This is a Solicitation for pest, insect, and rodent control services at the Salem, Virginia Veterans Affairs Medical Center (VAMC). The solicitation number is 36C24627Q0121, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. This contract opportunity is set aside exclusively for Service Disabled Veteran Owned Small Businesses (SDVOSB), restricting competition to qualified veteran-owned firms meeting the applicable size standards and service-disabled veteran ownership requirements.
The solicitation seeks comprehensive pest management services to maintain a pest-free environment at the Salem VAMC facility. While specific performance metrics, pricing terms, and response deadlines are not detailed in the provided document summary, interested SDVOSB contractors should consult the complete solicitation documents for detailed service requirements, statement of work specifications, evaluation criteria, proposal submission instructions, and all applicable deadlines for bid submission and award notification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Determination for Contract - Salem 8-22-2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24627Q0121
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
36C24627Q0121 Dave Hoover None -2026
2:00PM
EST
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 X X 561710 $17.5 Million N/A X Department of Veterans Affairs Network Contracting Office 6 1970 Roanoke Blvd Salem VA 24153 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
Department of Veterans Affairs Financial Services Center
PO BOX 149971
Austin TX 78714-9971 512-460-5049 512-460-5221 X See CONTINUATION Page This is a firm fixed price contract for Insect, Pest and Rodent Control at the Salem, VA, VAMC.
See CONTINUATION Page X X Natasha Leahy Contracting Officer Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 PRICE/COST SCHEDULE | 4 |
| ITEM INFORMATION | 4 |
| B.3 PERFORMANCE WORK STATEMENT | 11 |
| B.4 SPECIAL CONTRACT REQUIREMENTS | 22 |
| SECTION C - CONTRACT CLAUSES | 25 |
| C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 25 |
| C.2 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 26 |
| C.3 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APR 2026) | 26 |
| C.4 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION) | 27 |
| C.5 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 33 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 35 |
| D.1 Quality Assurance Surveillance Plans (QASP) | 35 |
| SECTION E - SOLICITATION PROVISIONS | 41 |
| E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION) | 41 |
| E.1 INSTRUCTIONS TO QUOTERS | 42 |
| E.2 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 44 |
| E.3 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION) | 45 |
| E.4 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION) | 45 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C246
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] Monthly with proper invoice submission. |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12.00 |
| MO |
| __________________ |
| __________________ |
The contractor shall furnish all labor, equipment, supplies, parts, supervision, management and transportation necessary to perform an integrated pest management program (Except for mechanical or physical structure changes).
Contract Period: Base POP Begin: 01-01-2027 POP End: 12-31-2027 PRINCIPAL NAICS CODE: 561710 - Exterminating and Pest Control Services PRODUCT/SERVICE CODE: S207 - Housekeeping - Insect/Rodent Control
| 12.00 |
| MO |
| __________________ |
| __________________ |
Private First Class Desmond T. Doss VA Clinic; 1600 Lakeside Dr, Lynchburg, VA
POP Begin: 01-01-2027 POP End: 12-31-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
Danville VA Clinic; 325 Piedmont Drive, Danville Mall, Suite 2005, Danville, VA
POP Begin: 01-01-2027 POP End: 12-31-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
Staunton VA Clinic; 102 Lacy B. King Way, Staunton, VA
POP Begin: 01-01-2027 POP End: 12-31-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
Wytheville VA Clinic; 165 Peppers Ferry Road, Wytheville, VA
POP Begin: 01-01-2027 POP End: 12-31-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
Tazewell VA Clinic; 388 Ben Bolt Avenue, Carilion Tazewell Community Hospital Tazewell, VA
POP Begin: 01-01-2027 POP End: 12-31-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
The contractor shall furnish all labor, equipment, supplies, parts, supervision, management and transportation necessary to perform an integrated pest management program (Except for mechanical or physical structure changes).
Contract Period: Option 1 POP Begin: 01-01-2028 POP End: 12-31-2028
| 12.00 |
| MO |
| __________________ |
| __________________ |
Private First Class Desmond T. Doss VA Clinic; 1600 Lakeside Dr, Lynchburg, VA
POP Begin: 01-01-2028 POP End: 12-31-2028
| 12.00 |
| MO |
| __________________ |
| __________________ |
Danville VA Clinic; 325 Piedmont Drive, Danville Mall, Suite 2005, Danville, VA
POP Begin: 01-01-2028 POP End: 12-31-2028
| 12.00 |
| MO |
| __________________ |
| __________________ |
Staunton VA Clinic; 102 Lacy B. King Way, Staunton, VA
POP Begin: 01-01-2028 POP End: 12-31-2028
| 12.00 |
| MO |
| __________________ |
| __________________ |
Wytheville VA Clinic; 165 Peppers Ferry Road, Wytheville, VA
POP Begin: 01-01-2028 POP End: 12-31-2028
| 12.00 |
| MO |
| __________________ |
| __________________ |
Tazewell VA Clinic; 388 Ben Bolt Avenue, Carilion Tazewell Community Hospital Tazewell, VA
POP Begin: 01-01-2028 POP End: 12-31-2028
| 12.00 |
| MO |
| __________________ |
| __________________ |
The contractor shall furnish all labor, equipment, supplies, parts, supervision, management and transportation necessary to perform an integrated pest management program (Except for mechanical or physical structure changes).
