36C24627B0007.docx

DOCX document 319 KB Posted

Attached to
Z2DA--652-23-109 Renovate SPS Phase 3 Previous Notice: 36C24627R0011_1
Solicitation number
36C24627B0007
Issued by

About this file

This is a Standard Form 1442 Solicitation, Offer, and Award for construction, combined with detailed instructions to bidders and contract specifications for a renovation project. The Department of Veterans Affairs, Network Contracting Office 6 in Richmond, Virginia is soliciting sealed bids for the renovation of Phase 3 of the Sterile Processing Services (SPS) Area located in Building 500 of the Central Virginia VA Health Care System. The scope includes construction of new partitions and vestibule entry, demolition of existing finishes, installation of SPS-compliant seamless flooring and wall finishes, installation of medical equipment including washer/disinfectors, cart washers, reprocessing sinks, and sterilizer loading equipment, structural slab modifications, and all required plumbing, mechanical, and electrical modifications. The contract is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under 38 U.S.C. 8127(d), with bidders required to be registered in the SBA Veteran Small Business Certification database at both submission and award. The performance period is 365 calendar days from Notice to Proceed, with work estimated between $2,000,000 and $5,000,000 under NAICS code 236220 (Commercial and Institutional Building Construction).

Sealed bids must be submitted electronically to the Contracting Officer, Denise A. Morman, by 3:00 PM EDT on January 6, 2027, with public bid opening via Microsoft Teams on January 7, 2027 at 1:30 PM EDT. A mandatory pre-bid site visit is scheduled for December 2, 2026 at 1:30 PM EDT at the facility in Richmond, Virginia. Bidders must submit a completed SF 1442, fully executed bid bond, safety and environmental record documentation, OSHA logs and Experience Modification Rate information, and acknowledge all amendments. Award will be made to the responsible bidder with the lowest evaluated price. Bidders must have no more than two serious OSHA/EPA violations in the past five years, an EMR equal to or less than 1.0, and all employees must complete 10-hour OSHA safety training with the general contractor's competent person completing 30-hour training. The contract includes extensive security, information protection, and compliance requirements specific to Veterans Affairs operations, including restrictions on subcontracting, training certifications, and site coordination to minimize impact on patient care operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24627B0007

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 85

36C24627B0007 X

11-24-2026

TBD

652-23-109

Denise A. Morman Department of Veterans Affairs Network Contracting Office 6 1201 Broad Rock Blvd Richmond VA 23249 Denise A. Morman Department of Veterans Affairs Network Contracting Office 6 1201 Broad Rock Blvd Richmond VA 23249 Denise A. Morman 804-675-5000 x15170 Project Title: Renovate SPS Phase 3 | Project Number: 652-24-109 | Central Virginia VA HCS (CVHCS) | Richmond, VA 23249 NAICS: 236220-Commercial and Institutional Building Construction | Size Standard: $45 Million IAW VAAR 836.204, the magnitude of construction is between $2,000,000 and $5,000,000.

Project Description: The CVHCS has a requirement to renovate Phase 3 of the Sterile Processing Services (SPS) area;

located in the Main Building 500. The contractor shall furnish all labor, materials, and supervision as required by the drawings and specifications. For more details see the Statement of Work (SOW), Drawings and Specifications.

THIS IS A 100% SERVICE-DISABLED VETERAN OWNED SAMLL BUSINESS (SDVOSB) SET-ASIDE IAW 38 U.S.C. 8127 (d).

This contract will be awarded IAW RFO Part 14-SEALED BIDDING. All Bidders are required to be registered and current in System for Award Management database (SAM.gov) and registered in the SBA Veteran Small Business Certification (VetCert) at time of submission and at time of award.

Pre-Bid Site Visit: The site visit is scheduled for Wednesday, December 2, 2026, at 1:30pm EDT. All interested parties will meet on second floor catwalk in front of the Engineering Suite, 2K-137. See Instructions to Bidders and maps for further details.

Question Period: Submit all questions, via email to Denise Morman, Contracting Officer at denise.morman@va.gov. All questions must be submitted and received by Wednesday, December 9, 2026, by 3:00pm EDT. All questions and answers will be posted by amendment. Do not submit questions regarding this project to any other VA staff member. No questions by phone will be accepted.

Bids/Bid Opening: Bids mut be submitted and received by Thursday, January 6, 2027, by 3:00pm EDT. Bids must be submitted to Denise Morman at denise.morman@va.gov. The Bid Opening will be held via Microsoft Teams on Thursday, January 7, 2027 at 1:30pm EDT. BID BONDS ARE REQUIRED. For further details, please see Instructions to Bidders.

Please remember to follow all instructions to ensure your bid is compliant and deemed responsive.

