This document is a set of responses to requests for information (RFIs) related to a federal solicitation for the installation of conduit for a NextGen Wi-Fi system. The solicitation is for Bid Item I (Base Bid) and a Deduct Alternate Bid Item 1. The Base Bid is for the installation of conduit for future access point (AP) drops at various buildings, with a period of performance of 175 calendar days from notice to proceed (NTP). The Deduct Alternate Bid Item 1 is for the same work, but with certain locations excluded, and a shortened period of performance of 165 calendar days from NTP. The solicitation is being issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 6. The responses to the RFIs provide clarification on the specific requirements, such as the use of Procore software, scheduling, tax exemption, COVID-19 protocols, TB testing, and other logistical details. The document also includes details on the pricing structure, bid submission, and evaluation criteria.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 659-22-704-Specifications Revison for RFIs 10-24-2024.pdf | ||
| 17-A-116 B21_Rev_2024.10.24-30x42.pdf | ||
| S04-site visit sign in.pdf | ||
| 36C24624B0016 0001.docx | DOCX document | |
| 659-22-704-Drawings.pdf | ||
| 36C24624B0016_1.docx | DOCX document | |
| 659-22-704-Specification.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Will the owner accept Procore Project Management software as the primary submittal and data tracking tool for this project?
Response: Yes
2. Will the owner accept the “Out-Build Scheduling Software” for schedule submission and monthly updates?
Response: Yes, if it can meet the requirements of 01 00 00/1.3/I
3. Is this project tax-exempt, and will the CO/COR provide the necessary tax-exempt certificates?
Response: This project is not tax-exempt.
4. Because of COVID-19 throughout the U.S. and the resulting Federal, State and local governments’ responses/requirements, are there any new work requirements or mandates that will be required by the VA on this project?
Response:
TB, Flu, OSHA, and COVID-19 REQUIREMENTS:
o TB - The Contractor shall comply with the Federal OSHA Blood borne Pathogens Standard. The Contractor shall submit copies of negative results or test taken within 90 days before the start of work for every employee.
o Flu - The Contractor shall comply with the W. G. Hefner Medical Center VA Directive 1192 requirements for Flu Shots. All Construction Contractors working on site must either have a Flu Shot or wear a mask regardless of interaction with patient areas.
o OSHA – The Contractor shall comply with the Federal Guidelines. A minimum of 30(Forman)/10(Workers) hours training is required.
o COVID-19 - Per current VA guidelines, mandatory COVID-19 could reinstate screening at the entrances throughout all VA Medical centers.
Facilities could also enforce singular entrance to buildings where the screenings are being done to all who enter. If you are contracted to perform work within a timeframe of the current COVID-19 outbreak, please make appropriate preparations. Facilities may be enforcing the wearing of face masks in outbreak areas while on government property.
Performance of contractual duties is required unless there are interruptions or reasons to prohibit performance. In that circumstance, please communicate with the Contracting Officer (CO) and Contracting Officer Representative (COR) for guidance.
5. Many VA campuses are beginning to address tuberculosis protocols on VA campus projects, including the 90-day screening before assignment to the worksite. This requirement will limit the amount of personnel who can immediately perform work right after the award. Will this project be required to follow 01 35 26 1.13 for TB-required protocols and a requirement to follow the 90-day screening before beginning work on the project?
Response: Yes, this is a VA requirement and will be enforced. TB tests take about 3 to 4 days to get results. There should be no reason for this to cause any difficulties if proper scheduling and coordination of work is done by the contractor.
6. What is the approximate duration between issuing the award and issuing the NTP?
Response: Within 15 days from award.
7. For planning the preliminary project schedule, please provide an anticipated award date.
Response: As of 10/23/2024 the Projected Award Date is 12/20/2024.
8. How many calendar days should be included in the critical-path method schedule for the owner and A/E to review and respond to RFIs?
Response: Please see specification 01 00 00/1.3/I and 01 33 23/1.10.
9. How many calendar days should be included in the critical-path method schedule for owner and A/E submittal review?
Response: Please see specification 01 00 00/1.3/I and 01 33 23/1.10.
10. Will the Government provide the 3-D REVIT Design model in native file format for the creation of coordination drawings and use by contractor?
Response: No
11. The project scope is widespread across the building and performed in and around numerous existing building systems that will need coordination. How many site visits do owner consultants have for MEP and systems coordination with GC, and will the VA have a designated MEP representative available on site?
Response: VA conducted a very in-depth site visit. No more site visit will be schedule. The VA does not have designated MEP representative.
12. Knowing that the campus is limited on space and parking, it is critical that the contactor project superintendent have freedom of access and have close proximity to the work. Can the VA/Owner provide a designated parking spot for the contractor project superintendent?
Response: Contractor will be mobilizing near Building 6. Coordinate with COR for the lay down area that is reasonably close to the proximity to work.
13. Has the facility Operation & Maintenance team reviewed the Contract Documents for operability to avoid change orders?
Response: Scope of work indicates general layout of conduits. It is the responsibility of the contractor to submit shop drawings for the layout of each conduit run. During this process, if any issues arise the Contractor is to notify the COR/CO in accordance with FAR/VAAR.
14. Can the contractor use an existing office inside the building for a temporary construction office during construction instead of setting up a temporary trailer?
Response: Contractor will be mobilized near Building 6. Coordinate with COR for temporary areas near construction site. VA most likely cannot provide a space for an office during construction. So, all contractors shall plan for temporary trailer.
15. Can the contractor use the existing restroom facilities in the work area or adjacent ones nearby?
Response: No, Contractor shall provide their own toilet in their mobilization area.
16. Can the contractor use the existing on-site utilities for temporary electrical and water free of charge?
Response: See 01 00 00/1.3
17. Will the owner provide the fire watch during the period that the fire suppression and/or fire alarm system is not in service?
Response: No
18. Please provide detailed guidance for noise and vibration operations, including acceptable levels/duration, hours of operations for acceptable levels, and acceptable noise levels after hours.
Response: See spec section 01 57 19 – 7.
19. Spec 01 00 00-1 - 1.2 - A states Contractor is to "furnish labor and materials to perform work for the replacement of existing air handling units (AHU) in buildings". Please provide specs for this scope of work if this is included within this contract.
Response: Updated spec has been provided, items remove from specification
20. Spec 02 41 00-3 -3.1 - A states "Completely demolish and remove existing VCT and mastic from tunnels B5-6 and B5-7." Please provide the plans that reflect this request.
Response: Updated spec has been provided, items remove from specification
21. Spec 02 41 00-3 - 1.4 - A & B states the removal of outside utility service lines. Please provide further clarification on locations this is to be completed.
Response: Updated spec has been provided, items remove from specification
22. Will there be reflected ceiling plans provided?
Response: No
23. On drawing A-108, there is a note stating: "Existing Ductwork to work". Please confirm that HVAC will be included in this scope of work.
Response: This is a note to indicate that there is existing HVAC duct work at that location that may need to be worked around. There is no HVAC work in the scope of work for this project.
24. Spec 27 05 33-10 - E - 6 references to paint exposed conduit as specified in 09 91 00 Painting section. Please provide the spec for 09 91 00 Painting.
Response: Conduit is not required to be painted.
25. Solicitation shows only one line for grand total but there is an alternate option. There are no line items available to input the alternate pricing. Please advise how we are to present this alternate.
Response: See 01 00 00/1.2
STATEMENT OF BID ITEM(S)
(Base): Provide all labor, materials, tools, equipment, transportation, qualified supervision, and all aspects of construction described here in other specific tasks as further defined by this request for Bid. The work includes, but not limited to installation of conduit for future AP drops at the following locations, B1, B2, B3, B4, B5, B6, B7, B13, B14E, B14E, B15, B16, B17, B19, B20, B21, and B42. Period of performance is 175 calendar days from Notice to Proceed (NTP).
All work shall be coordinate for non-regular hours unless coordinate with COR. Regular hours at the VAMC Salisbury – Monday - Friday, 7:00am – 5:00pm.
BID ITEM I (DEDUCT ALTERNATE NO. 1) – Perform all work described in BID Item I, above except DELETE work associated with Bid Item II with providing all labor, materials, tools, equipment, transportation, qualified supervision, and all aspects of construction described here in other specific tasks as further defined by this request for Bid. The work includes, but not limited to installation of conduit for future AP drops at the following locations, B1, B2, B3, B4, B5, B6, B7, B13, B14E, B14E, B15, B16, B17, B19, B20, B21, and B42. Period of performance is 165 calendar days from Notice to Proceed (NTP).
26. Please confirm the AP runs (notated by yellow dashed lines in the drawings) are to be included within the pricing since these runs are not notated as a "bid item".
Response: is the AP run, that will be conducted by others
27. Please confirm that working hours are only allowed during "non-regular" hours (After 5pm until before 7am - Monday through Friday)
Response: Contractor is to assume all work conducted during non-regular hours. However, coordinate with COR if contractor wants to work during normal work hours.
28. On drawing A-106, there is a note stating: "Up to 1st Floor Room 1097". On the 1st Floor drawings "A-107", there is no Room 1097. Please provide plans including Room 1097.
Response: Rm 1097 was part of the site visit B4 First Floor 1097 Telecom -Closet
29. On drawing A-108, there is a note stating: "Existing Ductwork to work". Please confirm that HVAC will be included in this scope of work.
Response: This is a note to indicate that there is existing HVAC duct work at that location that may need to be worked around. There is no HVAC work in the project’s scope of work.
30. Please clarify if bids are to be emailed, mailed, or hand-delivered
Response: Bids are to be emailed to emailed to sean.cosby@va.gov prior to bid due date.
31. Does the QCM/Superintendent and SSHO required to be directly employed by the Prime Contractor
Response: YES
32. Can the QCM/Superintendent and SSHO be a Dual/Tri-hatted individual?
Response: YES
33. The specs are calling for installation of electrical conduit for future AP drops. The solicitation reads: “Installation NextGen Wi-Fi”. I am wanting clarification that the scope of work for this project only includes "conduit installation" for future devices and does not include Wi-Fi/EHRM device installation.
Response: This the second phase to the Installation of NextGen Wi-Fi project. This project’s scope is only for the installation of conduit for future devices.
34. General requirements: (1.2 general intention) this section describes replacement of an existing AHU. Just wanted to confirm that the solicitation is for the conduit installation only, and that the AHU replacement is not in the scope.
Response: Updated spec has been provided, items remove from specification
35. Want to confirm that cat6 cable will be the only cable being installed into the conduit?
Response: That is correct.
36. Please provide additional pictures for the surgical unit area as this area was off limits during site visit.
mailto:sean.cosby@va.gov
Access Hatch
37. Will Building 14 E be a part of the scope of work for this solicitation? It was mentioned during site visit that it may not be because it was a residential area.
Response: B14E will remain in scope.
38. Building 14 W: Will wire-mold be allowed in this location, or shall it be conduit?
Response: Yes, if it meets specifications.
39. Building 2 4th Floor: AP46 is in a restricted area during the site visit. Is the drop located in the room or the hallway.
Requesting pictures for clarification of conditions.
Response: Provide conduit run to location indicated on the drawings, Coordinate with COR. Please find pictures provided in question #36.
40. Building 19 (chapel) - please provide pictures of area above suspended ceiling.
41. Building 21: Please confirm proposed conduit route on the 1st floor.
Response: There are no conduit runs on the 1st floor of B21.
42. Building 21 Room 2A-109: Please confirm AP drop location at room 2A-109.
Response: See revised drawing 17-A-116 issued in this addendum.
43. The specs are calling for installation of electrical conduit for future AP drops. The solicitation reads Installation NextGen Wi-Fi. Wanted to clarify that the scope of work for this project only includes "conduit installation" for future devices and does not include Wi-Fi/EHRM device installation.
Response: Yes, scope of work requires installation of conduit for future devices.
44. General requirements: (1.2 general intention) this section describes replacement of an existing AHU. Just wanted to confirm that the solicitation is for the conduit installation only, and that the AHU replacement is not in the scope.
Response: There is no HVAC work in the scope of work for this project. This project is for installation of conduit only.
45. Does the QCM/Superintendent and SSHO required to be directly employed by the Prime Contractor?
46. Can the QCM/Superintendent and SSHO be a Dual/Tri-hatted individual?
47. Please clarify if bids are to be emailed, mailed, or hand delivered.
Response: Bids are to be emailed to emailed to sean.cosby@va.gov prior to bid due date.
48. Are the QCM/Superintendent and SSHO required to be directly employed by the Prime Contractor?
49. The specs are calling for installation of electrical conduit for future AP drops. The solicitation reads Installation
NextGen Wi-Fi. Wanted to clarify that the scope of work for this project only includes "conduit installation" for future devices and does not include Wi-Fi/EHRM device installation.
Response: Yes, Installation of electrical conduit for future devices
50. General requirements: (1.2 general intention) this section describes replacement of an existing AHU. Just wanted to confirm that the solicitation is for the conduit installation only, and that the AHU replacement is not in the scope.
Response: This is misdescribe note and has been removed in updated specification provided.
51. Is the SOW only to run the conduit? No testing of Wi-Fi System, etc. after?
Response: There is no testing work in the scope of work for this project. This project is for installation of conduit only.
52. Yellow AP Run already present or all future?
Response: is the AP run, that will be conducted by others mailto:sean.cosby@va.gov
53. What type of terminations required on the conduit?
Response: A compression connector and bushing, that meets specification 27 05 33, shall be at the beginning/end of each conduit run if it ends in free air.
Please see attached spreadsheet to clarification of scope.
54. Specify conduit size?
Response: See specification 27 05 33 The conduit size is to be a minimum of ¾” and meets these specifications.
55. There was some indication of Building 14E being residential and already having some upgrades completed. RFI is to confirm/verify that the project scope for Building 14E is required.
56. Please confirm that the route for the conduit in Building 21 is accurate.
Response: See revised drawing 17-A-116 issued in this addendum.
57. The drawings mention that we can get dimensions to understand the total lengths of conduit- can we request this info.
Response: Each drawings a scale is provided to allow for take-off to understand total length of conduit
58. The drawings mention 3 pathways of conduit- yellow line, blue dotted, and red line. We didn't find any type or diameter of this requested conduit or material type (EMT or PVC) to know what conduit to estimate there. Can you provide this?
Response: See specification 27 05 33 The conduit size is to be a minimum of ¾” and meets these specifications.
59. If we can’t get the type and diameter specified, can we understand how many cables at what diameter are going through each conduit? This will allow us to understand the proper diameter needed, based off the amount of the conduit that will be filled. It appears that only one CAT6 or 1 SM fiber will go through the conduit.
Response: See specification 27 05 33 The conduit size is to be a minimum of ¾” and meets these specifications.
60. Are we able to know which of the 3 types of conduits, PVC, EMT or Rigid, will be used as per the requirements or this building structure and code?
Response: See specification 27 05 33 The conduit is to be rigid and a minimum of ¾” and meets these specifications.
61. Are these locations of the WAPS decided already and they will not move or has that design been 100% Approved?
It looks like they are either in closets or next to exterior walls which may impact their signal negatively.
Response: These WAPS location have already been decided by AT&T.
62. Have you sourced a company for the Wi-Fi installation already or will that be decided at a later time, we would like to be considered if not.
Response: provided by AT&T.
63. Can you provide detail about the ceiling type and proposed/ recommended conduit fastening type and antenna mounting type. Are there any specific requirements to follow here? It’s assumed drop ceiling with the conduit above the ceiling dropping down to mount antennas on ceiling tiles.
Response: Please find chart found in Q&A responses regarding required 4-11/16” dual gang box situated horizontally at AP location.
64. Scope of Work Clarification: Could you please provide a detailed breakdown of the specific deliverables assumed in the Base Bid and Alternate Bid Item 1? This will help us accurately assess the scope of work and allocate resources accordingly.
Response: See 01 00 00/1.2
STATEMENT OF BID ITEM(S)
(Base): Provide all labor, materials, tools, equipment, transportation, qualified supervision, and all aspects of construction described here in other specific tasks as further defined by this request for Bid. The work includes, but not limited to installation of conduit for future AP drops at the following locations, B1, B2, B3, B4, B5, B6, B7, B13, B14E, B14E, B15, B16, B17, B19, B20, B21, and B42. Period of performance is 175 calendar days from Notice to Proceed (NTP).
All work shall be coordinate for non-regular hours unless coordinate with COR. Regular hours at the VAMC Salisbury – Monday - Friday, 7:00am – 5:00pm.
BID ITEM I (DEDUCT ALTERNATE NO. 1) – Perform all work described in BID Item I, above except DELETE work associated with Bid Item II with providing all labor, materials, tools, equipment, transportation, qualified supervision, and all aspects of construction described here in other specific tasks as further defined by this request for Bid. The work includes, but not limited to installation of conduit for future AP drops at the following locations, B1, B2, B3, B4, B5, B6, B7, B13, B14E, B14E, B15, B16, B17, B19, B20, B21, and B42. Period of performance is 165 calendar days from Notice to Proceed (NTP).
65. Pricing and Evaluation: How will the pricing of Alternate Bid Item 1 be determined relative to the Base Bid? Is the proposed budget mentioned including the Add/Alt or is that an additional cost?
Alternate bid should be priced related to the deducts in total cost/dollar amount.
66. Will there be a discount or premium applied to both scopes?
No discounts will be applied.
67. Additionally, regarding price: what criteria will be used to evaluate bids, and will there be any preference given to bidders who submit both bids?
Pricing alongside responsiveness is the only factor in this acquisition.
68. Contractual Implications: If Alternate Bid Item 1 is selected, what are the potential changes to the contract terms and conditions, such as liquidated damages or performance guarantees regarding completion dates and the overall schedule?
Bid deduct is 115 days from NTP vs 125 days from NTP.
69. Several places in the Solicitation package call for a "Deduct Alternate 1". This deduct was explained quite clearly on the walkthrough and can be mathematically obtained; however, it is not clear to this contractor where this should be posted since Page 5 of 65 only has one Grand Total shown and no deducts. Should this be posted on the back page of the 1442? (i.e. Base Bid $425,000 Deduct $400,000) Please clarify.
Bid item 1 should be displayed as a total cost of the actual project with the deductions accounted for.
70. Drawing 4 of 19 (A-103) shows AP-46 in room 4206 but AP-45 and AP-04 show in hallway. Please clarify.
Response: The locations are as shown on the drawings.
71. Drawing A-111 has 11 drops shown that are in a current living quarter for residents that already has a working Wi- Fi system that we were able to verify as operational. Should these drops be included in pricing. Please clarify.
72. Drawing A-116 (821) Drawing designates 16 of 19 - it is 17 of 19. Question is that we are unable to tell distance between 2C-117 and 2C129 after it gets into the room as it appears to go up (or down) from 2C129. Since this is a deduct and needs to be calculated properly - Please advise.
Response: Please find revise drawing A-116 dated 2024.10.24. Please note there is a scale provided on each drawing sheet to assist in distance between locations as noted in construction drawings.
Bldg Floor Area Remarks
1 1 144
Contractor to verify pathway from IT closet 116 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4- 11/16” dual gang box situated horizontally at AP28 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
2 G To meet VA-ENT requirements move AP 1 to G081
Contractor to verify pathway from IT closet G036A to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP01 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
2 G G011
Contractor to verify pathway from IT closet G036A to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP35 location for room G011 containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
2 G G062
Contractor to verify pathway from IT closet G036A to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP36 location for room G011 containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
2 1 1D113A
Contractor to verify pathway from IT closet 1D113A to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP67 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
2 4 4072
Contractor to verify pathway from IT closet 4158 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4- 11/16” dual gang box situated horizontally at AP04 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
2 4 To meet VA-ENT requirements move AP 43 to Adjacent office 4013
Contractor to verify pathway from IT closet 4158 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4- 11/16” dual gang box situated horizontally at AP43 location for room containing hard ceiling. In area containing hard ceiling, conduit to corridor
2 4 4005
Contractor to verify pathway from IT closet 4158 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4- 11/16” dual gang box situated horizontally at AP45 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
2 4 4006
Contractor to verify pathway from IT closet 4158 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP46 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
3 G G001
Contractor to verify pathway from IT closet B3-F1-1112 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP09 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
3 G G037
Contractor to verify pathway from IT closet B3-F1-1112 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP10 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
3 G G017
Contractor to verify pathway from IT closet B3-F1-1112 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP20 location for room containing hard ceiling. In area containing hard ceiling, 3 G G046
Contractor to verify pathway from IT closet B3-F1-1112 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP23 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
3 4 4036
Contractor to verify pathway from IT closet 4045 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP37 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
3 4 4074
Contractor to verify pathway from IT closet 4045 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP41 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
3 4 4117
Contractor to verify pathway from IT closet 4045 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP42 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
3 4 4083
Contractor to verify pathway from IT closet 4045 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP43 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
3 4 4044
Contractor to verify pathway from IT closet 4045 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP45 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
3 4 4044
Contractor to verify pathway from IT closet 4045 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP47 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
4 G G031 Contractor to verify pathway from IT closet B4-F1-1097 on the first floor to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP23
4 1 1034
Contractor to verify pathway from IT closet 1036 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP36 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
5 1 1039
Contractor to verify pathway from IT closet 1017 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP33 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
6 1 1050
Contractor to verify pathway from IT closet 1032 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP40 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
7 1 1125
Contractor to verify pathway from IT closet 1045 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP25 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
7 1 1011
Contractor to verify pathway from IT closet 1045 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP26 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
13 1 106
Contractor to verify pathway from IT closet 102 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP09 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14E 1 116
Contractor to verify pathway from IT closet 119 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP01 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14E 1 101
Contractor to verify pathway from IT closet 119 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP02
14E 1 103
Contractor to verify pathway from IT closet 119 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP03 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14E 1 108
Contractor to verify pathway from IT closet 119 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP04 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14E 1 105
Contractor to verify pathway from IT closet 119 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP05 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14E 1 110
Contractor to verify pathway from IT closet 119 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP06 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14E 2 208
Contractor to verify pathway from IT closet 119 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP01 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14E 2 211
Contractor to verify pathway from IT closet 119 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP02 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14E 2 204
Contractor to verify pathway from IT closet 119 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP03 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14E 2 213
Contractor to verify pathway from IT closet 119 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP04
14W 1 102
Contractor to verify pathway from IT closet 111 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP02 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14W 1 107
Contractor to verify pathway from IT closet 111 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP03 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14W 1 108
Contractor to verify pathway from IT closet 111 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP04 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14W 1 112
Contractor to verify pathway from IT closet 111 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP05 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14W 1 104
Contractor to verify pathway from IT closet 111 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP06 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14W 1 110
Contractor to verify pathway from IT closet 111 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP07 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14W 2 208
Contractor to verify pathway from IT closet 111 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP01 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14W 2 210
Contractor to verify pathway from IT closet 111 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP02
14W 2 206
Contractor to verify pathway from IT closet 111 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP03 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14W 2 205
Contractor to verify pathway from IT closet 111 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP04 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14W 2 203
Contractor to verify pathway from IT closet 111 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP05 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14W 2 209
Contractor to verify pathway from IT closet 111 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP06 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
14W 2 205
Contractor to verify pathway from IT closet 111 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP09 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
16 1 113
Contractor to verify pathway from IT closet 116 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP07 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
17 1 108
Contractor to verify pathway from IT closet IT CLOSET to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP12 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
17 1 Below Wiring closet
Contractor to verify pathway from IT closet IT CLOSET to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP13
17 1 Inside cage area as indicated on drawings
Contractor to verify pathway from IT closet IT CLOSET to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP14 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
19 1 111
Contractor to verify pathway from IT closet 103 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP08 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
19 1 103
Contractor to verify pathway from IT closet 103 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP10 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
20 G Tunnels
Contractor to verify pathway from IT closet B20-F1-A101 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP02 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
20 G Tunnels
Contractor to verify pathway from IT closet B20-F1-A101 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP03 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
21 2 2B106
Contractor to verify pathway from IT closet 2B114 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP28 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
21 2 2C117
Contractor to verify pathway from IT closet 2C114 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP44 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
42 G BA112
Contractor to verify pathway from IT closet BC148 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP22
42 1 1C121
Contractor to verify pathway from IT closet 1C135 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP25 location for room containing hard ceiling. In area containing hard ceiling, conduit shall be provided as indicated on the drawings
42 1 1B132
Contractor to verify pathway from IT closet 1B103 to designed AP location, in open and hard ceiling area, Contractor shall provide and install 4-11/16” dual gang box situated horizontally at AP49