VA Hospital Dublin Questions.docx

DOCX document 13 KB Posted

Attached to
H930--Generator Maintenance, Inspections & Repair Dublin VAMC
Solicitation number
36C24720Q1230
Issued by

View the file

Other files

File Type Posted
Wage Determination.pdf PDF
36C24720Q1230.docx DOCX document
SOW - 557-20-4-5151-0103 - Generator Monitoring.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Hospital Dublin Questions To be more efficient, can we perform the load bank test in conjunction with the semi-annual visit?

No normally we have the semi-annual in March or April and the load bank Sept. Generally, 6 month apart.

Please provide the voltage for each unit online. Very important Generators 2,4 ,82 and 86 are 208. The rest are 480 The ones labeled TBD. Are they online or a future addition?

All units are online. TBD is referring to the VA identification number.

We need to determine if any of the generators are Natural Gas / Propane of all diesel.

All are diesel The load bank tie in points, what is the distance between my load bank machine and tie in.

They are all within 75 feet.

Are there set hours to do the work? Is after hours required?

8am—4:30pm Monday – Friday, No When doing the building load test (simulated utility failure) can that be performed during normal hours with proper notification?

Yes

File details come from the government source that posted it. Updated .