This document is an Amendment to a Solicitation for an Architect-Engineer (A-E) contract issued by the Department of Veterans Affairs Network Contracting Office 6 in Hampton, VA. The project involves replacing and upgrading emergency power systems, equipment, and components at a VA facility, with a project number of 558-25-151. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and focuses on designing emergency power distribution systems for critical hospital infrastructure, including HVAC for various departments.
Key details include a submission deadline of May 30, 2025 at 10:00 a.m. EDT, with electronic SF 330 submissions required. The contract includes design services across multiple phases (feasibility, 30%, 60%, 90%, and 100% submissions) with a total design completion period of 285 calendar days, followed by a 730-day construction period. Evaluation criteria include specialized experience, professional qualifications, capacity, past performance, local knowledge, and construction period services. The estimated construction value is between $2-5 million, with a projected award date on or before September 30, 2025, using NAICS code 541330 (Engineering Services) with a $25.5 million small business size standard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Past Performance Questionnaire PPQ.pdf | ||
| 36C24625R0036_1.docx | DOCX document | |
| SF 330.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
0001 05-16-2025 558-25-151
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
To all Offerors/Bidders
36C24625R0036
04-30-2025
X
X X
X (One)
The purpose of this amendment is to answer questions from the industry as of 5/16/2025.
See Pages 2 - 4 for Questions and Answers.
Please ensure that a copy of this amendment (signed) is a part of the SF330 Submission Package.
Reminder: SF 330 Parts I and II (and attachments) Due No later than 10:00 a.m. Eastern Daylight Time on May 30, 2025.
Replace and Upgrade Emergency Power Systems, Equipment, And Components
Project # 558-25-151 RFI #1 (Questions & Answers)
1. Question: To seek clarification on the page count of the above referenced solicitation.
The firm noticed it says 3-5 project examples and CPARS and PPQ do not count towards the total. However, the firm never noticed a formal page number.
Answer: On Page 10 of 14 ~ Change From:
Criterion 4, Past Performance On contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. CPARS data or PPQs (if no CPARS data is available) must be provided for projects submitted under Factor 1 (Specialized Experience). Please utilize the attached PPQ document, if needed.
CPARS data and PPQs do not count toward the page limitation. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, and publicly available sources. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified. The following information is required for all projects:
contract/task order number, project title, prime firm, start date, and completion date.
Evaluations may also include additional performance-related from the firm, customer inquiries, Government databases, publicly available sources, and additional projects in
CPARS.
Change To:
Criterion 4, Past Performance On contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. CPARS data or PPQs (if no CPARS data is available) must be provided for projects submitted under Factor 1 (Specialized Experience). Please utilize the attached PPQ document, if needed.
Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, and publicly available sources. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified. The following information is required for all projects:
contract/task order number, project title, prime firm, start date, and completion date.
Evaluations may also include additional performance-related from the firm, customer inquiries, Government databases, publicly available sources, and additional projects in
CPARS.
2. Question: Is prior experience with projects in the specific locality required for engineering firms to be considered under Criterion 5? Answer: Proof of Knowledge
3. Question: How does Criterion 5 weigh prior project experience against other factors such as innovative solutions or technical expertise? Answer: SELECTION CRITERIA:
Evaluation and selection of firms will be based on submissions and direct responses to the following criteria which are numbered in descending order of importance. (Criterion 5 is not more important than criterion 1,2,3, or 4).
4. Question: In what ways can an Engineering Firm without previous VA project experience showcase its understanding of local conditions to meet Criterion 5? Answer:
Project # 558-25-151 RFI #1 (Questions & Answers)
Consider knowledge of what research your firm has done in advance that would prepare you for doing such a project.
5. Question: How does Criterion 5 apply to firms with substantial experience in similar localities but not specifically at the VA? Answer: Depends on details but should be similar and show some relevance to “knowledge” of the locality of the project.
6. Question: What types of local knowledge is most critical in fulfilling Criterion 5, and how can firms demonstrate this knowledge? Answer: First-hand experience or research – “Knowledge” is the key point here. Refer to specific knowledge such as stated in the criterion below.
Criterion 5, Knowledge of Locality
a. Include specific knowledge of certain local conditions or project site features, such as geological features, climatic conditions, local construction methods, construction firms, and trades labor availability, and local laws and regulations.
7. Question: The solicitation requires the submission of reference evaluations. Can a firm request a copy of these evaluations in the future? We believe this is important because some references may provide information that is opinion based or potentially misleading, which could unfairly affect the Agency's evaluation of our submission. Accurate representation in these evaluations is crucial to ensuring that all firms, particularly underrepresented minority own firms, are given a fair opportunity in this selection process. If any incorrect information is presented, we would like an opportunity to address it appropriately with the submitter, which may include seeking legal recourse if necessary.
Answer: Not clear on the term require when it comes to reference evaluations.
However, a PPQ attachment is provided as resource to capture the data needed when a CPARS is not available. The Government intends and is prepared to review evaluations that may also include additional performance-related from the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS.
The Government is always willing to give proper debriefs in compliance with regulations.
The Government will use all information for official use only and will not distribute the information. You may reach out to your reference and make your own request of evaluation. The request to return the PPQ document directly to the Contracting Team ensures that the integrity of the document is secured.
8. Change From:
Criterion 3, Capacity The evaluation will consider the firm’s plan and ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. Provide the available capacity of required disciplines by providing current project workload, inclusive of all projects awarded during the previous 12 months and the full potential value of any current indefinite delivery contracts. Provide a draft schedule IAW the 264-calendar day period of performance required for this project.
Change To:
Criterion 3, Capacity The evaluation will consider the firm’s plan and ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. Provide the available capacity of required disciplines by providing current project workload, inclusive of all projects awarded during the previous 12 months and the full potential value of any
Project # 558-25-151 RFI #1 (Questions & Answers) current indefinite delivery contracts. Provide a draft schedule IAW the 285-calendar day period of performance required for this project.