About this file

This combined synopsis/solicitation from the Department of Veterans Affairs seeks quotations for preventive maintenance services on water chillers at the Charlie Norwood VA Medical Center in Augusta, Georgia. The solicitation includes requirements for preventive maintenance inspections, repairs, and annual maintenance to be performed on York, Trane, and Carrier water chillers and variable speed drives at the medical center's Uptown and Downtown divisions over a one-year base period and four one-year options. Quotations are due by September 7, 2020 for services to begin on October 1, 2020 and include provisions for inspections, parts replacement, oil sampling, vibration analysis, and manufacturer-recommended maintenance. Offerors must have qualified technicians certified for the required work.

View the file

Other files

File Type Posted
36C24720Q1153 0002_1.docx DOCX document
36C24720Q1153 0001_1.docx DOCX document
Attachment 2 - Wage Determination.txt TXT text file
Attachment 1.1 - 52.212-3 Offeror Representations and Certifications-Commercial Items.docx DOCX document
Attachment 1 - Clauses and Provisions.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Opportunity Combined Synopsis/Solicitation Notice

PRODUCT SERVICE CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

RESPONSE DATE/TIME/ZONE

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field Contract Opportunity Combined Synopsis/Solicitation Notice J041 Preventive Maintenance on Water Chillers

- Base Plus Option Years

(VA-20-00078490)

30901 36C24720Q1153 08-21-2020

11:00 AM

EASTERN TIME, NEW YORK, USA

N

SDVOSBC

811310 Department of Veterans Affairs VISN 7 Network Contracting Activity 501 Greene Street Hatcher Building - Suite 2 Augusta GA 30901 Contract Specialist Chaz D. Bowling chaz.bowling@va.gov

(615) 440-3018 Department of Veterans Affairs Charlie Norwood VA Medical Center Uptown and Downtown Divisions 1 Freedom Way Augusta GA 30904

USA

COMBINED SYNOPSIS/SOLICITATION

GENERAL INFORMATION

Document Type:
Combined Solicitation/Synopsis
Solicitation Number:
36C24720Q1031
Posted Date:
08/24/2020
Original Response Date:
09/07/2020 11:00 AM EST
Product of Service Code:
J041
NAICS Code:
811310

Contracting Office Address Network Contracting Officer (NCO) 7 ATTN: Chaz D. Bowling Department of Veterans Affairs 501 Greene Street Hatcher Building – Suite 2 Augusta, GA 30901

Description This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, “Streamlined Procedures for Evaluation and Solicitation for Commercial Items,” as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation document will not be issued.

This solicitation is a request for quotations (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2020-07 / 08-03-2020.

The associated North American Industrial Classification System (NAICS) code for this procurement is 811310, with a small business size standard of $8.0 Million.

The Network Contracting Office 7 is seeking to Trane, York, and Carrier Water Chiller Preventative Maintenance for the Charlie Norwood Veterans Affairs (VA) Medical Center.

All questions regarding this RFQ must be in writing and may be sent by e‐mail to Chaz.Bowling@va.gov. Questions must be received no later than August 28, 2020 at 9:30 AM EST. No further questions will be accepted after that date and time.

You are reminded that representatives from your company SHALL NOT contact any VA Medical Center employees to discuss this RFQ during this RFQ process. All questions and concerns regarding this RFQ shall be directed to the Contracting Officer (CO).

All interested companies shall provide quotation(s) for the following:

CLIN(s)
Description
QTY
Measure
Unit $
Total $
0001
Water Chiller Preventative Maintenance

POP: Oct 1, 2020 to Sep 30, 2021

1
YR
1001
Water Chiller Preventative Maintenance

POP: Oct 1, 2021 to Sep 30, 2022

1
YR
2001
Water Chiller Preventative Maintenance

POP: Oct 1, 2022 to Sep 30, 2023

1
YR
3001
Water Chiller Preventative Maintenance

POP: Oct 1, 2023 to Sep 30, 2024

1
YR
4001
Water Chiller Preventative Maintenance

POP: Oct 1, 2024 to Sep 30, 2025

1
YR
Total Contract Pricing
$

Performance Work Statement (PWS) Preventive Maintenance of Water Chillers Charlie Norwood VA Medical Center (CNVAMC)

1. GENERAL INFORMATION

1.1. Purpose: The Charlie Norwood Veterans Affairs (VA) Medical Center Campus intends to procure services of a vendor to provide labor and materials to conduct preventative maintenance on York, Trane, and Carrier water chillers located at CNVAMC Uptown Building 79, Uptown Building 801, and Downtown building 802.

