This document provides responses to vendor questions on solicitation number 36C24623B0063 to replace and add new pavement and walks at a Veterans Affairs medical center. The project involves removing damaged pavement sections and replacing with a minimum 18-inch CLSM layer and up to 2 inches of asphalt surface course. Standard sidewalks will replace pavers and stamped concrete. Existing wheel stops will be reused. The asphalt mill and overlay depth will be a minimum of 2 inches throughout. The superintendent may serve as either the quality control manager or safety and health officer, but not both roles simultaneously. Staging and parking will be allowed in employee areas only. Off-hours work may be required for certain trades. Guardrail details are provided on sheet A-101 and utility details are on sheet U-102.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24623B0063 0003.docx | DOCX document | |
| S07 - BID OPENING Abstract 36C24623B0063.pdf | ||
| 36C24623B0063 0002.docx | DOCX document | |
| Response to RFI 659-24-906_2-G-102_v2_082923.pdf | ||
| Updated SPECIFICATIONS Pavement.pdf | ||
| 36C24623B0063.pdf | ||
| 659-24-906 Combined Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 36C24623B0063 659-23-2-6049-0163 659-24-906 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 To all Offerors/Bidders
36C24623B0063 08-29-2023
X X X
The purpose of this amendment is to provide answers to vendor submitted RFIs.
There is no change to the original Bid Opening date.
Sealed Bid Opening Scheduled for September 6, 2023
10:00 AM EST
Please acknowledge this and any other amendments in Block 19 of the SF 1442 of your submitted Bid.
Daniel Dove 36C24623B0063 SBY VAMC Replace Pavement & Sidewalks - RFIs
· At the areas with pavers/stamped concrete sidewalks, are we to replace those with standard sidewalk or match back existing? If the latter, is stamped concrete OR pavers acceptable?
· These should be replaced with standard sidewalks.
· At the area shown below, there are wheel stops at the mill and pave area clouded. Are we to assume replacing with new wheel stops?
· Reuse existed stops
· The portion of the lot clouded below looks in bad shape, however, is not noted for replacement. In its current condition and with the heavy traffic loads, it probably will not hold up. Is there anything we need to provide here as an alternate?
· The hatch area at the end of the parking lot is to paved and striped.
· The solicitation states that the project duration is 240 calendar days, however the scope of work on cover sheet G-101 also states 210 calendar days. Please confirm the duration.
· 240 days is the duration.
· Please confirm, for bidding purposes, that the asphalt mill and overlay depth will be 2” minimum throughout.
REMOVE EXISTING DAMAGED PAVEMENT SECTION AND REPLACE A MIN 18" CLSM WITH MAX 2" OF ASPHALT SURFACE COURSE.
· On sheet G-102, some of the colors shown on the legend are similar and it is difficult to discern exactly which condition should be applied to which area. Can you confirm the locations for the three items: Asphalt – Road Works-Parking Lot, Subbase – Repair with Flowable Fill, and Asphalt – Parking – Parking Striping? See 659-24-906_2-G-102_v2_082923
· On sheet G-102, General Note A. states that we are to coordinate with COR on which sections of sidewalk to remove, however there are locations clearly identified on the scaled drawing. As well, there are two different legends being used for new sidewalk and sidewalk replacement. Can this drawing be updated to show a unified scope of work for new and replacement sidewalk? 659-24-906_2-G-102_v2_082923
· Please confirm the locations where the Type 1 and Type 3 Utility Trench Patches are to be utilized. Type 1
· Drawing U-102 shows all existing utility locations, as well as elevations for the “Tunnel”. Is it possible to get elevations on any of the other utilities shown?
· Utility elevation are below 18” as a standard.
· Given the relatively limited scope of this project, is it possible for the superintendent to also serve as SSHO and QCM?
· The Super may serve as one or the other, not both
· Is this a tax-exempt project?
· If tax-exempt, will the government be providing a tax-exempt certificate to the Prime Contractor for use by subcontractors and vendors? See FAR Clause 52.229-2, “North Carolina State and Local Sales and Use Tax” & 52.229-3, “Federal, State, and Local Taxes”
· Can the Superintendent be shared across multiple projects, or should they be dedicated full-time to this project and this project only? No.
· Can the Superintendent fulfil multiple roles? The Super can only be assigned one project.
· If so, can they also fulfil the Quality Control role?
· What about the SSHO role?
· The Super may fulfill one of the two roles, but not both.
· Will the VA provide a spot for the Prime Contractor to set up a temp office?
· Or should contractors include monies for a temp office, utilities, etc.? (We ask this because we know the VA has very little spare real estate). On a project this size, need for office is not required. However, a temp office location is permissible. Electric can be tapped, water and sewer is to be portable.
· Will staging and/ or parking be an issue for this project?
· Contractor will be allowed to park in employee park areas only of area of work.
· Does the VA anticipate this project will require off hours work?
· If so, what trades or scopes will be required to perform off hours work?
· This is answered on G-102
· Where is the guardrail details on the sidewalk plans and please confirm the guardrail material?
· This is answered on A-101
· Where are the utility details provided for new pavement and sidewalks?
· This is sheet U-102
See attached document: Response to RFI 659-24-906_2-G-102_v2_082923.