36C24719R0031-009.docx
DOCX document Posted
- Solicitation number
- 36C24719R0031
About this file
36C24719R0031 36C24719R0031.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24719C0210-000.docx | DOCX document | |
| 36C24719R0031-010.pdf | ||
| 36C24719R0031-009.docx | DOCX document | |
| 36C24719R0031-010.pdf | ||
| 36C24719R0031-008.docx | DOCX document | |
| 36C24719R0031-008.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24719R0031
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
679-19-1-5533-0002 36C24719R0031 09-18-2019 Kevin Warren 706-733-0188 ext. 1128 09-23-2019 4:00 P.M.
36C247 Department of Veterans Affairs VISN 7 Network Contracting Activity 501 Greene Street Hatcher Building - Suite 2 Augusta
GA
30901 X X 221114 250 Employees Net 30 N/A X 36C247 Department of Veterans Affairs VISN 7 Network Contracting Activity 501 Greene Street Augusta
GA
30901 36C247 Department of Veterans Affairs VISN 7 Network Contracting Activity 501 Greene Street Hatcher Building - Suite 2 Augusta
GA
30901
Department of Veterans Affairs
FMS-VA-2 (101)
Financial Services Center P.O. Box 149971 Austin
TX
78714-9971 See CONTINUATION Page Services Non Personal: Routine and rapid response corrective maintenance of Solar PV systems throughout the Veterans Affairs,VHA VISN 7 facilities accordance with the Performance Work Statement .
Email Submissions to Kevin.Warren2@va.gov COR: James Zellander (205) 933- 8101 ext. 5276 CO: Laurinda Millage -laurinda.millage@va.gov POC: Kevin Warren, Kevin.Warren2@va.gov Period of Performance is October 1, 2019 through September 30, 2020 with four optional years of performance.
Refer to the solicitation provision at FAR 52.212-1 for Submission insructions.
See CONTINUATION Page X X X Laurinda Millage Supervisory Contracting Office Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 PRICE/COST SCHEDULE | 4 |
| ITEM INFORMATION | 4 |
| B.3 DELIVERY SCHEDULE | 6 |
| PERFORMANCE WORK STATEMENT | 7 |
| SECTION C - CONTRACT CLAUSES | 16 |
| C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT 2018) | 16 |
| C.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (MAY 2019) | 21 |
| C.3 52.216-1 TYPE OF CONTRACT (APR 1984) | 29 |
| C.4 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 29 |
| C.5 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (DEC 2009) | 29 |
| C.6 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION) | 30 |
| C.7 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 31 |
| C.8 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 31 |
| C.9 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984) | 32 |
| C.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 33 |
| C.11 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 33 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 34 |
| SECTION E - SOLICITATION PROVISIONS | 35 |
| E.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 35 |
| E.2 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (OCT 2018) | 36 |
| E.3 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (OCT 2018) | 42 |
| E.4 52.233-2 SERVICE OF PROTEST (SEP 2006) | 59 |
| E.5 VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESS EVALUATION FACTORS (JUL 2016)(DEVIATION) | 60 |
| E.6 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 60 |
| E.7 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 61 |
| E.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 61 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C247 Laurinda Millage Department of Veterans Affairs VISN 7 Network Contracting Activity 501 Greene Street Hatcher Building - Suite 2 Augusta GA 30901
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] Bi Annually |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Department of Veterans Affairs
FMS-VA-2 (101)
Financial Services Center P.O. Box 149971 Austin TX 78714-9971 ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2.00 |
| EA |
| __________________ |
| __________________ |
Contractor shall provide all maintenance and repair services for all Solar PV systems in VISN 7 Solar PV systems including the locations in Tuscaloosa, AL., Montgomery, AL., Dublin GA., Augusta, GA. and Columbia, SC in accordance with the performance work statement (PWS).
Contract Period: Base POP Begin: 09-25-2019 POP End: 09-24-2020
| 1.00 |
| YR |
| __________________ |
| __________________ |
Replacement Parts and Service of Non Warranty Covered Items Negotiated at time of repair. Not to Exceed Contract Line Item
| 2.00 |
| EA |
| __________________ |
| __________________ |
Contractor shall provide all maintenance and repair services for all Solar PV systems in VISN 7 Solar PV systems including the locations in Tuscaloosa, AL., Montgomery, AL., Dublin GA., Augusta, GA. and Columbia, SC in accordance with the performance work statement (PWS).
Contract Period: Option 1 POP Begin: 09-25-2020 POP End: 09-24-2021
| 1.00 |
| YR |
| __________________ |
| __________________ |
Replacement Parts and Service of Non Warranty Covered Items Negotiated at time of repair. Not to Exceed Contract Line Item
| 2.00 |
| EA |
| __________________ |
| __________________ |
Contractor shall provide all maintenance and repair services for all Solar PV systems in VISN 7 Solar PV systems including the locations in Tuscaloosa, AL., Montgomery, AL., Dublin GA., Augusta, GA. and Columbia, SC in accordance with the performance work statement (PWS).
Contract Period: Option 2 POP Begin: 09-25-2021 POP End: 09-24-2022
| 1.00 |
| YR |
| __________________ |
| __________________ |
Replacement Parts and Service of Non Warranty Covered Items Negotiated at time of repair. Not to Exceed Contract Line Item
| 2.00 |
| EA |
| __________________ |
| __________________ |
Contractor shall provide all maintenance and repair services for all Solar PV systems in VISN 7 Solar PV systems including the locations in Tuscaloosa, AL., Montgomery, AL., Dublin GA., Augusta, GA. and Columbia, SC in accordance with the performance work statement (PWS).
Contract Period: Option 3 POP Begin: 09-25-2023 POP End: 09-24-2024
| 1.00 |
| YR |
| __________________ |
| __________________ |
Replacement Parts and Service of Non Warranty Covered Items Negotiated at time of repair. Not to Exceed Contract Line Item
| 2.00 |
| EA |
| __________________ |
| __________________ |
Contractor shall provide all maintenance and repair services for all Solar PV systems in VISN 7 Solar PV systems including the locations in Tuscaloosa, AL., Montgomery, AL., Dublin GA., Augusta, GA. and Columbia, SC in accordance with the performance work statement (PWS).
Contract Period: Option 4 POP Begin: 09-25-2024 POP End: 09-24-2025
| 1.00 |
| YR |
| __________________ |
| __________________ |
Replacement Parts and Service of Non Warranty Covered Items Negotiated at time of repair. Not to Exceed Contract Line Item
| GRAND TOTAL |
| __________________ |
B.3 DELIVERY SCHEDULE
| ITEM NUMBER |
| QUANTITY |
| DELIVERY DATE |
| 0001 |
| SHIP TO: |
| VISN 7 Wide |
Birmingham, AL 35233 United States
2.00
| MARK FOR: |
| James Zellander |
205-933-8101 ext. 5276 James.Zellander@va.gov
1.00
| 0101 |
| SHIP TO: |
| VISN 7 Wide |
Birmingham, AL 35233
2.00
| MARK FOR: |
| James Zellander |
1.00
| 0201 |
| SHIP TO: |
| VISN 7 Wide |
Birmingham, AL 35233
2.00
| MARK FOR: |
| James Zellander |
1.00
| 0301 |
| SHIP TO: |
| VISN 7 Wide |
Birmingham, AL 35233
2.00
| MARK FOR: |
| James Zellander |
1.00
| 0401 |
| SHIP TO: |
| VISN 7 Wide |
Birmingham, AL 35233
2.00
| MARK FOR: |
| James Zellander |
1.00
Page 1 of Page 1 of
PERFORMANCE WORK STATEMENT
FOR
VISN 7 SOLAR PV MAINTENANCE SERVICES
1. DESCRIPTION OF SERVICES:
This is a complete service contract for Routine Maintenance as well as a Rapid Response Corrective Maintenance Component and for the proper functioning of the Solar PV systems at the following VISN 7 Department of Veterans Affairs Medical Centers (VAMCs) Tuscaloosa, Alabama, Montgomery, Alabama, Dublin Georgia, Augusta Georgia and Columbia, South Carolina. The preventative maintenance program is designed to ensure all aspects of each system is installed and working in the most efficient means possible, ensuring maximum generation capacity. The corrective maintenance portion is designed to quickly address any component/system failures that unexpectedly arise resulting in lost production. This contract is for a base year and 4 option years to cover the Solar PV systems as listed, for each of the years. Contractor will provide at contractor’s expense all supervision, tools, materials, supplies, equipment and labor to perform the work. Site Visits can be arranged for field verification.