1.2. Background: The CNVAMC is currently seeking to contract for preventive maintenance on the water chillers located at the Uptown and Downtown locations located at 1 Freedom Way and 950 15th Street, Augusta GA

1.3. Scope of Work: The Contractor shall provide material and labor to perform the chiller preventive maintenance requirements detailed in this statement of work. Labor to include repairs to chillers

1.4. Type of Contract: Firm Fixed Price Contract

2. PERFORMANCE

2.1. Place of Performance:

Uptown Division
Downtown Division

Charlie Norwood VA Medical Center 1 Freedom Way Building 110 Augusta, GA 30904 Charlie Norwood VA Medical Center 950 15th Street Building 801 Augusta, GA 30904

2.2. Period of Performance: This contract is for a one (1) base year and four (4) one (1) year options. In accordance with 52.217-9 An option clause does not obligate the VA to exercise an option. The VA has the discretion to unilaterally exercise, or not exercise the option period. The period of performance dates are as follows:

Period
Dates
Base Year
October 1, 2020 – September 30, 2021
Option One (1)
October 1, 2021 – September 30, 2022
Option Two (2)
October 1, 2022 – September 30, 2023
Option Three (3)
October 1, 2023 – September 30, 2024
Option Four (4)
October 1, 2024 – September 30, 2025

2.3. Hours of Performance: The contractor will provide the service during the hours of operation Monday – Friday, 8:00 AM – 4:00 PM Eastern Time (ET) and is subject to change depending on the Governments need. Weekends may be added through contract modification if funds permit. Unless otherwise specified the Government observes the following holidays:

New Year’s Day
January 1
Martin Luther King’s Birthday
Third Monday in February
President’s Day
Third Monday in February
Memorial Day
Last Monday in May
Independence Day
July 4
Labor Day
First Monday in September
Columbus Day
Second Monday in October
Veterans Day
November 11
Thanksgiving Day
Fourth Thursday in November
Christmas Day
December 25

2.3.1. When one of the above designated legal holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday by United States (U.S.) Government agencies.

2.4. Delivery Hours: Deliveries are accepted between the hours of 8:00 AM and 3:30 PM ET Monday - Friday, excluding federal holidays list in the table at section 2.3. All deliveries will be processed through the warehouse location at the Uptown and Downtown Divisions located at:

Uptown Division
Downtown Division

Charlie Norwood VA Medical Center 1 Freedom Way Building 110 Augusta, GA 30904 Charlie Norwood VA Medical Center 950 15th Street Building 801 Augusta, GA 30904

3. TASK

3.1. Contractor shall perform three (3) preventative maintenance (PM) inspections;

3.1.1. During each PM visit, contractor will replace such normally replaced PM parts (oil, filters, gaskets, dryers, etc.) as may be necessary for the satisfactory functioning of the equipment. The contractor will also provide (to the COTR) oil recycle/disposal certificate(s) for all used oil removed during P.M. procedures.

3.1.2. Perform annual PM on three (3) ABB variable speed drives located in 1A1018-79 and Five (5) Eaton Electrical variable speed drives located in 1A200-802.

3.1.3. ACS shall provide all tools, computers, meters and testing equipment required to perform all PM operations.

3.1.4. Clean normal accumulation of dust and debris.

3.1.5. Inspect all assemblies, components and wiring for signs of overheating, correct condition or tighten connection as necessary.