Contract Period: Option 2 POP Begin: 01-01-2029 POP End: 12-31-2029
| 12.00 |
| MO |
| __________________ |
| __________________ |
Private First Class Desmond T. Doss VA Clinic; 1600 Lakeside Dr, Lynchburg, VA
POP Begin: 01-01-2029 POP End: 12-31-2029
| 12.00 |
| MO |
| __________________ |
| __________________ |
Danville VA Clinic; 325 Piedmont Drive, Danville Mall, Suite 2005, Danville, VA
POP Begin: 01-01-2029 POP End: 12-31-2029
| 12.00 |
| MO |
| __________________ |
| __________________ |
Staunton VA Clinic; 102 Lacy B. King Way, Staunton, VA
POP Begin: 01-01-2029 POP End: 12-31-2029
| 12.00 |
| MO |
| __________________ |
| __________________ |
Wytheville VA Clinic; 165 Peppers Ferry Road, Wytheville, VA
POP Begin: 01-01-2029 POP End: 12-31-2029
| 12.00 |
| MO |
| __________________ |
| __________________ |
Tazewell VA Clinic; 388 Ben Bolt Avenue, Carilion Tazewell Community Hospital Tazewell, VA
POP Begin: 01-01-2029 POP End: 12-31-2029
| 12.00 |
| MO |
| __________________ |
| __________________ |
The contractor shall furnish all labor, equipment, supplies, parts, supervision, management and transportation necessary to perform an integrated pest management program (Except for mechanical or physical structure changes)..
Contract Period: Option 3 POP Begin: 01-01-2030 POP End: 12-31-2030
| 12.00 |
| MO |
| __________________ |
| __________________ |
Private First Class Desmond T. Doss VA Clinic; 1600 Lakeside Dr, Lynchburg, VA
POP Begin: 01-01-2030 POP End: 12-31-2030
| 12.00 |
| MO |
| __________________ |
| __________________ |
Danville VA Clinic; 325 Piedmont Drive, Danville Mall, Suite 2005, Danville, VA
POP Begin: 01-01-2030 POP End: 12-31-2030
| 12.00 |
| MO |
| __________________ |
| __________________ |
Staunton VA Clinic; 102 Lacy B. King Way, Staunton, VA
POP Begin: 01-01-2030 POP End: 12-31-2030
| 12.00 |
| MO |
| __________________ |
| __________________ |
Wytheville VA Clinic; 165 Peppers Ferry Road, Wytheville, VA
POP Begin: 01-01-2030 POP End: 12-31-2030
| 12.00 |
| MO |
| __________________ |
| __________________ |
Tazewell VA Clinic; 388 Ben Bolt Avenue, Carilion Tazewell Community Hospital Tazewell, VA
POP Begin: 01-01-2030 POP End: 12-31-2030
| 12.00 |
| MO |
| __________________ |
| __________________ |
The contractor shall furnish all labor, equipment, supplies, parts, supervision, management and transportation necessary to perform an integrated pest management program (Except for mechanical or physical structure changes).
Contract Period: Option 4 POP Begin: 01-01-2031 POP End: 12-31-2031
| 12.00 |
| MO |
| __________________ |
| __________________ |
Private First Class Desmond T. Doss VA Clinic; 1600 Lakeside Dr, Lynchburg, VA
POP Begin: 01-01-2031 POP End: 12-31-2031
| 12.00 |
| MO |
| __________________ |
| __________________ |
Danville VA Clinic; 325 Piedmont Drive, Danville Mall, Suite 2005, Danville, VA
POP Begin: 01-01-2031 POP End: 12-31-2031
| 12.00 |
| MO |
| __________________ |
| __________________ |
Staunton VA Clinic; 102 Lacy B. King Way, Staunton, VA
POP Begin: 01-01-2031 POP End: 12-31-2031
| 12.00 |
| MO |
| __________________ |
| __________________ |
Wytheville VA Clinic; 165 Peppers Ferry Road, Wytheville, VA
POP Begin: 01-01-2031 POP End: 12-31-2031
| 12.00 |
| MO |
| __________________ |
| __________________ |
Tazewell VA Clinic; 388 Ben Bolt Avenue, Carilion Tazewell Community Hospital Tazewell, VA
POP Begin: 01-01-2031 POP End: 12-31-2031
| GRAND TOTAL |
| __________________ |
Page 1 of
B.3 PERFORMANCE WORK STATEMENT
Integrated Pest Management Salem Veterans Affair Medical Center
Background: The Salem Veterans Affair Medical Center Integrated Pest Management (IPM) services for all Main Campus Buildings.
General: The contractor shall furnish all labor, equipment, supplies, parts, supervision, management and transportation necessary to perform an Integrated Pest Management Program (except for mechanical or physical structure changes) that will meet the following objectives:
1. Maintain and promote safe, efficient and environmentally sound strategies, preventing or controlling disease vectors and other pests that may adversely affect health, impede operations or damage property.
