S02 TICS TABLE.pdf

PDF 774 KB Posted

Attached to
X1AA--Raleigh VA Standalone Dental Clinic (Second Submission)
Solicitation number
36C24624R0058
Issued by

About this file

This document appears to be a Tenant Improvement Cost Summary (TICS) table for a federal contract opportunity. The TICS table provides a detailed cost breakdown for construction and tenant improvement work, including material and labor costs across various divisions such as general requirements, finishes, HVAC, and electrical. It also includes instructions on how to complete the TICS table and defines key terms like "shell" and "tenant improvements."

The related federal contract opportunity is a Request for Lease Proposals (Solicitation Number: 36C24624R0058) issued by the Department of Veterans Affairs for a standalone dental clinic in Raleigh, North Carolina. The government is seeking a minimum of 10,130 net usable square feet of commercial office space with 60 parking spaces. The NAICS code for this procurement is 531120. A Source Selection Board will evaluate the offers, and the Source Selection Authority will make the final award determination.

View the file

Other files

File Type Posted
36C24624R0058 0003.docx DOCX document
36C24624R0058 0002.docx DOCX document
S06 36C24624R0058_RLP Amendment 1 Questions and Clarifications.pdf PDF
36C24624R0058 0001.docx DOCX document
S02 Exhibit G_3516 Solicitation Provisions12.2023.pdf PDF
S02 Exhibit K_Seismic Forms A - F with Instructions.docx DOCX document
S02 Exhibit J_12000 FPLS Part AandB_5.2015.docx DOCX document
S02 Exhibit C ASR_SOW Dental Clinic Final_slj.1.pdf PDF
S02 36C24624R0058_Request for Lease Proposal R100_RaleighDental Clinic.pdf PDF
S02 Exhibit B_Floor Plan_Raleigh Stand-Alone Dental Clinic Revised.pdf PDF
S02 Exhibit L_Security Requirements FSL Level II Aug. 2022_1.pdf PDF
S02 Exhibit E_1364_Attachment_Arev.pdf PDF
S02 Exhibit O_FAR 52.204-24 Representation Digital Nov. 2021.pdf PDF
S02 Exhibit M_Security Unit Price List FSL II 6.2022.pdf PDF
S02 Exhibit F_1217 - Lessor_s Annual Cost Statement.pdf PDF
S02 Exhibit A_36C24624L0006_Global Lease Template L100.10.23.pdf PDF
S02 Request for Lease Proposals 36C24624R0058 OPPORTUNITIES-DESCRIPTION.docx DOCX document
S02 Exhibit H_3517B General Clauses 12.2023.pdf PDF
S02 Exhibit D_1364 Proposal to Lease Space 1.2023.pdf PDF
S02 Exhibit P_Deed Proof of Ownership.pdf PDF
S02 36C24624R0058_1 Combined Synopsis_Solicitation Notice.docx DOCX document
S02 Exhibit Q_Wage Determination_Dental Clinic_Raleigh_SAM.gov.pdf PDF
S02 Exhibit I_3518 Representations and Certifications 1.2022.docx DOCX document
S02 Exhibit N_Tenant Improvements Cost Summary TICS Table Jul. 2022.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

for NUSF= -

Agency: - TIA PER NUSF= $

January 0, 1900 Location: TOTAL TIA -$

RU Factor RSF= - Masterformat

CSI System Elements TI* SHELL**

Div 1 General Requirements -$ -$ Div 2 Site work & Demolition -$ -$ Div 3 Concrete -$ -$ Div 4 Foundations / Masonry -$ -$ Div 5 Metals -$ -$ Div 6 Woods & Plastics -$ -$ Div 7 Thermal & Moisture -$ -$ Div 8 Doors & Windows -$ -$ Div 9 Finishes -$ -$ Div 10 Specialties -$ -$ Div 11 Equipment -$ -$ Div 12 Furnishings -$ -$ Div 13 Special Construction -$ -$ Div 15 General Construction -$ -$ Div 21 Fire Suppression -$ -$ Div 22 Plumbing -$ -$ Div 23 HVAC -$ -$ Div 26.1 Electrical -$ -$ Div 26.2 Lighting -$ -$ Div 27 Communications, Security & Other Elec. Systems -$ -$ Div 28.1 Electrical safety & Security -$ -$ Div 28.2 Security -$ -$ Div 32 Exterior -$ -$

Subtotal -$ -$ General Contractor Fee Percent -$ -$

Subtotal Construction Costs -$ -$ Architectural & Engineering Fees (NIC DID costs) -$ -$ Other Lessor Soft Costs*** -$ -$ Taxes 0.00% -$ -$

Subtotal Lessor's Costs: -$ -$ Lessor's Overhead and Profit Percent -$ -$

Total Price to Government: - -$ GRAND TOTAL $ Cost per NUSF

Notes:

Cost per RSF

* Include all subcontractors' costs.

Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the DEFINITIONS tablein the work book for the breakdown.

Other Lessor Soft Costs: typically project management, mortgage banking fee, counsel, travel, appraisal, permits, etc.

Provide separate breakdown separately or within the INPUT PROJECT INFO worksheet.

TENANT IMPROVEMENTS COST SUMMARY (TICS)

Trade Costs

M. TICS - Tenant Improvement Cost Summary Table

LEASE GS-XXX-XXX or Project Agency

Location: City, State

NUSF =

TIA PER NUSF =

RSF=

DATE:

General Contractor Fee percent 8.00% Taxes (if not included on contractor's bids), materials only

Lessor's Overhead and Profit percent 6.00%

TI Shell project management mortgage banking fee counsel travel appraisal permits

TOTAL -$ -$

General contractor fee and Lessor's overhead and profit fields are structured to allow you to choose percentage or a lump sum.

INFORMATION NEEDED TO COMPLETE TICS TABLE

Other Lessor Soft Costs, i.e. project management, mortgage banking fee, counsel, travel, appraisal, permits, etc. List separately.

Read and understand SHELL-TI DEFINITIONS tab.

Material Description Accurately describe each item being priced.

Quantity List the quantity e.g., 1,2, 3, etc.

Unit (Example) LS,EA,GAL,LF, SF, etc.

Cost Amount Total Total cost of all material.

Labor Hours Time projected to perform the task.

Labor Rate Cost per hour of labor.

Total Cost of labor.

TOTAL Combines overall materials and labor.

1.

2.

TIs include the finishes and fixtures that take space from the shell condition to a finished, usable condition.

1.

2.

DATE PREPARED

CONSTRUCTION COST ESTIMATE

DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL

1 GAL. $25.00 $25.00 2.5 $36.25 $90.63

$0.00 $0.00 $0.00 $0.00

Total $25.00 Total $90.63

TOTAL $115.63

10 GAL. $27.00 $270.00 6.0 $36.25 $217.50

$0.00 $0.00 $0.00 $0.00

Total $270.00 Total $217.50

TOTAL $487.50

INSTRUCTIONS

Fill each division tab 1-32 as needed for the construction to be preformed under the (SHELL) cost as indicated above.

Input project specific information as appropriate in the INPUT PROJECT INFO worksheet, in order to auto-populate the TICS worksheet. This includes Net Usable square footage (NUSF), soft costs, overhead and profit, fees, and taxes.

Fill out fields titled (TI), inputting only cost associated with (TI) as defined in the SHELL-TI DEFINITION'S tab.

Fill each division tab 1-32 as needed for the construction to be performed under the (TI) cost as indicated above.

Fill in each line for all Shell and TI items in the corresponding division tabs included in the Tenant Improvement Cost Summary (TICS). Include all subcontractors' soft costs. Example shown below.

Shell

Fill out light green fields titled (SHELL), inputting only cost associated with shell as defined in the SHELL-TI DEFINITION'S tab.

Tenant Improvements (TI)

January 0, 1900

ABC Paint

XYZ Paint

DIVISION 9 - FINISHES (TI)

MATERIAL LABOR

DIVISION 9 - FINISHES (SHELL)

Per GSA Pricing Desk Guide, 4th Edition.

TOTAL -$

CONSTRUCTION COST ESTIMATE

DIVISION 1 GENERAL REQUIREMENTS

DIVISION 2 SITE WORK AND DEMOLITION

DIVISION 3 CONCRETE

DIVISION 4 MASONRY

DIVISION 5 METALS

DIVISION 6 WOOD AND PLASTICS

DIVISION 7 THERMAL & MOISTURE

DIVISION 8 DOORS AND WINDOWS

DIVISION 9 FINISHES

DIVISION 10 SPECIALTIES

DIVISION 26.1 ELECTRICAL

DIVISION 11 EQUIPMENT

DIVISION 12 FURNISHINGS & EQUIPMENT

DIVISION 13 SPECIAL CONSTRUCTION

DIVISION 15 GEN CONSTRUCTION

DIVISION 21 FIRE SUPPRESSION SYSTEMS

DIVISION 22 PLUMBING

DIVISION 23 HEATING VENTILATION AND AIR CONDITIONING

DIVISION 26.2 LIGHTING

DIVISION 27 COMMUNICATIONS

DIVISION 28.1 ELECTRONIC, SAFETY

DIVISION 32 EXTERIOR

DIVISION 28.2 SECURITY

DATE PREPARED

CONSTRUCTION COST ESTIMATE

DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

TOTAL $0.00 TOTAL $0.00

TOTAL $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00

TOTAL $0.00 TOTAL $0.00

TOTAL $0.00

A&E DESIGN (TI)

MATERIAL LABOR

A&E DESIGN (SHELL)

File details come from the government source that posted it. Updated .