RFQ AMENDMENT__36C24720Q0272 0001__AmeriWater MediQA Reverse Osmosis System PM and Repair Services.pdf

PDF 185 KB Posted

Attached to
Hemodialysis Reverse Osmosis System Preventive Maintenance and Repair Services
Solicitation number
36C24720Q0272
Issued by

About this file

This document contains a solicitation for hemodialysis reverse osmosis system preventive maintenance and repair services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7 is seeking these services for the AmeriWater Hemodialysis Reverse Osmosis System and four portable reverse osmosis systems at the Columbia VA Health Care System located in Columbia, South Carolina. The period of performance is a 12-month base period starting July 8, 2020 through July 7, 2021 plus four additional one-year option periods. Interested Service-Disabled Veteran-Owned Small Businesses shall provide quotes in response to solicitation number 36C24720Q0272 by 4:00 PM on June 29, 2020 addressing the requirements in the statement of work including preventative maintenance, repairs, certifications, and reports. Award will be made based on price to the most advantageous response.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 10

Department of Veterans Affairs

W.J.B. Dorn VA Medical Center

6439 Garners Ferry Road

Columbia SC 29209-1639

Department of Veterans Affairs

W.J.B. Dorn VA Medical Center

6439 Garners Ferry Road

Columbia SC 29209-1639

To all Offerors/Bidders

36C24720Q0272

06-23-2020

X

See CONTINUATION Page

X 1

The purpose of this solicitation amendment is to:

1. Extend the response date from 29 June 2020 @ 4PM to 02 July 2020 @ 4PM.

2. Change estimated contract PoP; now reads 08 July 2020 - 07 July 2025.

3. Add "including a viable Dual DI Tank System" to section (5)(D)(b) of the SOW.

All other terms and conditions within the solicitation remain unchanged.

Statement of Work

Hemodialysis Reverse Osmosis System

Preventive Maintenance and Service Coverage

1. REQUIREMENT:

This requirement is for a firm-fixed price service contract for preventative maintenance and repair service coverage for the AmeriWater MediQA hemodialysis central Reverse Osmosis

(R.O.) water purification system as well as four (4) AmeriWater Centurion portable R.O. systems owned by the Columbia VA Health Care System, Columbia, SC utilized by the Nephrology department. Specific models and serial numbers are listed in the performance requirements below.

2. BACKGROUND:

The CVAHCS Medical Center is a 216-bed facility, encompassing acute medical, surgical, psychiatric, and long-term care. The hospital is located in Columbia, South Carolina and provides primary, secondary, and some tertiary care. Annually, the Medical Center serves approximately 56,116 patients. Satellite outpatient clinics are located in Anderson, Greenville, Florence, Orangeburg, Rock Hill, Sumter, and Spartanburg, South Carolina.

The Nephrology service for the facility owns and operates a central R.O. water purification system that provides treatment water to sixteen hemodialysis stations. Additionally, the facility owns four (4) portable R.O. systems that are used with the dialysis machines when they are providing treatment in the ICU ward. At least weekly, these systems receive heat disinfection along with monthly acid-based disinfection in order to prevent any bacterial or negative growth within the systems.

The dialysis unit sees patients weekly, Monday – Saturday from 04:30am – 6:30pm.

3. PERIOD OF PERFORMANCE:

This is a requirement for semi-annual preventive maintenance services and repair service coverage. This requirement is for Base year and four (4) renewal options. The Period of performance shall be as follows:

BASE YEAR July 08, 2020 through July 07, 2021

OPTION YEAR 1 July 08, 2021 through July 07, 2022

OPTION YEAR 2 July 08, 2022 through July 07, 2023

OPTION YEAR 3 July 08, 2023 through July 07, 2024

OPTION YEAR 4 July 08, 2024 through July 07, 2025

Due to the operations requirements of the hemodialysis section, work cannot be performed during normal hours and must be accomplished during non-working hours, 6:30 PM or later EST

Monday through Friday except federal holidays. If extended hours are required by the contractor, they must notify COR/ACOR and the owning department prior to scheduling the work.

4. PLACE OF PERFORMANCE:

WJB Dorn VA Medical Center

6439 Garners Ferry Road

Columbia, SC 29209

The equipment is located in Building 100 within the Hemodialysis department (fifth floor, north wing). Please schedule with COR/ACOR prior to any service visits.

5. PERFORMANCE REQUIREMENTS:

A. A Contracting Officer Representative (COR) and/or Alternate Contracting Officer

Representative (ACOR) shall be assigned to this procurement and written notification shall be provided to the Contractor after award.

a. Scheduling of work performance shall be arranged through the designated

COR/ACOR assigned.