2. Fully comply with all appropriate laws and regulations i.e. OSHA, Title 29 code of Federal regulations (CFR) 1910.20, Access to employee exposure and medical records; 29 CFR 1910.132, Personal Protective Equipment; 29 CFR 1910.134, Respiratory Protection; 29CFR 1910.1200, Hazard Communication and Environmental Protection Agency (EPA), Federal Insecticide, Fungicide and Rodenticide Act (FIFRA), involving pesticide use and other pest control procedures.
3. Incorporate IPM philosophy and strategies into all relevant aspects of medical center pest management planning, training and operations in accordance with specifications, terms and conditions of this contract for the Department of Veterans Affairs Medical center located in Salem Virginia.
4. The contractor shall follow the Six Steps of the IPM Process:
a) Understanding and educating the Client.
b) Analyzing the Pest Problem.
c) Taking Short-term Corrective action.
d) Implementing Long Term Preventive Action.
e) Inspecting, Documenting and Evaluating Results and reporting back to the Client.
5. The contractor shall furnish with the COR all licenses, certifications from the state and/or local government entities proving the company is able to provide pest services within the state of Virginia. The Contractor shall provide training records for each service technician assigned to perform under this contract.
1.1 CONTRACTOR REQUIREMENTS: Contractor shall provide thorough Inspections of all buildings of the campus daily, to provide effective and appropriate pest management treatments, and to ensure measures are in place to meet the requirements for healthcare integrated pest management mitigation, as outlined in the Joint Commission Standards and Department of Veterans Affairs IPM standards.
1.1(a) Contractor shall provide a written sanitation report, following each inspection; outlining recommendations for addressing conditions that may be present. These recommendations should be corrected and/or mitigating measures implemented within 48hrs of discovery.
1.2 Regular maintenance of pest control mitigation measures established in the period of performance, shall be provided IAW the requirements of this PWS.
1.3 Contractor shall provide daily a minimum of (1) dedicated employee to accomplish tasks associated with this PWS.
2. Areas of Coverage and Scheduling of Services:
2.1 The treatment schedule for Pest Management processes is indicated below, and the time frames will be the minimum basis for providing pest control services. The Contractor will provide a work schedule as to when services will be performed and submit to the Contracting Officer’s Representative (COR) or his designee within fifteen (15) days after contract award for approval. The Government reserves the right to add and delete buildings if the Salem Veterans Affair Medical Center expands geographically.
2.2 Pest management tasks will be regularly provided, and any deviation or changes will require prior approval from the COR or designee. In the event of inclement weather, work will be re-scheduled to a date and time approved by the COR. Any re-scheduling/postponements will be at no cost to the Government:
a) Salem Veterans Affair Medical Center:
1970 Roanoke Blvd, Salem VA, 24153
b) Minimum Staffing model: Onsite coverage (2) duty hours per day, (3) days per week
c) See section 5.3 regarding service call requirements.
3. Required Contractor Reporting:
4.1 Contractor will sign in and out with the facility EMS office when performing all treatment services. The COR will provide instructions to the POCs and locations of sign-in/out.
4.1(a) Contractor shall provide and maintain a service call log for all locations treated. Service Call log shall be provided to the COR annually or as requested.
4.1(b) Service call log shall include chemicals used, type of treatment provided, site treated, time of completion and date of completed work.
4.2 All Integrated Pest Management (IPM) services performed during the work shift will be documented. The COR will brief the Contractor on the preparation of this report.
4.3 The Contractor is responsible for supplying, completing and submitting reports annually as required and requested by Federal, State or local ordinances which pertain to any duties contained in the contract.
4.4. The Contractor shall be required to furnish to the COR the Safety Data Sheets (SDS) and the trade names (if any) and names of chemicals to be used in the performance of this contract prior to initial application.
4.5. Contractor shall provide a written sanitation and activity report, on a monthly basis, outlining recommendations for addressing major conditions that may be present.
4.6 To reduce the need for pesticide use, contractors may be asked to provide alternative recommendations for treatment as needed. These recommendations should be corrected within a reasonable time frame.
4.7 CONTRACTOR EXPERIENCE REQUIREMENTS:
a) Certified Entomologist on staff.
b) Qualifications of Key Personnel- Virginia Certified Pest Controller
c) Membership of the Virginia Pest Management Association
4.8 Contractor shall furnish a copy of the Insurance Certificate upon receiving contract to the CO and COR.
5. Scope of Work:
5.1 Contractors shall perform inspections and mitigation measures required at all campus buildings daily, to determine which pest management measures are appropriate, effective and required, both internally and externally; Plan all work required, reviews and acts upon complaints received; documents and treatment provided while identifying developing pest trends.
5.2 Contractor shall be responsible for daily interior, structural and exterior pest control services, including rodent control around the perimeter of the hospital grounds.
5.3 Contractor shall be provided access to building plans and blueprints to locate and avoid building structural supports, electrical wiring, ventilation, plumbing, ducts, etc., when planning applications within the walls, ceilings, or floors of buildings, and are skilled in using masonry boring equipment and structural injectors to gain access to internal or subterranean spaces for such application as termite control.
