-0042 - SOW - EVALUATION OF BOILER LIFE EXPECTANCY.docx DOCX document
36C24721Q0954.docx DOCX document
P07- Wage Determination.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions for the Life Expectancy and Reliability Evaluation for Boiler

1. Would it be possible for you to extend the deadline by a day or so and allow us a site visit on Thursday 7/15? We are not able to extend the deadline due to the need of the service by the facility.

2. 1. In order to provide remaining life we need the original design drawings and U1’s for each piece of equipment. Can we be provided with copies of this information? According to our service line locating drawings this old may be problematic and we are not sure of what you are referring to as U1.