LISTING LOCATIONS OF SOLAR PV SYSTEMS:
Facility
| PV Capacity |
| Types of Structures for PV |
| Number of Panels |
| Augusta |
| 1.26 MW |
| 2 Acre Ground Mount |
| 3900 |
| Dublin |
| 185KW |
| Rooftop, Canopy |
| 800 |
| Montgomery |
| 400 KW |
| Rooftop, Ground Mount |
| >1400 |
| Tuscaloosa |
| 2.6 MW |
| 4 Acre Ground Mount, 3 Canopy Structures |
| >3000 |
| Columbia |
| 1.3 MW |
| 3 Parking canopies |
| >3000 |
1. Scope of Work - Preventative Maintenance: Contractor shall conduct 2 planned preventative maintenance visits per facility per year. Contractor will coordinate with the staff at the VA Medical Center to determine the most reasonable time to conduct preventative maintenance visits. The VAMC is expecting the following during preventative maintenance visits for each facility where applicable:
· Inspect all electrical equipment for water-tight integrity, cleanliness and proper operation.
· Grounding components will be checked for integrity.
· Conduct electrical checks to verify performance of the solar PV array.
· Ground-mounted systems will be inspected for structural integrity, corrosion and erosion.
· The monitoring system will be analyzed to verify satisfactory system performance.
· Thoroughly clean all solar PV panels in the array.
· Mow and trim the grass inside the solar PV array fenced in area (where applicable per facility).
· Replace any required NEC markings that are worn or faded.
A preventative maintenance report shall be provided to the COR and facility Energy Manager that will show the results of the site visit and explain any corrective actions that were taken, to include information regarding any corrective maintenance visits.
2. CORRECTIVE MAINTENANCE:
Contractor shall review monitoring system information weekly to determine if there is any corrective action needed. In the event of a situation that requires corrective action, contractor shall inform the COR and facility Energy Manager at the VAMC. Within 3 days of becoming aware of any malfunction, contractor is required to inform the COR and facility Energy Manager at the VAMC of plans for repair. With respect to corrective maintenance, contractor shall respond within 48 hours of notification of a system/component failure that results in lost production. The following is a list of items to be completed as part of the corrective maintenance program:
· The monitoring system will be utilized to gain as much information as possible to identify the fault/failure.
· Once on site, information will be gathered, and a troubleshooting plan established to identify the failure/fault. Once the fault is identified, it will be determined what the nature of the failure was, if the failure is a warranty covered failure, and what actions are required to correct the failure.
· If the failure will be covered under warranty, contractor shall coordinate with the respective vendor to correct the fault/failure. If the failure is the result of some action that will not be covered under warranty, contractor shall notify the COR and facility Energy Manager and determine what actions the VA desires to be taken towards correcting the fault/failure. Most faults that occur are such that the contractor can identify and correct them on the spot. Any fault covered under warranty and requiring coordination with the vendor for tech support/replacement parts will be closely managed/supervised by the contractor to ensure prompt action. A detailed maintenance report will be provided following each visit.
Any damage, fault or other malfunction resulting from workmanship, manufacturing defect, blown fuse, or any other fault/failure covered by a manufacturer’s warranty shall be corrected by the contractor. Corrections such as blown fuses, loose connections, etc. shall be corrected on the spot. Any correction that will require coordination with vendor for replacement parts related to warranty coverage shall be coordinated by and corrected by the contractor.
Any fault/failure or damage resulting from actions/incidents which falls outside of workmanship or warranty coverage specifications may be corrected by the contractor at the direction and expense of the VA. Any such failure will be noted on the inspection report and specifically addressed with the COR and facility Energy Manager prior to contractor departure from the site.
3. REPORTING:
For repairs or services that will be performed during normal working hours, the Contractor repairman must notify the Facility’s Energy Manager. Contractor will need to obtain an Identification Badge which shall be worn at all times while on station. After all work is completed, the Contractor must notify the facility’s Energy Manager of completion. A service report will be sent to the COR and Facility Energy Manager following the completion of site visits.
· For repairs or services required after normal working hours the Contractor’s repairman shall notify the Facility’s Energy Manger for coordination.
4. PERFORMANCE AND DELIVERABLES:
The Contractor must respond in accordance with above maintenance descriptions. All work must be performed by competent personnel who are experienced and qualified to work on the specific equipment. All work performed shall be accomplished in accordance with the manufacturer’s instructions including, but not limited to, adjustments, calibrations, cleaning, lubrication, testing, disassembly, check-out, replacement of worn or defective parts, etc., required to keep the equipment in operating condition. Contractor’s maintenance of the equipment must satisfy all requirements as set forth by NFPA, OSHA, ASME and JCAHO. Contractor must ensure all trash and debris is removed from site after work is completed.
| Deliverables |
| PWS Section |
| Performance Standard |
| AQL |
Planned Preventative Maintenance Visits
| 1 |
| Setup and Coordination with Energy Managers for schedule visits |
| Services shall be performed within 5 days of being scheduled. |
| Performance Maintenance/Service of PV systems in accordance with PWS |
| 1 |
| Section 1 of PWS objectives are meet and satisfied |
| No maintenance service items shall be missed |
Corrective Maintenance
| 2 |
| Section 2 of PWS objectives are meet and satisfied |
| System Functions 95% of time. |
Reporting
| 3 |
| Section 3 of PWS objectives are meet and satisfied |
| Reports are received within 5 working days following work completion |
Performance
| 4 |
| Section 4 of PWS objectives are meet and satisfied |
| Requirements met 100% of time |
5. PEFORMANCE PERIOD:
The services shall be within five days after contract award authorizes the services for a base period of twelve (12) months with four (4) twelve (12) month option periods.
6. KEY PERSONNEL:
Approval of Key Personnel, as specified in Contractor’s Technical Proposal who will be working on this project, must be obtained from the Government within five business days of any change in these Key Personnel. The Contractor’s Project Manager is a Key Person as defined by this section.
A. CONTRACTOR PERSONNEL REQUIREMENTS
The Contractor shall provide personnel capable of performing routine maintenance as well as a rapid response corrective maintenance component, all related industry and governmental departments instructions and regulations for successful accomplishment of the work to be performed under this contract. Additionally, all personnel shall pass a Government specified background investigation prior to working with Personally Identifiable Information. The position sensitivity for this effort has been designated as Low Risk and the level of background investigation is a National Agency Check with Written Inquiries. All personnel shall be U.S. Citizens. The Contractor will coordinate with the COR for all Security Issues.
7. HOURS OF WORK:
This contract shall include all necessary service calls seven (7) days per week, between the hours of 8:00a.m. and 4:30p.m. Central Standard Time, Federal Holidays included.
8. CONTRACT TYPE:
This is a firm fixed price contract
9. TRAVEL:
The Department of Veterans Affairs Medical Centers (VAMCs) is NOT responsible for any travel expenses associated with this requirement.
10. AUTHORIZED SERVICES:
The only services authorized under this contract are routine repairs and preventative maintenance checks and services. Routine repairs are defined as those repairs caused by normal wear and tear. Before performing any service or repair of a non-contract nature, the Contracting Officer or his/her designee must be advised of the reason for this additional work. If appropriate, the Contracting Officer may authorize the additional services or repairs under a separate purchase authorization. Contractor is cautioned that only the Contracting Officer may authorize additional services or repairs and reimbursement will not be made unless this prior authorization is obtained.
11. COR AUTHORITY:
In no event is the COR empowered to change any of the terms and conditions of the contract. All changes, to any section of this contract, shall be made only by the Contracting Officer pursuant to a properly executed modification. The types of actions within the purview of the COR’s authority are to ensure that the Contractor performs the technical requirements of the contract, and to notify the Contracting Officer of any deficiencies observed. A Letter of Designation shall be issued to the COR and a copy shall be sent to the Contractor at the time of contract kickoff meeting or post-award conference setting forth in full the responsibilities and limitations of the COR.
12. PARTS:
(a) Only new, standard parts shall be furnished by the Contractor. All parts shall be of current manufacture and have versatility with presently installed equipment.
(b) All newly installed replacement parts become the property of the Government. Replaced parts are to be disposed of legally by the Contractor after obtaining approval from the Contracting Officer’s Representative (COTR).
13. GOVERNMENT FURNISHED EQUIPMENT:
The VAMC will not furnish parts and/or test equipment for the performance of this contract. It is the responsibility of the Contractor to bring the appropriate equipment and/or supplies necessary to complete the work as required within.
14. QUALITY CONTROL:
After contract award, the Contractor shall implement and follow a Quality Control Plan or Quality Assurance and Surveillance Plan (QASP) that will be accepted by the Government. The solution-based Quality Control Plan or QASP with performance goals and acceptable quality levels is necessary to ensure quality for this project. The Contractor shall address any issues meeting established Government performance goals as needed. The Contractor will provide full access of its internal QASP for the COR to monitor performance.
A. QUALITY ASSURANCE:
As stated in the Quality Control Plan or QASP, the Government shall evaluate the Contractor's performance under this agreement. For those tasks listed in the Quality Control Plan or QASP, the COR or evaluators shall follow the methods of surveillance specified in this agreement. The Government shall record all surveillance observations. When an observation indicates defective performance, the COR shall forward the observation to the Contractor manager or alternate(s), who shall initial the observation. The initialing of the observation does not necessarily constitute concurrence with the observation, only acknowledgment that he or she has been made aware of the defective performance. Government surveillance of tasks not listed in the Quality Control Plan/QASP or by methods other than those listed in the Quality Control Plan/QASP may occur during the performance period of this agreement. Such surveillance shall be done according to standard inspection procedures or other agreement provisions. Any action taken by the contracting officer as a result of surveillance shall be in accordance with the terms of this agreement. The contractor shall submit a corrective action plan within 10 business days of failure to meet the performance standards identified in the performance requirement summary.
15. COMPLIANCE WITH APPLICABLE LAWS AND REGULATIONS:
The Contractor shall ensure that services provided to the Government under this agreement comply with all applicable laws, statutes, regulations, and guidelines that govern the operation of systems by the Government. The Contractor shall also ensure that all services provided to the Government under this agreement comply with all Government mandated procedures, standards, and requirements.
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT 2018)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments
(9) The specification.
(t) [Reserved]
(u) Unauthorized Obligations.
(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.
(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
(End of Clause) C.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (MAY 2019)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204–23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115–91).
(3) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(4) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(5) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[X] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
[] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (OCT 2015) (41 U.S.C. 3509).
[] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
[X] (4) 52.204–10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109–282) (31 U.S.C. 6101 note).
[] (5) [Reserved] [X] (6) 52.204–14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).
[] (7) 52.204–15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).
[X] (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015) (31 U.S.C. 6101 note).
[X] (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
[] (10) [Reserved] [] (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
[] (ii) Alternate I (NOV 2011) of 52.219-3.
[] (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
[] (ii) Alternate I (JAN 2011) of 52.219-4.
[] (13) [Reserved] [] (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
[] (ii) Alternate I (NOV 2011).
[] (iii) Alternate II (NOV 2011).
[] (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
[] (ii) Alternate I (Oct 1995) of 52.219-7.
[] (iii) Alternate II (Mar 2004) of 52.219-7.
[X] (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).
[] (17)(i) 52.219-9, Small Business Subcontracting Plan (AUG 2018) (15 U.S.C. 637(d)(4)).
[] (ii) Alternate I (NOV 2016) of 52.219-9.
[] (iii) Alternate II (NOV 2016) of 52.219-9.
[] (iv) Alternate III (JAN 2017) of 52.219-9.
[] (v) Alternate IV (AUG 2018) of 52.219-9.
[] (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).
[] (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).
[] (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
[X] (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657f).
[X] (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C 632(a)(2)).
[] (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (DEC 2015) (15 U.S.C. 637(m)).
[] (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (DEC 2015) (15 U.S.C. 637(m)).
[X] (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
[] (26) 52.222–19, Child Labor—Cooperation with Authorities and Remedies (JAN 2018) (E.O. 13126).
[X] (27) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
[X] (28)(i) 52.222–26, Equal Opportunity (SEP 2016) (E.O. 11246).
[] (ii) Alternate I (FEB 1999) of 52.222-26.
[X] (29)(i) 52.222-35, Equal Opportunity for Veterans (OCT 2015) (38 U.S.C. 4212).
[] (ii) Alternate I (JULY 2014) of 52.222-35.
[X] (30)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).
[] (ii) Alternate I (JULY 2014) of 52.222-36.
[X] (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
[X] (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).
[X] (33)(i) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).
[] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
[X] (34) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
[] (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C.6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[] (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).
[] (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).
[] (38)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
[] (ii) Alternate I (OCT 2015) of 52.223-13.
[] (39)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
[] (ii) Alternate I (JUN 2014) of 52.223-14.
[X] (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007)(42 U.S.C. 8259b).
[] (41)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
[] (ii) Alternate I (JUN 2014) of 52.223-16.
[X] (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) [] (43) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
[] (44) 52.223-21, Foams (JUN 2016) (E.O. 13693).
[] (45) (i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
[] (ii) Alternate I (JAN 2017) of 52.224-3.
[] (46) 52.225-1, Buy American—Supplies (MAY 2014) (41 U.S.C. chapter 83).
[] (47)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (MAY 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
[] (ii) Alternate I (MAY 2014) of 52.225-3.
[] (iii) Alternate II (MAY 2014) of 52.225-3.
[] (iv) Alternate III (MAY 2014) of 52.225-3.
[] (48) 52.225–5, Trade Agreements (AUG 2018) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
[X] (49) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
[] (50) 52.225–26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
[] (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
[] (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
[] (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
[] (54) 52.232-30, Installment Payments for Commercial Items (JAN 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
[X] (55) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Oct 2018) (31 U.S.C. 3332).
[] (56) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (Jul 2013) (31 U.S.C. 3332).
[] (57) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
[] (58) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
[] (59) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).
[] (60)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
[] (ii) Alternate I (Apr 2003) of 52.247-64.
[] (iii) Alternate II (FEB 2006) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[] (1) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495).
[] (2) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).
[] (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
[] (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
[] (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
[X] (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (MAY 2014) (41 U.S.C. chapter 67).
[] (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements (MAY 2014) (41 U.S.C. chapter 67).
[X] (8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015).
[X] (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
[] (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records—Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .