5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 04-10-2023 652-23-202 36C246 Department of Veterans Affairs Network Contracting Office 6 1201 Broad Rock Blvd Richmond VA 23249 36C246 Department of Veterans Affairs Network Contracting Office 6 1201 Broad Rock Blvd Richmond VA 23249 To all Offerors/Bidders
36C24623Q0479 03-23-2023
X X X Tuesday, April 25, 2023, at 4:00PM EST X The purpose of this amendment is to notify potential offerors responses to vendor questions, updates to the Statement of Work (SOW) and extension of the Quote submission due date.
A. Please review the questions and responses as listed, starting on Page 2 of this document. Updates to the SOW have been highlighted for ease of reference. Photos are included as well.
B. The Quo te submission date is now Tuesday, April 25, 2023, at 4:00PM EST.
All terms and conditions of the subject document in item 9A remain unchanged.
CONTINUATION PAGE
Questions and Answers – Solicitation 36C24623Q0479
Q1. For the Parking Lot Numbers, do you want them to be in the same size as they are now. If so, do you know their current size of the background and numbers? What specific alphabetical and numerical stickers are needed?
A. We cannot find the original specifications, but the requirement is to exactly MATCH the current 15 signs, four (4) stickers per pole and here is the current list:
| 1A (x2) | 6B |
| 2A | 6C |
| 3A | 7A |
| 4A | 7B |
| 5A | 9A |
| 5B | 10A |
| 6A | 11A |
Q2. The current signs have additional information not requested in the solicitation like: VA, Towing enforced etc. Do the new signs need to have the same information?
A. No, those towing signs were added after the original signs were placed and we do not have a current towing policy. Any new policy that is enacted will involve that towing company to be responsible for adding their signs to the new pole.
Q3. The background color for the Parking Lot signs is VA Blue. From the VA website I found VA Blue #0071bb. Is this the correct shade of blue?
A. The correct color is VA Blue – Pantone 541
Q4. What are the specific standards for signs and placement of signs?
A. We require that all signage follow DOT Standards. You will find with some of the placements of the current signs, it may not have been placed/posted by DOT Standards. All signs and placement of the signs for this project, must follow DOT Standards.
Q5. Per the SF1442, no offer guarantee is required, however payment and performance bonds are required. Please confirm.
A. No offer guarantee was required as this was not a sealed bid. Per the FAR, yes, Payment and Performance Bonds are required based on the estimated cost.
Q6. Possible moving and replacing of Handicaps signs.
A. There is a restriping project that will be going on at the same time this signage project. There may be a timeframe during the project that requires coordination of placing those Handicap signs with the project COR. If signage finishes before painting signs will be placed where the spaces will eventually be.
Q7. Can we get an updated SOW and pictures for of the current signs.
A. Yes. Please see amendment for an updated Statement of Work and photos to reference the ACOs sign needed, and the Parking Lot numbers.
Q8. Is there a specific finish these poles need, i.e., powder coated, flat, etc.?
A. Replace all road signage, mounting poles and hardware. Per SOW “New poles shall be 2” (inch) round, black in color and with a black cap and all hardware and brackets shall be non-rusting and non-streaking”. Finish shall be gloss black as to allow easy cleaning if necessary.
Q9. Is this the correct DOT Code we should follow for sign size?
A. All signs that are VA provided are interior signs only, the handicap and stop signs need to be DOT single lane correct.
Q10. Are we providing the poles for the Parking Lot Numbers?
A. No, those poles are not being replaced, just the stickers indicating the lot number on the existing poles.
Q11. What is the count for the number of poles for the signs listed under Section H. of the SOW?
A. There are 21 poles required for the signs listed in Section H. One of the ACOS signs needs to be replaced. The SOW will be updated to reflect that change to provide an accurate quote. Please refence attached photos showing what the sign looks like and where it will be placed.
Q12. How many signs are being replaced in Section H. of the SOW?
A. The signs are not being replaced, just the poles themselves as it states "VAMC signs that will need just the poles replaced with the new poles, caps and brackets." There is one exception, in that, the SOW shows an update that one (1) of the ACOS signs will need to be replaced. Also, there is an update with the VA Police signs. There will be seven (7) “POLICE PARKING ONLY” instead of the six in the original SOW.
Q13. Can we include the costs of samples in the proposal if there are costs to the samples.
A. This project does not require the approval of samples prior to submitting a quote. The Government will not reimburse or pay for any costs associated with submitting proposals. Therefore, those costs should not be included in the costs of the proposal. Samples, if required, are requested after the contract has been awarded.
Q14. Are we providing the poles for the Parking Lot Numbers?
A. No, those poles are not being replaced. We do require that any poles that are unused either metal or wood shall be removed and disposed with the rest of the rest of the old poles and signage.
Statement of Work Hunter Holmes McGuire VA Medical Center Richmond Virginia Project Name – 2022 Traffic Sign Replacement 652-22-202
Overview: Contractor shall provide all equipment, labor, materials, and supervision as necessary to replace, one for one, all current road signage following single lane DOT requirements on VAMC campus. This work is to comply with current DOT and VA standards for hospital construction and patient care.
Description of Work: Replace all road signage, mounting poles and hardware. New poles shall be 2” (inch) round, shiny black in color and with a black cap and all hardware and brackets shall be non-rusting and non-streaking. Work to be completed in accordance with local building codes and DOT regulations, if the old sign placement is not located correctly per DOT code ensure all new work in within code.
Areas of Work: VAMC Campus
General Requirements Items: The project design includes and the following items:
A. Stop
a. STOP
b. 37 signs
c. High intensity reflective sign
d. 10-year life – 3M warranty B. Handicap
a. HANDICAP PARKING ONLY
b. 201 signs
c. High intensity reflective sign
d. 10-year life – 3M warranty C. No Parking
a. NO PARKING – ANY TIME
b. 20 signs
c. High intensity reflective sign
d. 10-year life – 3M warranty
D. No Parking fire lane
a. NO PARKING – FIRE LANE
b. 100 signs
c. High intensity reflective sign
d. 10-year life – 3M warranty E. Police Parking
a. POLCE PARKING ONLY
b. 7 signs
c. High intensity reflective sign
d. 10-year life – 3M warranty F. Physician Parking
a. PHYSICIANS ONLY
b. 22 signs
c. High intensity reflective sign
d. 10-year life – 3M warranty G. Parking Lot Numbers
a. 15 light poles with 4 sets of stickers per sign per pole. See photos.
b. Background is VA Blue Pantone 541
c. Numbers shall be reflective white
d. High intensity reflective sign
e. The total number of stickers is 60 are as follows:
| 1A - 8 | 6B - 4 | |
| 2A - 4 | 6C - 4 | |
| 3A - 4 | 7A - 4 | |
| 4A - 4 | 7B - 4 | |
| 5A - 4 | 9A - 4 | |
| 5B - 4 | 10A - 4 | |
| 6A - 4 | 11A - 4 |
H. Other Parking signs
a. VAMC signs that will need just the poles replaced with the new poles, caps, and brackets. There are 21 poles required to be replaced.
b. These signs and the number of poles is: ACOS (3), Purple Heart (1), SARRTP (2), UNION (3) and Volunteer (12) signs.
c. One ACOS sign will need to be made while the other five are existing. There are two signs per pole.
Completion Time: Construction Period of Performance (PoP) is anticipated to take ninety (90) days after the notice to proceed. This includes lead time for special order signs and stickers.
Additional notes:
Contractor is responsible for verifying underground hazards!
Contractor shall field verify all measurements, material quantities, and site conditions prior to submitting a bid.
· Any conditions that impact pricing and are not readily verified during site visit shall be addressed during solicitation RFI process. Existing conditions that need clarification to be included in the bid are the sole responsibility of the contractor making the bid. No assumptions of existing conditions shall be made by the contractor. The Contractor must submit questions, or the existing condition shall be corrected at the Contractor's expense.
Provide cut sheets for all finish materials depicting actual texture samples for approval. Contractor shall provide electronic copies of each submittal with a separate transmittal sheet to each requirement. If applicable, submittals shall indicate the manufacturer’s full range of available colors, and from these, the COR will request full size samples for final color selection.
Contractor shall coordinate with COR for waste removal. All waste shall be removed at the end of each day. Contractor shall remove and dispose of waste in accordance with all legal and VA Specification 01 74 19 Construction Waste Management. (www.cfm.va.gov/til/spec/017419.doc)
Contractor shall store all materials in approved lay down area. Contractor shall coordinate delivery, storage, and handling of all materials with the COR to designated prepared areas to minimize site storage time, impact to the hospital, and potential damage to stored materials.
Contractor shall follow all parking requirements specified in the general requirements as well as allowing no personal owned vehicles (POV) on job site, all contractor vehicles will be clearly marked with a company logo either on the vehicle or on the dashboard visible from 15 feet. Workers can park in the employee parking lot if not using company vehicles to arrive at job site.
See attached document: RFI Photos.
(End of Statement of Work)