5.4 Contractors shall coordinate, schedule, and assign sections of the Medical Center buildings and grounds, for treatment and terminal cleaning by Environmental Management Service (EMS) staff; provide general cleaning of dead pests and dead rodent removal.
5.5 Contractors must select control methods suitable for the hospital environment, being careful not to expose patients, visitors, or staff to toxic chemicals; materials used in pest control service shall comply with federal, state, and local laws, and shall be acceptable to customer.
5.6 Contractor communicates regularly with EMS staff and advises hospital staff on daily preventive measures, such as removal of pest hiding areas and food and water sources in their work areas; plans and accomplishes the total pest control efforts of the Medical Center through coordinating work with members of other departments within the Medical Center.
5.7 Contractor shall be responsible for managing the internal and exterior pest control on the Medical Center grounds and coordinating with Engineering Service for assistance from the grounds department and wildlife service’s when necessary.
5.8 Contractors shall assist EMS leadership in conducting training classes for various Medical Center Services, which includes such topics as pesticide safety, hazards of and precautions to be followed related to specific pesticides, current state and federal laws and regulations governing the use of pesticides.
5.9 Contractor provides and receives technical advice and guidance when appropriate while building rapport and maintaining a professional relationship with Pest Management officials from Federal, State, Local agencies, and consulting entomologists in areas of program development or special program needs.
5.10 Contractor shall respond to after duty hours emergency calls within:
· Four (4) hours from the initial notification,
· Seven (7) days a week,
· Twenty-four (24) hours a day.
5.10(a) The Contractor shall furnish emergency contact number(s) to the VA Medical Center. Contractor POC needs to be available for all emergency calls-(see section 5.3). A cascade list of Contract POCs shall be provided.
5.10(b) Should the COR determine that an emergent service call has grossly exceeded the response time in section 5.3; the COR may notify the Contractor for immediate response.
5.10(c) For scheduled or emergency service calls that grossly exceed response time, the VA shall be entitled to receive a 15% credit for the base rate of the service, as provided in Schedule of Supplies or Services and Prices/Costs.
5.11 Contractor shall perform pest control services in accordance with the most effective scientific pest control procedures under the guidance of a certified entomologist.
5.12 Contractor shall provide pest control services for all buildings, floors, rooms, at the VA campus as noted above in 2.2. Exterior grounds/landscape within twenty-five (25) feet of building shall be treated monthly for pests. The normal treatment for all buildings shall be daily unless otherwise noted within the body of this SOW.
| 5.12(a)The Contractor shall develop a comprehensive plan detailing and/or defining the |
| contributing conditions for pest control. |
5.13 Contractor shall eliminate/treat for the following pests that include: Rats/mice, cockroaches, ants, fruit flies, spiders, bed bugs, wasps, bees (includes all other stinging and biting pests), crickets, earwigs, centipedes, beetles and pill bugs.
5.13(a) Bed Bugs – The Contractor shall employ the latest technology to eradicate bed bug infestation applicable to medical care facilities. Treatment will occur on a needed basis. (See section 5.10 for emergent response)
5.13(b) Upon notice of an emergent request, Contractor shall be able to provide treatment within four (4) hours of notification. Reasonable exceptions will be made for cases such as adverse weather or restriction of access by the Medical Center that are beyond a Contractor’s direct control. (See section 5.10 for emergent response)
5.14 The contractor shall provide removal services for dead and decaying insects, rodents, or other mammals and detailed reporting of action in accordance with IPM program requirements-(see section 5.15 for IPM requirements) for treating the following pests on a routine basis or whenever these pests are at their most active stage:
· Termites, wood boring insects such as carpenter ants and powder post beetles. Wood destroying organisms (i.e. Winged termite warmers, subterranean termites, dry wood termites, fungi, wood boring beetles, etc.)
· General structural arthropod pests (i.e., cockroaches, ants, carpet beetles, spiders, carpenter ants, carpenter bees, and any other arthropod pests not specifically excluded from this contract).
· Flying insect pests (i.e., housefly, stable fly, blow flies, etc.).
· Predatory pests (i.e., lice, bedbugs, fleas, mites, ticks, bees, wasps, mosquitoes, scorpions, etc. See section 5.13 regarding bedbugs).
· Stored product pests (i.e., saw tooth grain beetles, red confused flour beetle, Trogoderma beetles, grain moths etc.)
· Mice and Rats (i.e., house mouse, field mouse, roof rat, Norway rats, etc.)
· Pest birds (i.e., pigeons, sparrows, blackbirds, etc.)
· Other vertebrate pests (i.e., dogs, cats, bats, squirrels, gophers, moles, skunks, snakes, rabbits, raccoons, etc.).
· Aquatic pests (i.e., mosquito larva/pupae, algae etc.)
5.14(a) Termite treatment services may be performed by the Contractor and/or the Contractor’s sub-contractor as required and approved by the COR.
5.15 Components of the IPM program include:
a) Inspection of the facility and its exterior surroundings.
b) Identification of the present types of pests.
c) Identification and investigation of conditions that contribute to infestations.
d) Analysis of current pest activity.
e) Recommendations for limiting and preventing future infestations.
f) Implementation of mechanical methods for controlling pests.
g) Application of highly targeted treatments.
h) Continuous evaluation and fine-tuning of service to meet future needs.
i) Contractor shall notify the COR in writing within five (5) working days any contributing condition that may help support pest’s infestation.
j) The Contractor shall check for Non-chemical Pest Control Methods and report to COR findings that will help to eliminate pest problems.
5.16 Documented reported findings shall include but are not inclusive to:
(1) Sanitation: Sanitation involves cleaning up and/or removing potential food and water sources for pests. A regular schedule of cleaning floors, equipment, floor drains, trash receptacles and dumpsters to provide the best approach for minimizing food sources for pests. Documented water leaks should be repaired promptly, and wet mops should be hung up to dry properly.
(2) Exclusion: Sealing up cracks and holes where pests can enter is the most effective non-chemical method to prevent pests from invading a building. It is impossible, for example, to keep a building free of mouse activity if the doors do not have proper weather strips. It is important to keep outer doors closed or install tight-fitting screens or storm doors.
(3) Harborage Removal: The less shelter that is available, the fewer number of pests that will be able to survive. Removing piles of debris, cutting tall weeds and eliminating cardboard boxes in storage rooms are examples of harborage removal.
(4) Harborage Denial: If a harborage cannot be removed, i.e., boxes, trees leaning against the building, equipment/supplies stored outside/inside or leaning against a building which may attract both insects and rodents and prevent adequate treatment due to poor accessibility the contractor shall submit a report of his findings and recommendations for correction to the COR. Should the recommendations not be followed and/or the harborage is not corrected, the contractor shall not be liable for any infestation that results from failure upon the VA to correct. Should more frequent services be performed and additional pesticides be used, the contractor shall bill the VA for cost incurred to keep the problem to a minimum.
(5) Environmental Alteration: Changing the environmental conditions of a room or area so that pests cannot survive there can be an effective long-term strategy. For example, a wet crawlspace under a building can serve as a source of infestation for diverse types of pests. Installing ventilators and vapor barriers to dry out the crawlspace prevents most pests from living under the building.
(6) Interception: When building occupants or workers examine goods and items for pests as they are brought into the building, they often can prevent numerous introductions of pests, especially German cockroaches. This is especially important for food items, bagged or boxed produce.
(7) Trapping Monitoring: Rodents can be effectively controlled in many situations using traps alone. Flying insects can be controlled with properly placed insect light traps in conjunction with good sanitation and exclusion practices. For insect control, traps work best for monitoring activity of insects and other arthropod pests.
(8) Vacuuming: Physical removal of pests by vacuuming is rapidly gaining wide acceptance. This technique is especially effective for cockroach and spider control.
(9) Heat Freezing: Heat is effectively used in Florida and California to control termites and wood-boring beetles in structures in a process called Clean Heat. Heat is also used in some situations to "flush" cockroaches out of their harborage. By combining vacuuming with flushing insects with warm air, pest control can effectively be accomplished in some situations without occupants having to vacate the area. Items (e.g., food) that are thought to be infested may be frozen at zero degrees Fahrenheit for at least 6 days - if the items can safely be frozen.
(10) Lighting: Exterior lights often attract large numbers of nighttime flying insects to buildings where they can enter the building. These insects also serve as food for spiders, which promotes spider infestations. Exterior lighting shall be changed to sodium vapor lamps where it is feasible to attract as few insects as possible to a building.
6. Special Provisions
The following provisions shall be adhered to by the Contractor in performing pesticide applications of the areas specified below:
6.1 Patient Occupied Areas: Contractor shall use pesticides with as low a volatility and as odor-free as possible to keep odor levels from affecting patients.
6.2 Critical Areas: The Contractor shall submit a list of pesticides for intended use in areas listed below to the Chief, Environmental Management Service (EMS) prior to any application. The planned use of pesticides in these areas requires recognition of the attendant hazards to occupants’ supplies, equipment and surfaces. No substitution can be made at any time without the approval from the COR/Chief of EMS or designee.
| Critical Areas: |
| Operating Rooms |
| SPD (Sterile Processing Department) |
| Pharmacy |
| Research areas |
| Intensive Care Units |
| Respiratory Care Areas |
| Laboratories |
6.3 Additional Services Community Based Outpatient Clinics (CBOCs), - “Additional services” are services that the Contractor will provide at an additional cost to the Government, to include all labor, supervision, supplies and materials specifically identified as being outside the provisions of the basic routine service obligations and included in the offeror’s overall pricing. These services may be provided on an emergent basis, during or after normal working hours at the Salem VA Healthcare System, Community Based Outpatient Clinics (CBOCs). The Contracting Officer (CO) may issue a separate task order before work may proceed, depending upon size and scope of services.