3:00pm EDT

01-06-2027

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

BASE BID:

Department of Veterans Affairs Network Contracting Office 6 1201 Broad Rock Blvd Richmond VA 23249

Department of Veterans Affairs Financial Services Center P.O. Box 149971 Austin TX 78714-9971 512-460-5049 512-460-5221

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF
SUPPLIES/SERVICESQUANTITYUNITUNIT PRICE

AMOUNT

1.00 JB

BASE BID: The contractor shall provide all labor, materials, tools, equipment, and supervision to perform all operations necessary to complete the phased renovation and modification of the Sterile Processing Service (SPS) Area Located in the lower level of Building 500 Decontamination area as indicated on the drawings and specified herein. This renovation encompasses the 3rd Phase of renovations area as required by drawings. All work shall be in strict accordance with the Statement of Work (SOW) and will include final clean up and completion of any punch list items.

POP Begin:NTP
POP End:NTP + 365 days

Principal NAICS: 236220 Commercial and Institutional Building Construction Product/Service: Z2DA Repair or Alteration of Hospitals and Infirmaries

GRAND TOTAL

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
A.3 PRICE/COST SCHEDULE3
ITEM INFORMATION3
STATEMENT OF WORK, INSTRUCTIONS AND INFORMATION TO BIDDERS6
1.1 STATEMENT OF WORK6
1.2 INSTRUCTIONS AND INFORMATION TO BIDDERS18
SOLICITATION PROVISIONS22
2.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)22
2.2 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)22
2.3 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (NOV 2025) (DEVIATION)22
2.4 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION)25
2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) ALTERNATE I (MAY 2014)25
2.6 52.228-1 BID GUARANTEE (SEP 1996)26
2.7 52.233-2 SERVICE OF PROTEST (SEP 2006)27
2.8 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)27
2.9 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)32
2.10 VAAR 852.236-93 SITE VISIT (Construction) (OCT 2026) (DEVIATION)32
2.11 VAAR 852.236-94 PREPARATION OF PROPOSALS (Construction) (OCT 2026)(DEVIATION)32
REPRESENTATIONS AND CERTIFICATIONS33
3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (NOV 2025) (DEVIATION)33
3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2025) (DEVIATION)34
3.3 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND REPRESENTATION (JUN 2020)36
GENERAL CONDITIONS38
4.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)38
4.3 SUPPLEMENTAL INSURANCE REQUIREMENTS41
4.4 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2025) (DEVIATION)41
4.5 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2025) (DEVIATION)42
4.6 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2025) (DEVIATION)44
4.7 52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS—PRICE ADJUSTMENT (NONE OR SEPARATELY SPECIFIED METHOD) (AUG 2018)46
4.8 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)47
4.9 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APR 2026)47
4.10 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008)48
4.11 52.223-20 AEROSOLS (MAY 2024)48
4.12 52.223-21 FOAMS (MAY 2024)49
4.13 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (DEVIATION) (NOV 2025)50
4.14 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION)54
4.15 52.240-93 BASIC SAFEGAURDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (DEVIATION) (NOV 2025)64
4.16 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)66
4.17 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)66
4.18 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)66
4.19 VAAR 852.219-74 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED VETERAN-OWNED SMALL BUSINESSES (OCT 2026) (DEVIATION)66
4.20 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (OCT 2025) (DEVIATION)69
4.21 852.219-77 SERVICE-DISABLE VETERAN OWNED AND VETERAN OWNED SMALL BUSINESS SUBCINTRACTING PLAN REQUIREMENTS (OCT 2026) (DEVIATION)71
4.22 852.219-78 SUBCONTRACTING COMMITMENTS (OCT 2026) (DEVIATION)71
4.23 852.232-73 LIMITATION OF GOVERNMENT’S OBLIGATION (OCT 2026) (DEVIATION)72
4.24 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)73
4.25 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)74
4.26 IT CONTRACT SECURITY75
ATTACHMENTS85

STATEMENT OF WORK, INSTRUCTIONS AND INFORMATION TO BIDDERS

1.1 STATEMENT OF WORK

Central Virginia VA Health Care System (CVHCS) 1201 Broad Rock Blvd.

Richmond, Virginia 23249

STATEMENT OF WORK

Project : 652-23-109 Project Title: Renovate SPS Phase 3

1. Scope of Work The Contractor shall provide the following services in accordance with this Scope of Work and all contract drawings, specifications, and amendments. The work includes furnishing all labor, materials, equipment, supervision, and services necessary to complete the phased renovation and modification of the Sterile Processing Service (SPS) Area Located in the lower level of Building 500 Decontamination area as indicated on the drawings and specified herein. This renovation encompasses the 3rd Phase of renovations area as required by drawings.

1. The project consists of, but is not limited to, the following:

a. Construction of new partitions to create a vestibule entry and support spaces.

b. Installation of surface-mounted sliding door system at vestibule entry.

c. Demolition of existing finishes, including removal of ceramic tile flooring and wall finishes.

d. Installation of new SPS-compliant seamless flooring and wall finishes.

e. Installation of new and existing SPS equipment, including:

i. Washer/disinfectors (Getinge 86 Series S-8666 / S-8668)

ii. Cart washer (Getinge 9100 Series)

iii. Reprocessing sinks (AMSCO Model 50)

iv. Sterilizer loading car and transfer carriage (STERIS)

v. Construction and fit-out of Detergents Room.

vi. Structural slab modifications.

vii. Plumbing, mechanical, and electrical modifications required to support new equipment and layouts.

viii. Installation of signage in accordance with VA standards.

2. Work must include all incidental items required for a complete and operational system, whether or not specifically indicated.

3. Period of performance is 365 calendar days.

2. Contract Specification/Drawings The following contract drawings are included in their entirety by reference in this Scope of Work:

Drawing Title: AE Renovate SPS Phase 3 Drawing Date: 10/29/2026 Number of Pages: 78 Filename: 652-23-109 Renovate SPS Phase 3 - Drawing Set – Bid.pdf

The following contract specifications are included in their entirety by reference in this Scope of Work:

SECTION NO
DIVISION AND SECTION TITLES
DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15
List of Drawing Sheets
05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00
General Requirements
11-21
01 32 16.15
Project Schedules (Small Projects – Design/Bid/Build
01-24
01 33 23
Shop Drawings, Product Data, and Samples
11-23
01 35 26
Safety Requirements for Major Projects
05-24
01 42 19
Reference Standards
11-20
01 45 00
Quality Control
02-21
01 45 35
Special Inspections
06-21
01 58 16
Temporary Interior Signage
07-15
01 74 19
Construction Waste Management
04-22
01 91 00
General Commissioning Requirements
04-22

DIVISION 02 – EXISTING CONDITIONS

02 41 00
Demolition
08-17

DIVISION 03 – CONCRETE

03 30 53
(Short-Form) Cast-in-Place Concrete
01-21

DIVISION 04 – MASONRY

04 20 00
Unit Masonry
08-17

DIVISION 05 – METALS

05 40 00
Cold-Formed Metal Framing
01-21
05 50 00
Metal Fabrications
08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00
Rough Carpentry
10-17

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 84 00
Firestopping
01-21
07 92 00
Joint Sealants
04-22

DIVISION 08 - OPENINGS

08 11 13
Hollow Metal Doors and Frames
01-21
08 31 13
Access Doors and Frames
04-22
08 38 16
Flexible Traffic Doors
01-21
08 56 19
Pass Windows
01-21
08 71 00
Door Hardware
03-24
08 71 13
Automatic Door Operators
01-21
08 80 00
Glazing
01-21
08 90 00
Louvers and Vents
01-21
SECTION NO
DIVISION AND SECTION TITLES
DATE

DIVISION 09 – FINISHES

09 05 16
Subsurface Preparation for Floor Finishes
01-21
09 06 00
Schedule for Finishes
01-21
09 22 16
Non-Structural Metal Framing
06-18
09 29 00
Gypsum Board
04-20
09 65 13
Resilient Base and Accessories
01-21
09 65 16
Resilient Sheet Flooring
06-22
09 67 23.30
Resinous (Epoxy Resin Composition) Mortar Flooring

(RES-3)

05-24

09 91 00
Painting
01-21
09 96 59
Resinous Specialty Glazed Coating Systems for Walls,

Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2) 01-21

DIVISION 10 – SPECIALTIES

10 14 00
Signage
01-21
10 26 00
Wall and Door Protection
01-21

DIVISION 11 – EQUIPMENT

11 71 01
Medical Washing and Sterilizing Equipment
01-21
11 71 02
Laboratory Washing and Sterilizing Equipment
01-21

DIVISION 12 – FURNISHINGS

12 31 00
Manufactured Metal Casework
01-21
12 34 00
Manufactured Plastic Casework
01-21
12 35 70.21
Medication Cabinet
01-21
12 36 00
Countertops
12-23
12 56 70
Clean Room Tables

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41
Seismic Restraint Requirements
03-26

DIVISION 21- FIRE SUPPRESSION

21 08 00
Commissioning of Fire Suppression System
11-16
21 13 13
Wet-Pipe Sprinkler Systems
06-15

DIVISION 22 – PLUMBING

22 05 11
Common Work Results for Plumbing
01-23
22 05 19
Meters and Gages for Plumbing Piping
09-20
22 05 23
General-Duty Valves for Plumbing Piping
09-20
22 07 11
Plumbing Insulation
09-19
22 08 00
Commissioning of Plumbing Systems
11-16
22 11 00
Facility Water Distribution
05-21
22 13 00
Facility Sanitary and Vent Piping
09-20
22 40 00
Plumbing Fixtures
05-24
SECTION NO
DIVISION AND SECTION TITLES
DATE

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11
Common Work Results for HVAC
03-23
23 05 41
Noise and Vibration Control for HVAC Piping and

Equipment 03-23

23 05 93
Testing, Adjusting, and Balancing for HVAC
03-23
23 07 11
HVAC and Boiler Plant Insulation
02-20
23 08 00
Commissioning of HVAC Systems
03-23
23 09 23
Direct-Digital Control System for HVAC
03-23
23 21 13
Hydronic Piping
03-23
23 22 13
Steam and Condensate Heating Piping
03-24
23 31 00
HVAC Ducts and Casings
03-23
23 36 00
Air Terminal Units
03-23
23 37 00
Air Outlets and Inlets
03-23

DIVISION 25 – INTEGRATED AUTOMATION (Reserved)

DIVISION 26 – ELECTRICAL

26 05 11
Requirements for Electrical Installations
11-22
26 05 19
Low-Voltage Electrical Power Conductors and Cables
11-22
26 05 26
Grounding and Bonding for Electrical Systems
11-22
26 05 33
Raceway and Boxes for Electrical Systems
11-22
26 05 73
Overcurrent Protective Device Coordination Study
11-22
26 08 00
Commissioning of Electrical Systems
11-22
26 09 23
Lighting Controls
11-22
26 27 26
Wiring Devices
11-22
26 51 00
Interior Lighting
03-24

DIVISION 27 – COMMUNICATIONS

27 05 11
Requirements for Communications Installations
09-19
27 05 26
Grounding and Bonding for Communications Systems
06-15
27 05 33
Raceways and Boxes for Communications Systems
10-18
27 10 00
Control, Communication and Signal Wiring
06-15
27 15 00
Communications Structured Cabling
01-16

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00
Common Work Results for Electronic Safety and Security
04-18
28 05 13
Conductors and Cables for Electronic Safety and

Security 10-18

28 05 26
Grounding and Bonding for Electronic Safety and

Security 09-11

28 05 28.33
Conduits and Backboxes for Electronic Safety and

Security 09-11

28 08 00
Commissioning of Electronic Safety and Security Systems
11-16
28 13 00
Physical Access Control System
10-11
28 13 53
Security Access Detection
09-11

In the instance that information on the contract drawings should conflict with the information in the specification, the specifications shall always take precedence over the drawings.

3. Bid Schedule

a. ITEM I, GENERAL CONSTRUCTION: BASE BID: Work includes general construction, necessary removal of existing building elements and phased construction for SPS final phase construction as documented.

b. Perform work in phases as required to maintain facility operations.

c. Provide temporary partitions, barriers, and infection control measures during construction.

d. Sequence demolition and installation to maintain required SPS workflow and environmental conditions. All work shall be performed during the hours of 7:00 am to 4:00 pm, unless otherwise approved by the VA.

4. Period of Performance The contractor shall have 365 days from the Notice to Proceed to complete all work associated with this Scope of Work.

4.1. Impacts on Patient Care

The contractor shall ensure that all construction, maintenance, and related activities performed under this Scope of Work fully support the continuous delivery of safe patient care. Work must be planned, coordinated, and executed in accordance with VA and VHA requirements for maintaining a functional clinical environment and preventing disruption to patient services. Activities that may affect patients, staff, or clinical operations—such as noise, vibration, odors, dust, utility interruptions, or restricted access—shall be identified in advance and mitigated through appropriate scheduling, phasing, Infection Control Risk Assessments (ICRAs), and communication with VA-designated personnel. The contractor shall coordinate all outage requests and disruptive work with the VA prior to execution and shall not proceed without written VA approval. Whenever required to protect patient care operations, the contractor shall perform work during off-hours, including evenings, nights, or weekends, as directed by the VA. The contractor must adhere to all VA safety, infection control, and environmental requirements and maintain compliance with applicable VHA directives and facility policies throughout the performance of this work.

5. VA Information Security Requirements

5.1 GENERAL

Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.

5.2 ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS

a. A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees, subcontractors, and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or task order.

b. All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and Preparedness is responsible for these policies and procedures.

c. Contract personnel who require access to national security programs must have a valid security clearance. National Industrial Security Program (NISP) was established by Executive Order 12829 to ensure that cleared U.S. defense industry contract personnel safeguard the classified information in their possession while performing work on contracts, programs, bids, or research and development efforts. The Department of Veterans Affairs does not have a Memorandum of Agreement with Defense Security Service (DSS). Verification of a Security Clearance must be processed through the Special Security Officer located in the Planning and National Security Service within the Office of Operations, Security, and Preparedness.

d. Custom software development and outsourced operations must be located in the U.S. to the maximum extent practical. If such services are proposed to be performed abroad and are not disallowed by other VA policy or mandates, the contractor/subcontractor must state where all non-U.S. services are provided and detail a security plan, deemed to be acceptable by VA, specifically to address mitigation of the resulting problems of communication, control, data protection, and so forth. Location within the U.S. may be an evaluation factor.

e. The contractor or subcontractor must notify the Contracting Officer immediately when an employee working on a VA system or with access to VA information is reassigned or leaves the contractor or subcontractor’s employ. The Contracting Officer must also be notified immediately by the contractor or subcontractor prior to an unfriendly termination.

5.3 VA INFORMATION CUSTODIAL LANGUAGE

a. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1).

b. VA information should not be co-mingled, if possible, with any other data on the contractor’s/subcontractor’s information systems or media storage systems in order to ensure VA requirements related to data protection and media sanitization can be met. If co-mingling must be allowed to meet the requirements of the business need, the contractor must ensure that VA’s information is returned to the VA or destroyed in accordance with VA’s sanitization requirements. VA reserves the right to conduct on-site inspections of contractor and subcontractor IT resources to ensure data security controls, separation of data and job duties, and destruction/media sanitization procedures are in compliance with VA directive requirements.

c. Prior to termination or completion of this contract, contractor/subcontractor must not destroy information received from VA, or gathered/created by the contractor in the course of performing this contract without prior written approval by the VA. Any data destruction done on behalf of VA by a contractor/subcontractor must be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management and its Handbook 6300.1 Records Management Procedures, applicable VA Records Control Schedules, and VA Handbook 6500.1, Electronic Media Sanitization. Self-certification by the contractor that the data destruction requirements above have been met must be sent to the VA Contracting Officer within 30 days of termination of the contract.

d. The contractor/subcontractor must receive, gather, store, back up, maintain, use, disclose and dispose of VA information only in compliance with the terms of the contract and applicable Federal and VA information confidentiality and security laws, regulations and policies. If Federal or VA information confidentiality and security laws, regulations and policies become applicable to the VA information or information systems after execution of the contract, or if NIST issues or updates applicable FIPS or Special Publications (SP) after execution of this contract, the parties agree to negotiate in good faith to implement the information confidentiality and security laws, regulations and policies in this contract.

e. The contractor/subcontractor shall not make copies of VA information except as authorized and necessary to perform the terms of the agreement or to preserve electronic information stored on contractor/subcontractor electronic storage media for restoration in case any electronic equipment or data used by the contractor/subcontractor needs to be restored to an operating state. If copies are made for restoration purposes, after the restoration is complete, the copies must be appropriately destroyed.

f. If VA determines that the contractor has violated any of the information confidentiality, privacy, and security provisions of the contract, it shall be sufficient grounds for VA to withhold payment to the contractor or third party or terminate the contract for default or terminate for cause under Federal Acquisition Regulation (FAR) part 12.

g. If a VHA contract is terminated for cause, the associated BAA must also be terminated and appropriate actions taken in accordance with VHA Handbook 1600.01, Business Associate Agreements. Absent an agreement to use or disclose protected health information, there is no business associate relationship.

h. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.

i. The contractor/subcontractor’s firewall and Web services security controls, if applicable, shall meet or exceed VA’s minimum requirements. VA Configuration Guidelines are available upon request.

j. Except for uses and disclosures of VA information authorized by this contract for performance of the contract, the contractor/subcontractor may use and disclose VA information only in two other situations: (i) in response to a qualifying order of a court of competent jurisdiction, or (ii) with VA’s prior written approval. The contractor/subcontractor must refer all requests for demands for production of, or inquiries about, VA information and information systems to the VA contracting officer for response.

k. Notwithstanding the provision above, the contractor/subcontractor shall not release VA records protected by Title 38 U.S.C. 5705, confidentiality of medical quality assurance records and/or Title 38 U.S.C. 7332, confidentiality of certain health records pertaining to drug addiction, sickle cell anemia, alcoholism or alcohol abuse, or infection with human immunodeficiency virus. If the contractor/subcontractor is in receipt of a court order or other requests for the above-mentioned information, that contractor/subcontractor shall immediately refer such court orders or other requests to the VA contracting officer for response.

For service that involves the storage, generating, transmitting, or exchanging of VA sensitive information but does not require C&A or an MOU-ISA for system interconnection, the contractor/subcontractor must complete a Contractor Security Control Assessment (CSCA) on a yearly basis and provide it to the COR.

5.4 – 5.5 NOT USED

5.6 SECURITY INCIDENT INVESTIGATION

a. The term “security incident” means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. The contractor/subcontractor shall immediately notify the COR and simultaneously, the designated ISO and Privacy Officer for the contract of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access.

b. To the extent known by the contractor/subcontractor, the contractor/subcontractor’s notice to VA shall identify the information involved, the circumstances surrounding the incident (including to whom, how, when, and where the VA information or assets were placed at risk or compromised), and any other information that the contractor/subcontractor considers relevant.

c. With respect to unsecured protected health information, the business associate is deemed to have discovered a data breach when the business associate knew or should have known of a breach of such information. Upon discovery, the business associate must notify the covered entity of the breach. Notifications need to be made in accordance with the executed business associate agreement.

d. In instances of theft or break-in, or other criminal activity, the contractor/subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG and Security and Law Enforcement. The contractor, its employees, and its subcontractors and their employees shall cooperate with VA and any law enforcement authority responsible for the investigation and prosecution of any possible criminal law violation(s) associated with any incident. The contractor/subcontractor shall cooperate with VA in any civil litigation to recover VA information, obtain monetary or other compensation from a third party for damages arising from any incident, or obtain injunctive relief against any third party arising from, or related to, the incident.

5.7 LIQUIDATED DAMAGES FOR DATA BREACH

a. Consistent with the requirements of 38 U.S.C. §5725, a contract may require access to sensitive personal information. If so, the contractor is liable to VA for liquidated damages in the event of a data breach or privacy incident involving any SPI the contractor/subcontractor processes or maintains under this contract.

b. The contractor/subcontractor shall provide notice to VA of a “security incident” as set forth in the Security Incident Investigation section above. Upon such notification, VA must secure from a non-Department entity or the VA Office of Inspector General an independent risk analysis of the data breach to determine the level of risk associated with the data breach for the potential misuse of any sensitive personal information involved in the data breach. The term 'data breach' means the loss, theft, or other unauthorized access, or any access other than that incidental to the scope of employment, to data containing sensitive personal information, in electronic or printed form, that results in the potential compromise of the confidentiality or integrity of the data. Contractor shall fully cooperate with the entity performing the risk analysis. Failure to cooperate may be deemed a material breach and grounds for contract termination.

c. Each risk analysis shall address all relevant information concerning the data breach, including the following:

(1)Nature of the event (loss, theft, unauthorized access);
(2)Description of the event, including:
(a)date of occurrence;
(b)data elements involved, including any PII, such as full name, social security number, date of birth, home address, account number, disability code;
(3)Number of individuals affected or potentially affected;
(4)Names of individuals or groups affected or potentially affected;
(5)Ease of logical data access to the lost, stolen or improperly accessed data in light of the degree of protection for the data, e.g., unencrypted, plain text;
(6)Amount of time the data has been out of VA control;
(7)The likelihood that the sensitive personal information will or has been compromised (made accessible to and usable by unauthorized persons);
(8)Known misuses of data containing sensitive personal information, if any;
(9)Assessment of the potential harm to the affected individuals;
(10)Data breach analysis as outlined in 6500.2 Handbook, Management of Security and Privacy Incidents, as appropriate: and
(11)Whether credit protection services may assist record subjects in avoiding or mitigating the results of identity theft based on the sensitive personal information that may have been compromised.
d.Based on the determinations of the independent risk analysis, the contractor shall be responsible for paying to the VA liquidated damages in the amount of $per affected individual to cover the cost of providing credit protection services to affected individuals consisting of the following:
(1)Notification;
(2)One year of credit monitoring services consisting of automatic daily monitoring of at least 3 relevant credit bureau reports;
(3)Data breach analysis;
(4)Fraud resolution services, including writing dispute letters, initiating fraud alerts and credit freezes, to assist affected individuals to bring matters to resolution;
(5)One year of identity theft insurance with $20,000.00 coverage at $0 deductible; and
(6)Necessary legal expenses the subjects may incur to repair falsified or damaged credit records, histories, or financial affairs.

5.8 SECURITY CONTROLS COMPLIANCE TESTING

On a periodic basis, VA, including the Office of Inspector General, reserves the right to evaluate any or all of the security controls and privacy practices implemented by the contractor under the clauses contained within the contract. With 10 working-days’ notice, at the request of the government, the contractor must fully cooperate and assist in a government-sponsored security controls assessment at each location wherein VA information is processed or stored, or information systems are developed, operated, maintained, or used on behalf of VA, including those initiated by the Office of Inspector General. The government may conduct a security control assessment on shorter notice (to include unannounced assessments) as determined by VA in the event of a security incident or at any other time.

5.9 TRAINING

a. All contractor employees and subcontractor employees requiring access to VA information and VA information systems shall complete the following before being granted access to VA information and its systems:

(1) Sign and acknowledge (either manually or electronically) understanding of and responsibilities for compliance with the Contractor Rules of Behavior, Appendix E relating to access to VA information and information systems;

(2) Successfully complete the VA Cyber Security Awareness and Rules of Behavior training and annually complete required security training;

(3) Successfully complete the appropriate VA privacy training and annually complete required privacy training; and

(4) Successfully complete any additional cyber security or privacy training, as required for VA personnel with equivalent information system access [to be defined by the VA program official and provided to the contracting officer for inclusion in the solicitation document – e.g., any role-based information security training required in accordance with NIST Special Publication 800-16, Information Technology Security Training Requirements.]

b. The contractor shall provide to the contracting officer and/or the COR a copy of the training certificates and certification of signing the Contractor Rules of Behavior for each applicable employee within 1 week of the initiation of the contract and annually thereafter, as required.

c. Failure to complete the mandatory annual training and sign the Rules of Behavior annually, within the timeframe required, is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the training and documents are complete

6. FRAUD, WASTE, AND ABUSE

The vendor has responsibility for “Duty to Report” any fraud, waste and abuse witnessed while on VA premises to the Integrity and Compliance Officer.

1.2 INSTRUCTIONS AND INFORMATION TO BIDDERS

1. SUBMISSION OF BIDS:

The bidder shall submit the following in response to this Invitation for Bids:

(a) A completed and signed Standard Form 1442. Contractor must acknowledge all amendments in block 19 at the time of the bid opening.

(b) A fully executed bid bond.

(c) Documentation of safety record. See item 7.

(d) All provisions and clauses that require bidder acknowledgment and signature.

2. PRE-BID CONFERENCE: A pre-bid conference/site-visit has been scheduled for Wednesday, December 2, 2026, at 1:30PM EDT. Interested parties shall first meet outside of the Engineering Suite, 2K-137, on the catwalk, of the Central Virginia VA HCS, Richmond, VA. This pre-bid conference will be the only opportunity for potential bidders to visit the site. Park in designated areas only while attending the site visit. Parking in “no parking” areas or “reserved” spots could result in a ticket being issued and/or vehicle being towed away. Best entrance to use is the South Mall Entrance. See Attachments F and G for details.

NOTE: Questions regarding this solicitation must be submitted via email to denise.morman@va.gov. NO TELEPHONE QUESTIONS WILL BE ACCEPTED. Cut off for questions is Wednesday, December 9th, 2026, BY 3:00PM EDT. NO FURTHER QUESTIONS WILL BE ADDRESSED AFTER THAT DATE/TIME.

3. BID SUBMISSION & OPENING: All bids shall be submitted by the prime contractor. Bids must be submitted by electronics means through email to denise.morman@va.gov. Submit bids via email to the Contracting Officer ONLY. All bids submitted electronically are due no later than 3:00PM EDT on Wednesday, January 6th, 2027. Please do NOT submit bids through the mail or attempt to hand in bids in person. LATE BIDS WILL NOT BE ACCEPTED. NOTE: To be considered and accepted as timely the bid must be uploaded, emailed, or submitted in its entirety prior to the deadline. Failure to provide a bid in its entirety prior to the deadline will render the bid noncompliant.

A PUBLIC BID OPENING WILL BE CONDUCTED ONLINE VIA MICROSFOT TEAMS. BIDS WILL BE OPENED AND READ ON Thursday, January 7th, 2027, AT 1:30PM EDT.

Bidders and interested members of the public may use the link below to attend the Bid Opening.

Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2414847404973944?p=BnyQEc3VWo1X6plhpy Meeting ID: 241 484 740 497 394 4 Passcode: NH3rw6m8

SUMMARY OF DATES:

· Pre-Bid Conference/Site Visit: Wednesday, December 2nd, 2026, at 1:30PM EDT

· Questions Due: Wednesday, December 9th, 2026, by 3:00pm EDT

· Bids Due: Wednesday, January 6th, 2027, by 3:00pm EDT

· Bid Opening: Thursday, January 7th, 2027, at 1:30PM EDT

4. BASIS FOR AWARD: The Government intends to award a contract to the responsible offeror with the lowest evaluated price. The final bid price must include all costs to sufficiently cover all work involved in accordance with (IAW) the Statement of Work (SOW), drawings and specifications. When price is the only factor considered, award will be based on the lowest reasonable price received. Award will be made to the responsible bidder (see RFO 9.1) whose bid is responsive to the terms of the invitation for bids and is most advantageous to the Government, considering only price and price related factors included in the invitation, as provided in RFO subpart 14.3.

5. TECHNICAL BID: A technical bid is not required.

6. EVALUATION OVERVIEW: Bids will be evaluated and ranked according to price and price alone, from lowest to highest. Bids that are unreasonably high or unrealistically low in price, when compared to the Government estimate, and market conditions evidenced by other competitive bids received, may be indicative of an inherent lack of understanding of the solicitation requirements, the statement of work and/or may result in bid rejection without discussion.

7. SAFETY AND ENVIRONMENTAL RECORD: In accordance with VHA Directive 7715 the Contract Specialist and Contracting Officer will review the offeror’s safety and environmental record as part of their standard responsibility determinations in accordance with FAR 9.105. In order to be eligible for consideration and award, the contractor shall have no more than two serious, one repeat, or one willful OSHA or EPA Violation(s) in the past 5 years. Should the offeror not meet the standard of having no more than two serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 5 years and an Experience Modification Rate of equal to or less the 1.0, the Contracting Officer will follow the procedures from RFO 19.204 and refer the matter to the cognizant SBA Government Contracting Office. With the bid submission, the Government is requesting the following:

a. A self-certification on company letterhead that the bidder has no more than two (2) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past five years along with copies of their OSHA logs (OSHA Form 300A) for the past three years. If the firm has been in business for less than three years, they shall submit copies of their OSHA logs for the period of time they have been in business. See more information on Attachment E.

b. Information regarding their current Experience Modification Rate (EMR) equal to or less than 1.0. This information shall be obtained from the bidder's/offeror's insurance company and be furnished on the insurance carrier's letterhead. Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker's compensation insurance rating bureau. Complete information on Attachment E.

8. TRAINING: All employees of the general contractor and subcontractors shall have the 10-hour OSHA certified construction safety course and/or other relevant competency training, as determined by the COR with input from the ICRA (Infection Control Risk Assessment) team. The General Contractor’s competent person shall have completed the 30-hour OSHA certified construction safety course. Documentation of training shall be submitted to the Contracting Officer for review and approval prior to any work being performed. No ID badge will be issued to an employee who does not provide this documentation. There shall be no exceptions to this requirement.

9. MAGNITUDE OF CONSTRUCTION: IAW VAAR 836.204, the magnitude of construction is estimated to be between $2,000,000 and $5,000,000.

10. DESCRIPTION OF WORK: Contractor shall provide all administration, supervision, labor, materials, tools, and equipment, and perform all operations necessary to complete the phased renovation and modification of the Sterile Processing Service (SPS) Area Located in the lower level of Building 500 Decontamination area as indicated on the drawings and specified herein. This renovation encompasses the 3rd Phase of renovations area as required by drawings. A Security Accreditation Package is not required.

11. COMPLETION TIME: All work shall be completed within the time limit selected from receipt of the Notice to Proceed (NTP).

· Base Bid: 365 calendar days from NTP

12. SDVOSB SET-ASIDE: This procurement is 100% set-aside for Service-Disabled, Veteran-Owned Small Business (SDVOSB). Bids are solicited only from SDVOSB concerns. Bids received from non-SDVOSB concerns will be rejected. In order to be considered, the firm must be registered in the SBA’s Veteran Small Business Certification (VetCert) database as a certified SDVOSB at the time of bid submission (https://veterans.certify.sba.gov).

13. CONTRACTOR RESPONSIBILITY: Contractor shall be required to complete all contract work and schedule a final inspection within the specified contract performance period. Should the Contractor fail to complete the contract work (including scheduling of the final inspection), and it is determined by the Government to be a Contractor-caused delay, the Contractor shall be in default status. If the Government determines it to be in the best interest of the Government to allow the Contractor to continue to perform contract work, the Contractor shall provide equitable consideration to the Government for additional time granted for completion of contract work. Such agreement shall not be deemed a waiver of the Government’s right to terminate this contract in the event the Contractor fails to complete the contract work (including scheduling of the final inspection) on or before the completion date.

14. PREPARATION OF BIDS/OFFERS/BIDS: The Government will not pay for any costs incurred in preparation and/or submission of bids.

15. PRIVACY AND CONFIDENTIALITY: Contractors to the Department of Veteran Affairs may be unintentionally exposed to sensitive information. Information may be overheard, seen on documents or electronic devices, or observed that could potentially violate the privacy and confidentiality of our veterans, employees, volunteers, and their families. Regulations such as but not limited to the Health Insurance Portability and Accountability Act of 1996 (HIPAA), Freedom of Information Act (FOIA) and Privacy Act of 1974 have been enacted to protect sensitive information from being improperly disclosed. Information should not be divulged or released to anyone unless specifically authorized by this contract or attached documents in accordance with the contracted services. Failure to comply with applicable statutes and regulation can result in the termination of this contract and civil/criminal penalties, including fines and/or imprisonment. All suspected or actual breeches of privacy and confidentiality should be reported immediately to the Contracting Officer, Contracting Officer’s Representative (COR) or the Facility Privacy Officer.

16. VETS 4212: Title 38, USC Section 4212(d), and Public Law 105-339, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS 4212 reporting information can be done electronically at: https://www.dol.gov/agencies/vets/programs/vets4212. Award cannot be made unless the awardee has filed their VETS 4212 Report. Therefore, all bidders/offerors are encouraged to file every year.

17. SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at http://www.SAM.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Bidders are encouraged to ensure that they are registered in SAM prior to submitting their bid.

System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

BIDDERS NEW TO THE DEPT OF VETERANS AFFAIRS: If you are a vendor, who has never been awarded a contract by any VA facility and are looking to submit a bid, it is suggestion to complete the Vendorization process. Completing this early ensures you are already in the system in the event you are awarded a contract, as this process can delay award. Electronic Vendorization process can be found at https://www.cep.fsc.va.gov/. This is just a suggestion.

THIS IS NOT A SOLICITATION REQUIREMENT TO SUBMIT A BID.

SOLICITATION PROVISIONS

2.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .