This document outlines the statement of work for a federal construction contract opportunity with the Department of Veterans Affairs to improve finishes in the basement corridors of Building 2 at the Salisbury VA Medical Center in Salisbury, North Carolina. The contractor will provide all labor, materials, tools, equipment, supervision, and construction services to complete demolition, wall repair, skim coating, plaster work, painting, and installation of wall protections, handrails, bumper guards, and epoxy flooring. The work must be performed after normal hospital hours and be completed within 225 calendar days of receiving notice to proceed. The contract includes four bid items with deductive alternates that remove certain scope items. The contractor must adhere to safety, infection control, and inspection requirements and properly clean and secure the work site upon completion.

View the file

Other files

File Type Posted
36C24623B0029 0004.docx DOCX document
36C24623B0029 0003.docx DOCX document
Pre-Bid RFI Q_Answers.docx DOCX document
P09 Final SOW 659-24-905 Improve Finishes Basement B2.pdf PDF
36C24623B0029 0002.docx DOCX document
36C24623B0029 0001.docx DOCX document
659-24-905 Improve Finishes Basement B2 Combined Drawings.pdf PDF
BASEMENT HALLWAY IMAGES.docx DOCX document
36C24623B0029_1.docx DOCX document
Specifications 659-24-905 Improve Finishes Basement B2 Combined Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF BID ITEM(S)

BID ITEM I (Base): The contractor awarded this project is to provide all labor, materials, tools, equipment, transportation, qualified supervision, and all aspects of construction described herein. This is to also include other specific tasks as further defined in the Statement of Work, project drawings and specifications associated with this request for Bid. The work includes, but not limited to demolition, wall repair, skim coating/plaster works, painting, and installation of wall protection, handrails/bumpers guards and epoxy flooring. All trash and debris shall be removed from area in accordance with contract documents and all construction work is to be performed in accordance with local building code, specifications, and contract documents. All work shall be performed after normal hospital working hours. The corridors will remain clear of all materials and tools during normal working hours. All work, including final cleanup and completion of any punch list items, shall be performed within two hundred and twenty-five (225) calendar days of receipt of the Notice to Proceed.

All work shall be scheduled for non-regular hours unless coordinated with the COR. Regular hours at the VAMC Salisbury – Monday - Friday, 7:30am – 4:30pm.

BID ITEM II (DEDUCT ALTERNATE NO. 1) – Perform all work described in BID Item I, above except DELETE work associated with Deduct Alternate No. 1 with deleting the requirement of providing and installing bumper guards (WG1). All work, including final cleanup and completion of any punch list items, shall be performed within two hundred (200) calendar days of receipt of the Notice to Proceed. Work shall be performed in strict accordance with specifications and drawings.

BID ITEM III (DEDUCT ALTERNATE NO. 2) – Perform all work described in BID Item II, above except DELETE work associated with Deduct Alternate No. 2 which is deleting the requirement to paint all hollow metal doors and frames. This is removing General Notes 1, 2, 3 and 4 on plan page G-102. All work, including final cleanup and completion of any punch list items, shall be performed within one hundred and ninety (190) calendar days of receipt of the Notice to Proceed. Work shall be performed in strict accordance with specifications and drawings.

BID ITEM IV (DEDUCT ALTERNATE NO. 3) – Perform all work described in BID Item III, above except DELETE work associated with Deduct Alternate No. 2 which is deleting the requirement to provide new handrails (HR). All work, including final cleanup and completion of any punch list items, shall be performed within one hundred and eighty (180) calendar days of receipt of the Notice to Proceed. Work shall be performed in strict accordance with specifications and drawings.