6.3(a): Location of Community Based Outpatient Clinics (CBOCs):
· Private First-Class Desmond T. Doss VA Clinic; 1600 Lakeside Dr, Lynchburg, VA 24501-3116
· Danville VA Clinic; 325 Piedmont Drive, Danville Mall, Suite 2005, Danville, VA 24540-2860
· Staunton VA Clinic; 102 Lacy B. King Way, Staunton, VA 24401-4594
· Tazewell VA Clinic; 388 Ben Bolt Avenue, Carilion Tazewell Community Hospital Tazewell, VA 24651-9700
· Wytheville VA Clinic; 165 Peppers Ferry Road, Wytheville, VA 24382-2070
7. Residual Treatment: During regular scheduled visits, the Contractor shall apply residual insecticides by the crack and crevices method only, for control of roaches, at least once every week when roaches are present. Pesticides must be approved and registered by the EPA and must be used with IAW instructions on the label. When necessary, the Contractor shall be accompanied by the COR/or designated Government employee who will indicate specific areas to be serviced and cover machines and equipment as needed.
8. Restrictions on Pest Control Materials: All rodenticides, traps or bird repellents will be placed only at times and in areas approved by the COR/POC and unused portions shall be recovered at the latest by a time limit set by the COR/POC designee. The use of rodenticides other than EPA Healthcare Environment approves treatments, such as Red Squill, Warfarin and Pival, will be restricted to locations specifically provided for by the COR/Chief EMS.
8.1 The Contractor shall furnish to the COR/POC initial application of pesticides and rodent control chemicals, sample labels, names of chemicals to be used in the performance of this contract. This information is required by the Medical Service for emergency treatment in the event of ingestion of and/or contact with the material by humans. A list of products and antidotes, Safety Data Sheets (SDS) supplied/required by the Contractor and as required by this paragraph, should be maintained in the Pharmacy and in the Evaluation and Admissions Unit, where an antidote, if required, can be made readily available.
9. Removal of Dead Rodents: The Contractor shall dispose of all trapped rodents within a reasonable time frame as established by the Chief of Facilities Management or his/her designee.
10. Disposal of Hazardous Waste: The Contractor shall not dispose of any excess pesticides, pesticide containers or any material contaminated by pesticides at any location on the Medical Center premises except as specified by the COR/POC.
11. Authority of Applicator(s): Certified applicants are required in the performance of the work under the contract. Each applicant designated by the Contractor shall furnish a copy of his/her State certification (showing categories) to the COR prior to reporting for work. All Applicators must have visible on their uniform, their name and company’s logo. When there is more than one Contractor reporting, one shall be designated as a “supervisor” and be fully certified in Pest Management categories. Non-certified employees may assist the supervisor in the performance of the treatment if the non-certified employee is with and visible to the supervisor. The supervisor shall assume all responsibility for the non-certified contractor.
NOTE: State Certification is required in the performance of Pest Management and Control Services.
12. Conformity to Regulations: The Contractor shall conform to Federal, State and local regulations governing, examining and licensing of pest control operators, in the use of pest control chemicals and equipment.
13. Safety Requirements
13.1 The Contractor and sub-contractors shall take precautions as the COR/POC may determine to be reasonably necessary to protect the lives and health of occupants at this Medical Center. The COR/POC shall notify the CO of any non-compliance with the terms of the contract. Upon receipt of a Letter of Concern, the Contractor shall correct deficiencies and provide a corrective action letter to the CO.
13.2 The Contractor shall be responsible to ensure that employees and sub-contractors take all necessary safety precautions appropriately in the performance of services i.e. wearing proper face mask, breathing apparatus, clothing, etc. The Contractor shall be responsible to insure employees receive up-to-date training concerning the latest EPA, Federal, State and local regulations.
13.3 The Contractor shall be responsible to ensure that employees and sub-contractors who are expected to perform any or all their work at the facilities listed in the contract; are vaccinated annually against influenza.
13.4 The Contractor shall be responsible to ensure that employees and sub-contractors who are expected to perform any or all their work at the facilities listed in the contract; follow all Centers for Disease Control and Prevention (CDC) requirements for epidemic and/or pandemic outbreaks such as COVID-19.
14. Interference to Normal Functions: The Contractor shall be required to interrupt their work at any time so as not to interfere with or expose individuals to pesticides with the normal functioning of the facilities, fire protection systems and when passing facility patients, personnel, equipment and carts.
15. Storage of Pest Control Materials: The Contractor shall not store pest control materials or equipment at any VA installation when the operator is not working.
16. Hours of Operation: The normal hours of operation for all facilities are 7:00 am to 5:30 pm, Monday through Friday.
17. Comprehensive Plan: The Contractor shall develop a comprehensive plan on the method of survey, contributing conditions, non-chemical techniques for pest proofing and insecticide treatment for each group of pests identified in the body of this SOW within 30 working days of contract award to the COR.
18. Call Back Requirement: Should a treatment be inadequate as per specifications, the Contractor shall return within 4 hours after receiving notification by the COR to retreat the previously treated area.
19. Minor Prevention Tasks: The Contractor may be able to do some minor physical exclusion control procedures, such as sealing some cracks and holes. Extensive cleaning, plumbing repair, improving ventilation, or extensive removal of vegetation is not the responsibility of contractors.