B. The Contractor shall provide full Preventive Maintenance and repair service coverage for the AmeriWater MediQA hemodialysis central Reverse Osmosis (R.O.) water purification system with an integrated HeatSan disinfection system, as well as four AmeriWater

Centurion portable R.O. systems owned and used by the Columbia VA Healthcare

System. A breakdown of the services to be provided is as follows:

a. Preventive Maintenance, in accordance with manufacturer recommendations and the following requirements, on all equipment listed in this SOW.

i. Central Reverse Osmosis (R.O.) System

Weekly Requirements:

1. Each week, the vendor shall provide either a recommended disinfection or cleaning, depending on system schedule.

Bi-weekly Requirements:

1. Disinfect central R.O. loop piping, rotating the use of a manufacturer-approved acid cleaner and bleach.

2. Clean the R.O. system with manufacturer recommended cleaning solution.

3. Draw AAMI water samples and prepare for shipping to VA hospitals’ lab of choice

Monthly Requirements:

1. Disinfect central R.O. and R.O. water loop piping

2. Replace two (2) 20” 5µm BB system pre-filters

3. Replace one (1) R.O. pre-filter 5µm 20” BB

4. Draw AAMI water samples and prepare for shipping to VA hospitals’ lab of choice

5. Test and calibrate R.O. system to manufacturers’ specifications

6. Test and calibrate R.O. system and heat disinfection monitors and alarms.

7. Provide minimum of 10 bags of salt for brine tank.

8. Review system operations and log book for discrepancies.

9. Check operation of all timers and control valves.

10. Inspect carbon filters for integrity and expected life.

11. Inspect ultraviolet (UV) light and clean UV quartz sleeve when serviced.

12. Inspect and ensure all internal pressures, flow rates, water qualities, membrane effectiveness, electrical interlocks, and protection devices are in operating order and are performing to manufacturers’ recommended specifications.

13. Inspect water distribution system to check for proper operation and integrity, and ensure distribution system loop pressure is ideal.

14. Prepare monthly written report and supply it to the Biomedical

Engineering department by the first week of each month.

15. Clean and disinfect R.O. with manufacturers’ recommended acid cleaning solution.

Quarterly Requirements:

1. Clean and disinfect R.O. with manufacturers’ recommended cleaning solution.

2. Check system booster pump and ensure system operation.

Semi-Annual Requirements:

1. Replace 0.2µm endotoxin filter

2. Replace UV bulb and quartz sleeve

Annual Requirements:

1. Re-bed two (2) 8 cubic foot carbon tanks with standard carbon

2. Replace UV bulb and sleeve

3. Clean brine tank

4. Clean incoming water blending valves

5. Perform full Preventive Maintenance on R.O. system as per the manufacturer guidelines.

ii. Portable R.O. system Preventive Maintenance (quantity 4)

Monthly Requirements:

1. Replace one 20” 1µm pre-filter per portable R.O.

2. Clean and disinfect with manufacturers’ recommended acid cleaning solution

3. Exchange two 20” carbon block filters per portable R.O.

4. Test and calibrate all monitors and alarms to ensure normal functioning

5. Draw AAMI water samples and prepare for shipping to VA hospitals’ lab of choice for

Quarterly Requirements:

1. Draw AAMI water samples and prepare for shipping to VA hospitals’ lab of choice for

Annual Requirements:

1. Replace one ultra-filter per portable R.O.

2. Perform Preventive Maintenance as per manufacturer requirements

b. Services and parts to restore damaged equipment to its normal operating condition.

c. Any and all replacement parts must be Original Equipment Manufacturer (OEM) supplied parts.

d. All software and firmware updates required or recommended by the manufacturer, including proprietary operating system software enhancements.

e. Performance verification will be required at the conclusion of every preventive maintenance and emergency repair event. This verification procedure shall include performance testing for accuracy and precision of the system.

f. Each maintenance will include inspection for internal and/or external causes of mechanical, electrical, of software-related system failures.

C. Contractor shall provide all personnel, parts, tools, test equipment, service manuals, computer software and necessary upgrades/patches/firmware changes, applications support and schematics necessary to effect repairs and preventive maintenance procedures on the listed equipment. Due to the operations requirements of the hemodialysis section, work cannot be performed during normal hours and must be accomplished during non-working hours, 6:30 PM or later EST Monday through Friday except federal holidays. The following equipment shall be covered under this contract:

MODEL PART NUMBER SERIAL NUMBER

AmeriWater MediQA Central R.O. MQ14004

AmeriWater Centurion 1500+ Portable R.O. 40129

AmeriWater Centurion 1500+ Portable R.O. 40111

AmeriWater Centurion 1500+ Portable R.O. 40198

AmeriWater Centurion 1500+ Portable R.O. 40179

D. The Contractor’s service representative (CSR) shall contact the COR/ACOR to schedule an inspection or prior to responding to a service call.

a. CSR shall acknowledge receipt of a service call within 2 hours and shall arrive on the premises to effect repairs within 24 hours.

b. CSR shall provide, upon request, suitable loaners (including a viable Dual DI

Tank System) for contracted equipment that shall be out of service for more than

48 hours.

i. Equipment repaired by the CSR or loaned to the Medical Center by the contractor shall be calibrated and safety tested by the CSR before being placed into service.

ii. CSR shall not deviate from this protocol without the prior approval of designated COR.

