36C24718R0309-00003001.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- UPGRADE ELEVATORS, BUILDING A, B, C, AND D
- Solicitation number
- 36C24718R0309
About this file
36C24718R0309 00003 RFI Log A00003 - 36C24718R0309 - PROJ 508-14-123 - Elevator Upgrade.xlsx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24718C0160-001.docx | DOCX document | |
| 36C24718R0309-00005000.docx | DOCX document | |
| 36C24718R0309-00005001.pdf | ||
| 36C24718R0309-0004001.docx | DOCX document | |
| 36C24718R0309-00003000.docx | DOCX document | |
| 36C24718R0309-00002005.pdf | ||
| 36C24718R0309-00002004.docx | DOCX document | |
| 36C24718R0309-00001000.docx | DOCX document | |
| 36C24718R0309-00001001.zip | ZIP file | |
| 36C24718R0309-007.docx | DOCX document | |
| 36C24718R0309-008.pdf | ||
| 36C24718R0309-009.pdf | ||
| 36C24718R0309-000.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question # | Question Date | Question | Government Response |
| 1 | 14-May-2018 | In reference to section 14 21 00 - 1.14: Is the emergency power system already installed and functioning? Is the intention of this line item to make the renovated elevators work with the emergency power system already in place? | Will be answered in the next amendment. |
| 2 | 14-May-2018 | In reference to section 14 21 00 - 1.15: Is any work expected to be done in the machine rooms to bring the spaces into compliance? Are the rooms in compliance now? One contractor’s bid may include perceived needs, while another contractor may believe machine upgrades are unnecessary. Unless specific improvements are included in the scope of work, it is difficult to estimate the cost of such work. | Will be answered in the next amendment. |
| 3 | 14-May-2018 | In reference to section 14 21 00 - 2.8: How many elevators can operate at the same time on the emergency generator? Has a power study been made to determine the total draw on the current emergency power generator? The new AC system may reduce the generator load, and thus, allow more elevators to operate concurrently. | Will be answered in the next amendment. |
| 4 | 14-May-2018 | In reference to section 14 21 00 - 2.15: In what seismic zone is this building located? Do you anticipate structural seismic alterations or additions? | Will be answered in the next amendment. |
| 5 | 14-May-2018 | In reference to section 14 21 00 - 2.40: Surface mounted hall fixtures will greatly improve housekeeping in each elevator lobby by practically eliminating dust. Are surface mounted fixtures allowed? | Will be answered in the next amendment. |
| 6 | 14-May-2018 | Could you please confirm with us if SPD is needed or if you are interested in adding SPD? | This does not apply to this project. |
| 7 | 15-May-2018 | Is this project sales tax exempt? If the project is sales tax exempt can the government provide a sales tax exemption certificate? | No, this project is not sales tax exempt. |
| 8 | 15-May-2018 | Will the Government provide comprehensive written badging requirements for the project if badging is required? | Yes, badging is required. Further details may be provided in the next amendment. |
| 9 | 15-May-2018 | Where will the designated parking area be for workers accessing the construction site? | No, there will be no designated parking for this project. |
| 10 | 15-May-2018 | Will the government accept the use of the industry leading Procore Project Management software as the primary submittal and data tracking tool for this project? The software is compatible with the VA’s networks and is currently in use at many VA locations. | The government will accept the use of Procore Project Management Software. |
| 11 | 15-May-2018 | Will the fire sprinkler system and/or the fire alarm system need to be disrupted during construction? If yes, what if any additional security measures will the government require e.g. fire watch, temporary fire alarms, adjustments to sprinkler heads, etc. | Will be answered in the next amendment. |
| 12 | 15-May-2018 | Does the Government have a fire alarm servicer that they currently work with for alarms and surveillance cameras? What is the company name and contact information of the person that will need to be coordinated with for those scopes? | Will be answered in the next amendment. |
| 13 | 15-May-2018 | Will the existing fire alarm system be replaced or just upgrade to connect to the new elevator equipment? | Will be answered in the next amendment. |
| 14 | 15-May-2018 | Has the work area been checked for asbestos and or lead paint? | Assessments for both asbestos containing material and lead-based paint have been conducted by the Atlanta VA Medical Center in the past, but both of these assessments were non-destructive assessments and did not include the elevator shafts. After further discussion, the VA determined based on the scope of this project that no potential asbestos containing material or lead-based paint would be disturbed during this project. BES Design/Build was informed that there was no need for any design work concerning hazardous materials and to proceed forward with the work. |
| 15 | 15-May-2018 | In reference to section 14 21 00 - 2.46: Cab interior specs are in conflict with the drawings. Please advise | Will be answered in the next amendment. |
| 16 | 22-May-2018 | Could you please provide the clear opening dimensions of the elevator doors as well as the opening type (one/two speed, bi-parting, etc.)? | Will be answered in the next amendment. |
Solicitation # 36C24718R0309 Amendment # 00004 Project # 508-14-123 - Upgrade Elevators Bldgs A, B, C, D Request For Information (RFI) Log