3.1.6. Clean printed circuit boards and inspect for damage.

3.1.7. Check power supply voltages.

3.1.8. Check and verify operation.

3.1.9. Check oil return system operation

3.1.10. Check operation of motor starter and/or VSD

3.1.11. Check Voltage and current balance

3.1.12. Check sup heater and thermostat operation

3.1.13. Verify proper operating safety controls

3.1.14. Verify condenser and evaporator water flows

3.1.15. Inspect for noticeable leaks around gaskets and seals on chiller vessels, compressor and motor

3.1.16. Check and tighten all electrical components

3.1.17. Megohm motor windings

3.1.18. Clean or backflush heat exchanger

3.1.19. Lubricate motor

3.1.20. Replace starter air filters if applicable

3.1.21. Contractor will schedule all site visits with the Energy Plant Supervisor at 706-823-3932 or 706-731-7146, fourteen (14) calendar days in advance to confirm that the equipment can be serviced at a time that is agreeable

3.1.22. Contractor will maintain a sufficient stock of all parts meeting or exceeding the original manufacturer's design and specifications needed for repair and maintenance of the equipment or be able to secure needed parts within one calendar day. The VA reserves the right to inspect ACS's facility to confirm parts availability

3.2. Contractor shall perform one (1) annual Manufacture’s Preventative Maintenance (PM) Service on seven (7) water chillers and eight (8) variable speed drives;

3.3. Contractor will also provide two (2) “on-site” Scheduled (in Lieu of remote connected service visits) visits on seven (7) centrifugal chillers conducted by Manufacturers (York, Trane, and Carrier) trained technicians;

3.4. Contractor shall mechanically clean all condenser tubes and heads annually;

3.5. contractor shall also perform vibration analysis on the condenser water and chill water pump annually, providing written result and recommendation. Contractor shall provide gauge calibration testing and report for the temperature and pressure gauges on the chillers, condenser and chill water pumps with recommendation;

3.6. Contractor shall perform oil sample testing annually;

3.7. Contractor shall provide the annual Manufacture’s recommended Preventative Maintenance Service that will be made during the month of December or January;

3.8. Contractor shall perform any calibration procedures or adjustments necessary to assure accurate, reliable and safe equipment operation will be performed at this time;

3.9. Equipment to be covered under this contract:

Downtown Division, Energy Plant, Room 1A200 Uptown Division Energy Plant, Building 79, Room 1A108

1. One (1) York Millennium Water Chiller Model YTG3A4C3-CLH

2. One (1) York Millennium Water Chiller Model YTL4D8F2-CVJ

3. One (1) York Millennium Water Chiller Model YKKPKRH9-CVGS PM kit (366-94952-016)

4. One (1) York Millennium Water Chiller Model YKKPKRH9-CVGS

5. Four (4) Eaton Electrical VFD Model VS075411A-N0000

6. One (1) Eaton Electrical VFD Model VS040411A-N0000

7. One (1) Trane Chiller Model RTAA1254XN01A3D1BFGN

8. One (1) Carrier Chiller, Model 30GN-110-610

1. One (1) York Millennium Water Chiller Model YK

2. One (1) York Millennium Water Chiller Model YKHHHDJ2-CBF

3. One (1) York Millennium Water Chiller Model YKNQN4K2-CBGS

4. Three (3) ABB Variable Speed Drives Model ACH 400

4. CONTRACTORS REASONABILITY

4.1. Provide Qualified Technicians:

4.1.1. The Contractor who is performing testing and maintenance of the equipment shall be certified technicians to perform the required testing on the identified ceiling patient lifts. Technicians shall be chlorofluorocarbon (CFC) certified at all times during the performance of this contract;

4.1.2. Technicians shall be trained and certified for any preventative maintenance and repair work on York, Trane, and Carrier (manufacturers) Water Chillers and equipment. Service representatives or technicians must be manufacturer trained on all items listed in the equipment schedule located at section 3.9;

4.1.3. Prefer technicians to have a minimum of two (2) years’ experience inspecting and working with York, Trane, and Carrier (manufacturers) water chillers and equipment.

4.2. Contractor will provide OEM parts and labor to conduct any repairs;

4.3. Contractor will work with the Contract Officer Representative (COR) to schedule maintenance;

4.4. Contractor is responsible to replace any items damaged by the contractor employees or sub-contractor employees;

4.5. Contractor is always responsible to keep work area clean preventing safety hazards to patients and medical staff. All debris shall be removed before contractor personnel at the end of the workday;

4.6. Contractor shall be licensed to perform this service in the State of Georgia and provided the Government with all licenses and certifications needed. All licenses and certifications will be in the Prime Contractors name.

4.7. During the renewal years the annual PM the contractor will mechanically clean all condenser tubes and heads and will also perform vibration analysis on the main compressor and motor bearings of each water chiller. Written results with recommendations of the vibration analysis and oil sample testing will be provided to the Contracting Officer (CO) and COR within 10 workdays of test completion

5. GOVERNMENT RESPONSIBILITY

5.1. COR shall ensure that all contracted technicians are trained in proper repair methods and have current badges to enter the facilities.

5.2. COR shall ensure that all work areas are available at the time services begin.

5.3. COR shall ensure that all background checks have been cleared and results shall be provided to the Contracting Officer (CO) for electronic filing.

5.4. Scheduling will be arranged with the COR/ACOR. Contractors do not need to be supervised by Veteran Affairs employees at all times but do need to check in with the designated person onsite at beginning of each workday. Contractor shall follow local policy in providing appropriate identification to on-site contractors. The facility COR will designate the person to check in with at each facility to provide identification.

5.5. COR shall notify the contractor of any changes in services that have been scheduled.

6. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

6.1. Methods of Surveillance

6.1.1. The COTR shall use the surveillance methods listed below in the administration of this QASP;

6.1.1.1. Direct Observation: Individual inspections of repairs and maintenance services;

6.1.1.2. Periodic Inspection: Inspections will be scheduled annually and after repairs and maintenance;

6.1.1.3. User Survey: Customer complaints;

6.1.1.3.1. Complaints are investigated and validated

6.2. Performance Standards:

Performance Indicators
PWS Ref
Performance Measure
Acceptable Level of Quality
Method of Assessment
Incentive
Dis-incentive
Must be able to provide all equipment and parts needed to perform the service
3
No more than one incident a year
95%
Periodic Sampling and Validated Customer Complaints
Positive Past Performance

Options Awarded Poor past performance / negative CPARS

Must have qualified personnel perform services. Must have valid certifications to perform this type work
4.1
Must have qualified personnel that has performed this type work in Hospital
100%
Direct Observation and Periodic Inspection
Positive Past Performance

Options Awarded Poor past performance / negative CPARS

Must be able to perform job as scheduled in a timely manner
3
No more than 10 untimely inspections annually
95%
Direct Observation and Periodic Inspection
Positive Past Performance

Options Awarded Poor past performance / negative CPARS

7. INVOICING

7.1. Payment will be made upon receipt of a properly prepared detailed invoice, prepared by the Contractor, validated by the COR, and submitted electronically through OB-10.

7.2. A properly prepared invoice will contain:

7.2.1. Invoice Number and Date

7.2.2. Contractor’s Name and Address

7.2.3. Accurate Purchase Order Number

7.2.4. Supply or Service provided

7.2.5. Total Amount Due

8. CHANGES TO THE STATEMENT OF WORK

8.1. Any changes to this PWS shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor.

9. CONFLICT OF INTEREST:

9.1. The Contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of Veterans Affairs. Nor shall the Contractor employ any person who is a member of the immediate family of a VA employee, if the employment of that family member would create a conflict of interest, or the appearance of a conflict of interest, particularly with regard to influencing the contract negotiations, terms of the contract or the work carried out under the contract. In any such case VA must review the matter and give its approval in accordance with agency ethics rules.

(End of PWS)

See attached document: Attachment 1 - Clauses and Provisions.

See attached document: Attachment 1.1 - 52.212-3 Offeror Representations and Certifications-Commercial Items.

See attached document: Attachment 2 - Wage Determination.

File details come from the government source that posted it. Updated .