This is an Amendment to Solicitation document (Amendment 0001) issued on March 10, 2026, by the Department of Veterans Affairs Network Contracting Office 6 in Hampton, Virginia for solicitation 36C24626Q0387. The amendment provides answers to vendor questions regarding Emergency Well Network Water Testing Services for the Asheville VAMC under a Base + 4 Option Year Contract.
The amendment clarifies key operational parameters for the water testing services: only one discharge point (above ground, adjacent to the campus water storage tank) requires monthly testing despite seven wells existing in the system, as all wells are plumbed in series. Contractors must collect samples from this single discharge point and perform the full testing panel outlined in the Performance Work Statement. Lab reports are required within five days of each sampling event. Purge water disposal must comply with SWPPP standards, with runoff directed to the storm system once any sediment is contained. Testing methods are the contractor's responsibility, with no specific analytical methods mandated at this time. There is no incumbent contractor, and this is not a follow-on to a previous contract. The amendment confirms that all other terms and conditions of the original solicitation remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24626Q0387.docx | DOCX document | |
| Wage Determination 2015-4369 rev 12.3.2025.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 03-10-2026 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders
36C24626Q0387 03-06-2026
X X X The purpose of this amendment is to provide answers to vendors questions.
A). Please see the following page for questions and answers.
B). All other terms and conditions remain the same.
ZANONA PICKETT
CONTRACTING OFFICER
Vendor Questions & Answers
1) How many wells need to be tested on a monthly basis?
While there are (7) wells in the system, only one discharge point will need to be tested.
2) How do the wells need to be tested? Using low flow sampling methods?
All wells are plumbed in series. A sample from the single discharge point will be taken.
3) Can you send over the details of the wells, such as total depth and water levels?
Unnecessary. Discharge point for well water sampling is above ground.
4) What are your requirements for purge water disposal?
SWPPP. No additives are included in the discharge water at this time so runoff can go to storm system once sediment (if any present) is contained.
5) Are you referring to ferrous and ferric iron when you list ferrous and ferric materials in the analytical list?
Ferrous
6) Is the final report required within 5 days of sampling? Or is the lab report required within 5 days and the final report is to be submitted later?
Lab report required within 5 days of each sampling.
7) Is there an incumbent? If so, please provide the total contract value, length and number. No
8) Is the scope of work the same as the previous contract? Not applicable
9) Can the government confirm the number of sampling locations within the emergency well network that will require testing during each monthly sampling event? One discharge point.
10) Will each sampling location require the full testing panel listed in the Performance Work Statement during each monthly testing event? See response to question 9. All testing criteria listed in the PWS is required.
11) Where on site are the sampling services to take place? Please provide a map of the locations on site where the sampling services are to be performed. At the discharge point immediately adjacent to the campus water storage tank.
12) The solicitation lists ferrous and ferrous materials. Can you be more specific of what you mean by ferrous and ferrous materials? What kind of ferrous and ferrous materials?
See response to question 5.
13) Are there any specific analytical methods being requested for this opportunity?
None at this time.
14) As it relates to pH, free and total chlorine, how do you want us to go about testing those? As the shelf life of chlorine when taking samples to test it, is approximately fifteen minutes hence the samples not being accurate by the time we get back to the lab or you ship them to our lab. And the pH is up and down, so how would you want that to be tested?
Testing methods are the responsibility of the contractor.
001/36C24626Q0387
File details come from the government source that posted it. Updated .