E. The contractor’s service representative shall present the field service report to a representative of COR/ACOR for an authorized signature, leaving one legible copy for inclusion in the individual equipment’s Historical Maintenance Record. Contractor shall also provide COR/ACOR with a legible copy of the calibration reports including numerical values of measurements taken within 5 business days.

F. Preventive maintenance shall include, but not be limited to the following:

a. Electrical safety testing

b. Lubrication

c. Adjustments

d. Calibration

e. Testing and replacement of faulty parts and parts which are likely to fail at no additional charge

f. Returning the instruments or equipment to the operating conditions specified by the manufacturer, NFPA 99 and VA MP-3 guidelines.

G. The contractor shall be responsible for providing and applying any and all recommended manufacturer’s software updates, upgrades, and patches during the execution of this contract. Timing and device availability shall be coordinated with COR/ACOR.

EXPERIENCE/CERTIFICATION

All work shall be performed by competent, experienced personnel qualified to work on the specified equipment in accordance with good manufacturing practices. Prior to award, contractor shall provide factory training certificates/competencies for all technicians assigned to service the specified equipment, in accordance with JCAHO standards. Technicians assigned to provide services to the equipment shall provide evidence of OEM training in the form of factory training certificates that are within their expiration date. These OEM certifications shall clearly identify the technicians’ name, the training center, and the equipment the technician was trained to service. Technicians shall provide certifications that indicate they were trained on all items / equipment listed as to be covered under this contract. Such certificates/competencies are to be submitted to COR/ACOR within 30 days from date of contract award. Failure to provide required documentation shall result in non-payment of invoices for this service.

Per ISO 9001, contractor shall list all the test equipment that had been used along with the details on the service report during any service associated with the medical equipment to include, but not limited to:

• Test equipment name

• Equipment Calibration due date

• Model

• Serial number

• Manufacturer

REPORTS:

The Contractor’s Service Representative shall present a Field Service Report to the designated

COR for an authorized signature, leaving one legible copy for inclusion in the individual

Equipment’s Historical Maintenance Record.

Contractor shall provide the designated COR with a legible copy of the Calibration Reports including numerical values of measurements taken within five (5) business days.

A copy of the Preventive Maintenance Inspection procedure (including Qualitative and

Quantitative tests) used by the Contractor Service Representative for each item listed on the contract, shall be made available upon request.

SAFETY:

Contractor shall ensure all tools and equipment are secured at all times.

• Tools and equipment must be removed from open areas or stored in secured location during breaks, lunch, and/or at the end of each workday.

• All debris must be removed from the facility upon completion of service each day.

Operation of the equipment for testing, servicing, or any other purpose shall be done only in secured areas designated by the COR/ACOR and away from the general patient population.

Contractor shall ensure proper signage and/or blockage of service area is provided and clearly visible to ensure patient/employee safety is adhered to.

Smoking is not permitted within the facilities at any time. All smoking shall be conducted in designated smoking areas only.

6. INVOICES:

a. Payment shall be made monthly in arrears, invoices shall be prepared by the Contractor, and submitted through Tungsten Network (formerly known as OB10) http://www.tungsten-network.com/us/en/. A properly prepared invoice shall contain:

✓ Invoice Number and Date

✓ Contractor’s Name and Address

✓ Accurate Purchase Order Number

✓ Supply or Service provided

✓ Period Supply or Service Provided

✓ Total Amount Due

b. Please begin submitting your electronic invoices through the Tungsten Network for payment processing, free of charge.

c. If you have questions about the e-invoicing program or Tungsten Network, contact information is as follows:

• Tungsten e-Invoice Setup Information: 1-877-489-6135

• Tungsten e-Invoice email: VA.Registration@Tungsten-Network.com

• FSC e-Invoice Contact Information: 1-877-353-9791

• FSC e-invoice email: vafsccshd@va.gov

d. Web Address: HTTP://WWW.FSC.VA.GOV/EINVOICE.ASP

7. TERMINATION FOR CONVENIENCE: In accordance with FAR 52.212-4 (l) The

Government reserves the right to terminate this contract, or any part hereof, for its sole convenience.

8. RECORDS MANAGEMENT LANGUAGE FOR CONTRACTS:

The following standard items relate to records generated in executing the contract and should be included in a typical Electronic Information Systems (EIS) procurement contract:

http://www.tungsten-network.com/us/en/ http://www.tungsten-network.com/us/en/ mailto:VA.Registration@Tungsten-Network.com http://vafsccshd@va.gov http://www.fsc.va.gov/EINVOICE.ASP

a. Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29, 31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR

Part 1222 and Part 1228.

b. Contractor shall treat all deliverables under the contract as the property of the U.S.

Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.

c. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.

d. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.

e. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.

f. The Government Agency owns the rights to all data/records produced as part of this contract.

g. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.

h. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the

Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].

i. No disposition of documents shall be allowed without the prior written consent of the

Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.

File details come from the government source that posted it. Updated .