Questions and Answers

1. Location of coil? (First floor, 2nd floor, roof penthouse, etc..)

Answer: Building 500 2nd Floor 2A 145

2. Any pictures of the coil would be beneficial for piping and installation ?

Answer: No Pictures are currently available.

3. Regarding the Specific tasks mentioned in the solicitation, we have following questions in parenthesis-

I. Removal of existing steam pre-heat coil (Need to know location?)

Answer: Building 500 2nd floor Rm 2A 145

II. Add valves, strainers, piping, accordingly (Need to know how many and length of piping needed?)

Answer: Do not have current piping sizes or length piping available, current heater rental obstructing access panel to heating coil.

III. Tap into existing future tap (Where is the future tap located from the coil?)

Answer: The heating coil will be installed into existing HVAC equipment.

IV. All fabrication required (Where is the fabrication being referenced?)

Answer: Piping, condensate return, steam trap, control valve actuator.

V. (5) Tie into existing freeze thermostat control and valve actuator (Need to know location of existing freeze thermostat and actuator?)

Answer: Building 500 2nd floor Rm 2A 145