20. Integrated Pest Management (IPM) Program - The Integrated Pest Management (IPM) services required of the Contractor are as follows:
20.1 Contractor shall perform training sessions for building maintenance personnel and workers, upon request. If desired, provide educational materials in the form of articles for in-house newsletters, notices for bulletin boards or flyers can be supplied for distribution.
20.2 The IPM Survey: Because each building and its conditions are unique, an initial IPM survey may need to be performed on the building to determine its pests control needs. The purpose of this survey is to:
| a. Identify which pests are present and where they are active, |
| b. Identify contributing conditions, |
| c. Determine which pest control strategies are needed, |
| d. Determine the high-risk areas for pest activity. |
| e. Determine where pesticide applications will be necessary. |
20.3 Inspections: The Contractor shall inspect the building exteriors at least once each month. Periodic inspections on the roofs of some flat roof buildings will be necessary, especially for some species of ant. The primary focus of interior inspections should be the high-risk areas for pest activity, such as food preparation or snack areas, restrooms, and other water sources, the perimeter building walls, and areas of previous pest activity.
20.4 Pest Sighting Log: The Contractor shall utilize the pest sighting log at each building and specialty areas such as SPD and Surgery areas which will require IMMEDIATE ATTENTION. The government may designate other areas as deemed necessary which will require logs and weekly inspections or daily inspections until the problem has been resolved. A pest sighting log will be used by VA staff to document pest sightings/activities. The contractor shall sign the log for each visit and note the problem(s) and recommendations to prevent further occurrences.
20.5 Floor Plans: Prior to the initial IPM survey, the Contractor shall request a copy of the floor plans for each building to note areas of pest activity and contributing conditions that are present. The floor plans should also be helpful in determining the elevated risk and minimal risk areas for pest activity with the facility manager and the IPM coordinator for the local contractor branch office. Locations of rodent control devices should be recorded on similar diagrams and stored in the on-site pest sighting log.
20.6 Monitoring: Un-baited "sticky" monitoring traps may be placed in key situations for pest activity to capture pests as they crawl along walls, in cabinets and similar areas. The purpose of monitoring is to determine which pests, if any, are present, to determine the extent of activity, to pinpoint where pest harborages might be located, and to determine where pests may be entering. In general, monitoring traps should be placed under sinks and in some storage areas. Other areas where monitoring traps should be placed include motor compartments of coolers and kitchen equipment and in cabinets or on shelves where items cannot be easily removed on a frequent basis. Monitoring traps may be secured to both vertical as well as horizontal surfaces.
20.7 Minimal Impact Pesticides: When a pesticide application is required, "low impact" products or non-residual pesticides with acceptable efficacy should be chosen for IPM programs. Low impact insecticides include baits, naturally occurring materials such as boric acid and silica aerogel dusts, and pyrethroids. These materials generally have very low mammalian toxicity and remain very effective at controlling insects and other arthropod pests.
20.8 Insect Light Traps. Insect light traps (ILTs) utilize ultraviolet UV light waves to attract flies and other insect situations.
21. Ongoing Service Requirements.
21.1 A certified applicator or Technician who reports to a certification applicator who remains at the contractor’s office is not allowed. Non-certified technicians may only work under the supervision of a certified applicator that is ON-SITE, during pest control servicing and personally directing all pest control activities occurring.
21.2 Contractor must advise Medical Center of any non-pest control actions that need to be taken such as sealing cracks, pickup of spilled food, etc.
21.3 The Contractor shall be responsible for disposing of all trapped rodents and all rodent carcasses off-site, in accordance with local, country, or state regulations. While on Veterans Administration (VA) premises, all contractor personnel shall comply with the rules, regulations, and procedures governing the conduct of personnel and the operation of the facility.
22. Quality Assurance Plan.
22.1 The Quality Assurance plan shall be adhered to. It is designed to aid the Government's COR or designated representative in providing effective and systematic surveillance of contract standards and acceptable quality levels of Pest Control Services.
22.2 This plan shall provide the contractor with a guideline on the performance measures that will be used in this contract.
22.3 This plan shall provide contractor’s steps for addressing customer complaints and corrective activity checklist.
22.4 The objective of this plan shall be used to evaluate how the Contractor is performing in key areas.
23. Quality Assurance Surveillance
23.1 The principal method of surveillance will be the random inspections, by the COR or designated representative, of the quantity and quality of services provided.
23.2 Each month, Contractor performance will be compared to contract standards and acceptable quality levels using the Quality Assurance Plan.
23.3 Notwithstanding the provisions of the contract covering inspection, acceptance, and deduction from payment, any services found to have been unsatisfactory performed shall be re-done at no additional cost to the Government. Such services shall be identified, for Contractor recognition, by the COR when the unsatisfactory condition is discovered, (See section 18 for call back requirements.)
24. Building Security and Keys
24.1 The Contractor shall be responsible for safeguarding all Government property provided for the Contractor's use. At the close of each work period, Government facilities, equipment and materials shall be secured.
24.2 The Government shall provide the Contractor with keys to access the required rooms. Access to restricted areas shall be provided to the Contractor by prior arrangements with the COR; with the exception that keys provided to Contractor personnel shall not be removed from the premises. Keys shall not be duplicated or issued to any other individuals. All keys not issued for the performance of work being accomplished at the present time shall be secured or returned. The COR or designated representative will perform an inventory of keys assigned to the Contractor at the end of the contract period or as needed. Any keys lost by the Contractor will be replaced by the Government, and the Contractor shall be charged the replacement value of the lost key. The Contractor shall also be responsible for any expense incurred for re-keying of the Facility caused by the lost key. The Contractor shall notify the COR of any lost or suspected lost key within 24 hours.
24.3 The Contractor shall not lend keys or open locked rooms or areas to permit entrance by persons other than the Contractor's assigned staff. The Contractor shall be responsible for securing areas upon completion of duties. There may be certain areas identified by the COR in which Contractor personnel must immediately notify the COR or Security Personnel if a door is found unlocked.
24.4 When leaving a work area, the Contractor shall turn off lights if the area is unoccupied unless otherwise directed by the COR. The Contractor shall secure and lock the window(s) before leaving the area and if there is difficulty securing the areas, the Contractor shall notify the COR or designated representative.
24.5 The Contractor shall comply with the security clearances or access controls imposed.
24.6 The Contractor shall turn in all lost articles found during the performance of duties to the COR or designated representative.
25. Damage and Equipment Loss
25.1 The Contractor shall report damages or disfigurement of Government-owned furnishings, fixtures, equipment, and architectural or building structures to the COR immediately. The Contractor shall provide a written report of any damage or disfigurement to items to the COR or designated representative within 24 hours. The Government will not be responsible for Contractor's equipment or belongings that are lost, stolen or damaged.
25.2 The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation.
25.3 The Contractor shall use reasonable care or be liable for the cost of repairs and/or replacement of damages to Government-owned equipment, fixtures, furnishings, grounds and architectural or building structures.
26. Handling of Government Furniture and Equipment
26.1 The COR or designated representative will instruct the Contractor what Government items should not to be moved or otherwise handled. Any medical apparatus in use on or by a patient will not be moved or otherwise handled by the Contractor except when prior arrangements have been made with the nurse supervisor.
26.2 In emergency situations, the Contractor's assistance may be required to help move patients out of harm's way.
27. Interference to Normal Function
27.1 The Contractor shall delay or interrupt their work at any time to avoid interference with patient care procedures and the normal function of the facility, including utility services, fire protection systems, and passage of facility patients, personnel, equipment, and carts.
28. Applicable Regulations and Manuals
28.1 Documents applicable to work described in this section are mandatory and are listed below. The Government will provide the Contractor with copies of all regulations, manuals and specifications such as those listed below. Supplements and amendments will be updated and will be fully force and effective immediately upon receipt by the Contractor. The policies and procedures of mandatory directives shall always be adhered to. The Contractor shall ensure that all mandatory publications are posted and up to date, and complete review of the following:
28.1.1 Security Clearances, Access Controls, Identification Badges
28.1.2 Facility policies concerning fire / Safety program.
28.1.3 Parking Requirements
28.1.4 Infection Control Manuals/ Environmental Service Manual
28.2 All on site employees to include contracted employees, shall complete initial compliance awareness and Health Insurance Portability and Accountability Act (HIPAA) training within thirty (30) days of commencing work.
28.3 The Contractor shall meet the annual compliance awareness and HIPAA refresher training.
B.4 SPECIAL CONTRACT REQUIREMENTS
A. WORK HOURS.
The services covered by this contract shall be furnished by the contractor as defined herein. The contractor shall not be required, except in case of emergency, to furnish such services on Federal Holidays or during off duty hours as described below.
The following terms have the following meanings:
Normal working hours: Monday through Friday, 7:30 a.m. – 4:00 p.m., excluding federal holidays. The 11 holidays observed by the Federal Government are:
New Year’s Day Martin Luther King’s Day President’s Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Christmas
Work outside these hours must be prescheduled and approved by the COR. When one of the holidays falls on Sunday, the following Monday shall be observed as a Federal Holiday. When a holiday falls on a Saturday, the preceding Friday shall be observed as a Federal Holiday.
Smoking Policy Per VHA Directive 1085 Dated 3/15/19 All VA Health Care Facilities shall be smoke free. This directive applies to all patients, visitors, contractors, volunteers, and vendors.
B. BILLING AND PAYMENT.
To allow time for review and acceptance of reports and all services, the Contractor shall invoice monthly in arears with proper invoice.
Invoices shall include at a minimum:
· Date of invoice
· Contract Number
· Purchase Order Number
· Vendor Name
· Invoice Number
· CLIN & Date of service
C. CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS).
(a) FAR 42.1502 direct all Federal agencies to collect past performance information on contracts. The Department of Veterans Affairs has implemented use of the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted to record your contract performance as required by FAR 42.15
(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
(c) Please furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm’s past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.
(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically generated email with detailed login instructions.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .