This document provides details of a federal contract opportunity to upgrade IT systems infrastructure at a Department of Veterans Affairs medical center. The solicitation will provide for construction services including installation of new underground duct banks, outdoor cabinets, fiber optic cabling and related components. The work will be performed at the Hampton VA Medical Center in Hampton, Virginia. The opportunity is anticipated as a Service-Disabled Veteran Owned Small Business set-aside with a magnitude between $2 million to $3 million. The solicitation is expected to be released on or around March 1, 2022, with proposals due approximately 38 days later. Interested vendors should monitor the website for additional details and amendments.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 - 36C24622R0025 0002.docx | DOCX document | |
| Amend 2 Attachment C - Past Performance Questionnaire.docx | DOCX document | |
| 36C24622R0025 0001.docx | DOCX document | |
| Attachment B - Corp Experience Form.docx | DOCX document | |
| Attachment A - Base Proposal Item Price Breakdown.xlsx | XLSX spreadsheet | |
| S02 - 36C24622R0025_1.docx | DOCX document | |
| Upgrade IT Systems Infrastructure - Revised Specifications.pdf | ||
| Construction Safety Handbook.pdf | ||
| 36C24622R0025.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPROVAL SIGNATURES:
COR - ILSM & ICRA DATE:
REVIEWED: AFGE DATE:
REVIEWED: NAGE DATE:
APPROVED: INFECTION CONTROL DATE:
APPROVED: CONSTRUCTION SAFETY MANAGER DATE:
APPROVED: SAFETY MANAGER DATE:
APPROVED: INDUSTRIAL HYGIENIST DATE:
APPROVED: INDUSTRIAL HYGIENIST DATE:
APPROVED: FIRE INSPECTOR DATE:
APPROVED: SUPERVISORY FACILITIES OPERATIONS SPECIALIST DATE:
APPROVED: CHIEF, POLICE & SECURITY DATE:
APPROVED: PHYSICAL SECURITY SPECIALIST DATE:
APPROVED: ENVIRONMENTAL MANAGEMENT SERVICE DATE:
APPROVED: OFFICE OF INFORMATION & TECHNOLOGY DATE:
APPROVED: WOMEN'S VETERAN PROGRAM MANAGER DATE:
APPROVED: CONTRACTING DATE:
APPROVED: PATIENT SAFETY MANAGER DATE:
APPROVED: HAMPTON ENERGY MANAGER DATE:
APPROVED: SUPERVISORY PROJECT ENGINEER DATE:
APPROVED: ASSISTANT CHIEF, ENGINEERING DATE:
APPROVED: CHIEF, ENGINEERING DATE:
APPROVED: ASSOCIATE DIRECTOR FOR PATIENT CARE SERVICES DATE:
APPROVED: CHIEF OF STAFF DATE:
APPROVED: ASSOCIATE DIRECTOR FOR OPERATIONS DATE:
APPROVED: EXECUTIVE DIRECTOR, HAMPTON VA MEDICAL CENTER DATE:
PROJECT SITE
PROJECT LOCATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
B
IM
/0
U p g ra d e
I T
S y s te m s I n fr a s tr u c tu re /0
U p g ra d e I T
S y s te m s I n fr a s tr u c tu re
R
.r v t
/1 /2
:1
:5
P
M
G-001
COVER SHEET UPGRADE IT SYSTEMS
INFRASTRUCTURE
HAMPTON VAMC
590-19-115
11/26/2021 JFR CVMJOHN F. RAINE, P.E.
VA License #61342 Sheet 1 OF 88
UPGRADE IT SYSTEMS
INFRASTRUCTURE
AT VAMC HAMPTON
100 EMANCIPATION DRIVE, HAMPTON, VA 23667
PROJECT # 590-19-115
100% CONSTRUCTION DOCUMENTS
INDEX OF DRAWINGS
DWG NO. DRAWING TITLE
SHEET
NUMBER
GC-501 E & S CONTROLS DETAILS 47
T-001 TELECOM LEGEND AND ABBREVIATIONS 48
T-101 TELECOM - QUADRANT PLAN 49
T-210 BLDG 135 GROUND FLOOR - FIBER OPTIC ROUTING 50
T-211 BLDG 135 FIRST FLOOR - FIBER OPTIC ROUTING 51
T-220 BLDG 168 GROUND FLOOR - FIBER OPTIC ROUTING 52
T-230A BLDG 110 GROUND FLOOR A - FIBER OPTIC ROUTING 53
T-230B BLDG 110 GROUND FLOOR B - FIBER OPTIC ROUTING 54
T-231A BLDG 110 FIRST FLOOR A - FIBER OPTIC ROUTING 55
T-231B BLDG 110 FIRST FLOOR B - FIBER OPTIC ROUTING 56
T-232A BLDG 110 SECOND FLOOR A - FIBER OPTIC ROUTING 57
T-232B BLDG 110 SECOND FLOOR B - FIBER OPTIC ROUTING 58
T-233A BLDG 110 THIRD FLOOR A - FIBER OPTIC ROUTING 59
T-233B BLDG 110 THIRD FLOOR B - FIBER OPTIC ROUTING 60
T-234A BLDG 110 FOURTH FLOOR A - FIBER OPTIC ROUTING 61
T-234B BLDG 110 FOURTH FLOOR B - FIBER OPTIC ROUTING 62
T-235 BLDG 110 FIFTH FLOOR - FIBER OPTIC ROUTING 63
T-236 BLDG 110 SIXTH FLOOR - FIBER OPTIC ROUTING 64
T-240 BLDG 110A GROUND FLOOR - FIBER OPTIC ROUTING 65
T-241 BLDG 110A FIRST FLOOR - FIBER OPTIC ROUTING 66
T-242 BLDG 110A SECOND FLOOR - FIBER OPTIC ROUTING 67
T-243 BLDG 110A THIRD FLOOR - FIBER OPTIC ROUTING 68
T-250A BLDG 110B GROUND FLOOR A - FIBER OPTIC ROUTING 69
T-250B BLDG 110B GROUND FLOOR B - FIBER OPTIC ROUTING 70
T-250C BLDG 110B GROUND FLOOR C - FIBER OPTIC ROUTING 71
T-250D BLDG 110B GROUND FLOOR D - FIBER OPTIC ROUTING 72
T-251A BLDG 110B SECOND FLOOR A - FIBER OPTIC ROUTING 73
T-251C BLDG 110B SECOND FLOOR C - FIBER OPTIC ROUTING 74
T-251D BLDG 110B SECOND FLOOR D - FIBER OPTIC ROUTING 75
T-252 BLDG 110B THIRD FLOOR - FIBER OPTIC ROUTING 76
T-260A BLDG 137 GROUND FLOOR A - FIBER OPTIC ROUTING 77
T-260B BLDG 137 GROUND FLOOR B - FIBER OPTIC ROUTING 78
T-260C BLDG 137 GROUND FLOOR C - FIBER OPTIC ROUTING 79
T-260D BLDG 137 GROUND FLOOR D - FIBER OPTIC ROUTING 80
T-270 BLDG 144 GROUND FLOOR - FIBER OPTIC ROUTING 81
T-271 BLDG 144 FIRST FLOOR - FIBER OPTIC ROUTING 82
T-280 BLDG 116 GROUND FLOOR - FIBER OPTIC ROUTING 83
T-290A BLDG 146 GROUND FLOOR A - FIBER OPTIC ROUTING 84
T-290B BLDG 146 GROUND FLOOR B - FIBER OPTIC ROUTING 85
T-300 BLDG 138A GROUND FLOOR - FIBER OPTIC ROUTING 86
T-601 TELECOM - DIAGRAM 87
T-701 CABLE DISTRIBUTION SCHEDULE AND DETAILS 88
INDEX OF DRAWINGS
DWG NO. DRAWING TITLE
SHEET
NUMBER
G-001 COVER SHEET 1
G-002 SYMBOLS AND ABBREVIATIONS 2
G-003 SITE PLAN 3
AE-210 BLDG 135 GROUND FLOOR 4
AE-211 BLDG 135 FIRST FLOOR 5
AE-220 BLDG 168 GROUND FLOOR 6
AE-230A BLDG 110 GROUND FLOOR A 7
AE-230B BLDG 110 GROUND FLOOR B 8
AE-231A BLDG 110 FIRST FLOOR A 9
AE-231B BLDG 110 FIRST FLOOR B 10
AE-232A BLDG 110 SECOND FLOOR A 11
AE-232B BLDG 110 SECOND FLOOR B 12
AE-233A BLDG 110 THIRD FLOOR A 13
AE-233B BLDG 110 THIRD FLOOR B 14
AE-234A BLDG 110 FOURTH FLOOR A 15
AE-234B BLDG 110 FOURTH FLOOR B 16
AE-235 BLDG 110 FIFTH FLOOR 17
AE-236 BLDG 110 SIXTH FLOOR 18
AE-240 BLDG 110A GROUND FLOOR 19
AE-241 BLDG 110A FIRST FLOOR 20
AE-242 BLDG 110A SECOND FLOOR 21
AE-243 BLDG 110A THIRD FLOOR 22
AE-250A BLDG 110B GROUND FLOOR A 23
AE-250B BLDG 110B GROUND FLOOR B 24
AE-250C BLDG 110B GROUND FLOOR C 25
AE-250D BLDG 110B GROUND FLOOR D 26
AE-251A BLDG 110B SECOND FLOOR A 27
AE-251C BLDG 110B SECOND FLOOR C 28
AE-251D BLDG 110B SECOND FLOOR D 29
AE-252 BLDG 110B THIRD FLOOR 30
AE-260A BLDG 137 GROUND FLOOR A 31
AE-260B BLDG 137 GROUND FLOOR B 32
AE-260C BLDG 137 GROUND FLOOR C 33
AE-260D BLDG 137 GROUND FLOOR D 34
AE-270 BLDG 144 GROUND FLOOR 35
AE-271 BLDG 144 FIRST FLOOR 36
AE-280 BLDG 116 GROUND FLOOR 37
AE-290A BLDG 146 GROUND FLOOR A 38
AE-290B BLDG 146 GROUND FLOOR B 39
AE-300 BLDG 138A GROUND FLOOR 40
AE-501 MISCELLANEOUS DETAILS 41
GI-100 GENERAL NOTES 42
CD-101 EXISTING CONDITIONS - DEMOLITION PLAN 43
CU-101 SITE UTILITY PLAN AND PROFILE 44
CU-501 SITE UTILITY AND CONSTRUCTION DETAILS 45
GC-101 EROSION AND SEDIMENT CONTROL PLAN 46
P R
O F
E S
S IO N A L E N
G
I N E
E R
JOHN FREDERICK
RAINE
Lic. No. 61342
C O
M M
O
N W
EA L T H O F
V
I R G
I N
I A
Revisions: Date:
NOTE: REFER TO STRUCTURAL, MECHANICAL,
AND/OR ELECTRICAL DRAWINGS FOR
ABBREVIATIONS SPECIFIC TO EACH DISCIPLINE.
AB ANCHOR BOLT, AUGER BORING
ABI ALTERNATE BID ITEM
AC ACOUSTIC AIR CONDITIONING, ASPHALTIC CONCRETE
AD ACCESS DOOR
ADD ALT ADDITIVE ALTERNATE
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
AP ACCESS PANEL
APC ACOUSTIC PANEL CEILING
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASB ASBESTOS
ASPH ASPHALT
AUTO AUTOMATIC
AWP ACOUSTIC WALL PANEL
BDRM BEDROOM
BIT. CONC BITUMINOUS CONCRETE
BJ BAR JOIST
BLDG BUILDING
BLK BLOCK
BM BEAM, BENCHMARK
BOT BOTTOM
BRD BOARD
BRG BEARING
BS BOTTOM OF STEP
BSMT BASEMENT
BTWN BETWEEN
BW BOTTOM OF WALL
CAB CABINET
CAP CAPACITY
CC CENTER TO CENTER
CEM CEMENT
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIR CIRCULATING
CJ CONSTRUCTION JOINT, CONTROL JOINT
CLG CEILING
CLO CLOSET
CLR CLEAR
CENTERLINE
CMU CONCRETE MASONRY UNITS
CMU G1 GLAZED CMU, ONE SIDE
CMU G2 GLAZED CMU, TWO SIDES
CO CLEANOUT
COL COLUMN
COMP'T COMPARTMENT
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CS/CI CONTRACTOR SUPPLIED/ CONTRACTOR INSTALLED
CS/OI CONTRACTOR SUPPLIED/OWNER INSTALLED
CSK COUNTER SUNK
CT CERAMIC TILE
CTE CONNECT TO EXISTING
CTR CENTER
CUH CABINET UNIT HEATER
Ø DIAMETER
DF DRINKING FOUNTAIN
DFD DOOR FRAME DIMENSION
DH DOUBLE HUNG
DIA DIAMETER
DIM DIMENSION
DN DOWN
DTL DETAIL
DWG DRAWING
E EAST
EA EACH
EL, ELEV ELEVATION
ELEC ELECTRIC
EMERG EMERGENCY
EPS EXTRUDED POLYSTYRENE
EQ EQUAL
EQUIP EQUIPMENT
ETC ETCETERA
EW EACH WAY
EXIST EXISTING
EXP EXPANSION, EXPOSED
EXP JT EXPANSION JOINT
EXT EXTERIOR
FBO FURNISHED BY OTHERS
FCO FLOOR CLEAN-OUT
FD FLOOR DRAIN, FOOTING DRAIN
FE FIRE EXTINGUISHER
FF FINISH FLOOR
FFE FINISHED FLOOR ELEVATION
FG FINISH GRADE, FIBERGLASS
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH
FO FUEL OIL
FOF FACE OF FOUNDATION
FOR FUEL OIL RETURN
FOS FACE OF STUD, FUEL OIL SUPPLY
FOUND FOUNDATION
FP FIREPROOF
FR FRAME, FIRE RETARDANT
FRT FIRE RETARDANT TREATED
FS FLOOR SINK
FT FOOT, FEET, FINNED TUBE
FTG FOOTING
FWP FABRIC WALL PANEL
QT QUARRY TILE
R RADIUS, RISER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN, ROAD
RECEP RECEPTACLE
REF REFRIGERATOR
REINF REINFORCEMENT
REQ'D REQUIRED
REV REVISION
RF RESINOUS FLOOR
RL RAIN LEADER
RM ROOM
RO ROUGH OPENING
RS RESILIENT STAIR ACCESSORY
RT RUBBER TILE
S SOUTH
S DISP SOAP DISPENSER
S&V STAIN AND VARNISH
SCONC SEALED CONCRETE
SCWD SOLID CORE WOOD DOOR
SCH, SCHED SCHEDULE
SCR SUPPLY CEILING REGISTER
SECT SECTION
SF SQUARE FEET
SH SINGLE HUNG
SHT SHEET
SIM SIMILAR
SL SLOPE
SPECS SPECIFICATIONS
SQ SQUARE
SQ FT SQUARE FEET
SS SERVICE SINK, SANITARY SEWER, STAINLESS STEEL
SSURFACE SOLID SURFACE
ST STREET
STA STATION
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUP SUPPORT
SUSP SUSPEND
SV SHEET VINYL
SYM SYMMETRICAL
T TOP, TANGENT, THERMOMETER
TB TACK BOARD
TBA TOILET BATH ACCESSORIES
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
T.O.C. TOP OF CONCRETE
T.O.M. TOP OF MASONRY
T.O.S. TOP OF STEEL
T.O.W. TOP OF WALL
TEL TELEPHONE
TEMP TEMPERATURE, TEMPORARY
TERM TERMINAL
THK THICK
THRU THROUGH
TLT TOILET
TP TOILET PARTITION
TPH TOILET PAPER HOLDER
TRAN TRANSOM
TS TOP OF STEP, TOP OF SILL
TV TELEVISION
TYP TYPICAL
TYPE "X" UL APPROVED GWB
U&D UP AND DOWN
UC UNDERCUT
UNO UNLESS NOTED OTHERWISE
UV UNIT VENTILATOR
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
W WEST
WAIN WAINSCOT
WB RESILIENT WALL BASE
WC WALL COVERING
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WIDTH, WINDOW DIMENSION, WOOD
WGL WIRE GLASS
WP WATERPROOF, WEATHERPROOF
WS WEATHERSTRIPPING
WT WEIGHT
WW WELDED WIRE FABRIC
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GF/GI GOVT. FURNISHED/GOVT. INSTALLED
GF/CI GOVT. FURNISHED/CONTRACTOR INSTALLED
GI GALVANIZED IRON
GOV'T GOVERNMENT
GPM GALLONS PER MINUTE
GR GRADE
GRAN GRANULAR
GRD GROUND
GWB GYPSUM WALLBOARD
GYP GYPSUM
HGT HEIGHT
H&V HEATING AND VENTILATING
HB HOSE BIB
HC HANDICAPPED
HCWD HOLLOW CORE WOOD DOOR
HDC HANDICAPPED
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
IN INSIDE DIAMETER
INCL INCLUSIVE
INFO INFORMATION
INSUL INSULATION, INSULATED
INT INTERIOR
IWP IMPACT RESISTANT WALL PROTECTION
JAN JANITOR CLOSET
JCT JUNCTION
KV KILOVOLT
KW KILOWATT
LAB LABORATORY
LAV LAVATORY
LBS POUNDS
LF LINEAR FEET
LFC LINOLEUM FLOOR COVERING
LGR LEDGER
LP LOW POINT
LR LIVING ROOM
LT LIGHT
LWC LIGHT WEIGHT CONCRETE
LVL LAMINATED VENEER LUMBER
MACH MACHINE
MANUF MANUFACTURER
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MB MARKER BOARD
MC MEDICINE CABINET
MCB METAL CORNER BEAD
MECH MECHANICAL
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MM MILLIMETER
MO MASONRY OPENING
MR MOISTURE RESISTANT
MS METAL STRIP
MTD MOUNTED
MTL METAL
N NORTH
N.I.C. NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVER ALL
OB GL OBSCURE GLASS
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OS/CI OWNER SUPPLIED/CONTRACTOR INSTALLED
OS/OI OWNER SUPPLIED/OWNER INSTALLED
OVHD, OH OVERHEAD
P-1 PLUMBING FIXTURE TYPE
PART PARTITION
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLAST PLASTIC
PLYWD PLYWOOD
PNL PANEL
PNTD PAINTED
POL POLISHED
PRELIM PRELIMINARY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, POINT, PRESSURE TREATED
PT DISP PAPER TOWEL DISPENSER
PVC POLY VINYL CHLORIDE
PVMT PAVEMENT
SCALE: 1/8" = 1'-0"
4' 8'0 16'
B3
D
C
B
A
SHEET NUMBER DETAIL
IS DRAWN ON
ROOM NAME
ROOM NUMBER
BREAK LINE
GRAPHIC SCALE
REVISION NUMBER
REVISION CLOUD
ELEVATION MARKER - SECTION
ELEVATION MARKER - PLAN
DOOR
NUMBER
REFERENCE
WINDOW TYPE REFERENCE
WALL TYPE REFERENCE
COLUMN GRID REFERENCE
SHEET NUMBER ELEVATION
IS DRAWN ON
INTERIOR ELEVATION
REFERENCE
BUILDING / WALL / DETAIL
SECTION NUMBER
SHEET NUMBER BUILDING /
WALL / DETAIL SECTION IS
DRAWN ON
BUILDING ELEVATION
NUMBER
SHEET NUMBER
ELEVATION IS DRAWN ON
DETAIL NUMBER
SYMBOLS
STEEL & OTHER METAL PATTERN
SCOPE OF WORK AREA
STONE CUT PATTERN
TERRA COTTA
CARPET AND PAD PATTERN
TILE, ACOUSTICAL
CEILING PATTERN
WOOD FLOORING PATTERN
BRICK PATTERN, GLAZED
SAND CLAY GRAVEL PATTERN
BRICK PATTERN
EROSION AND
SEDIMENTATION
CONTROL,
FILTRATION BED PATTERN
EARTHWORK GRAVEL
PATTERN, POROUS
FILL
EARTHWORK ROCK PATTERN
EARTHWORK PATTERN,
COMPACTED FILL
PATTERN
RIPRAP PATTERN
SAND PATTERN
GLASS ELEVATION PATTERN
GYPSUM BOARD FINISH PATTERN
SEALANT AND BACKER ROD
INSULATION,
RIGID
BOARD PATTERN
INSULATION,
LOOSE
FILL PATTERN
WOOD FINISH PATTERN
PARTICLE BOARD PATTERN
ORIENTED STRAND BOARD PATTERN
WOOD, GLUED-LAMINATED PATTERN
WOOD FRAMING,
CONTINUOUS
PATTERN
WOOD BLOCKING OR SHIM PATTERN
HATCH PATTERNS
EARTH, UNDISTURBED PATTERN
EARTH, CRUSHED
ROCK
GRAVEL PATTERN
EARTH, CRUSHED
ROCK
GRAVEL PATTERN
PLYWOOD PATTERN
10'-0"
Room name
B
M2
A101
SIM
CONCRETE POURED IN
PLACE, PRECAST
ALUMINUM PATTERN
ASPHALT SHINGLE PATTERN
KEYNOTE TAG
A101
1 1
A1
AE101
GENERAL SAFETY NOTES:
1. COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS. INSTALL
CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF
NORMAL WORK HOURS. USE OF TEMPORARY WALL TYPE SYSTEM
RECOMMENDED.
2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
3. EXHAUST HOSES REQUIRED: HEAVY DUTY, FLEXIBLE STEEL REINFORCED;
VENTILATION BLOWER HOSE.
4. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO
THE OCCUPIED MEDICAL CENTER AT THE END OF EACH WORKDAY. VACUUM
SHALL UTILIZE HEPA FILTRATION. MAINTAIN SURROUNDING AREA FREQUENTLY.
5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
6. UPON COMPLETION:
A. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED
PROJECT IS INSPECTED BY THE COR AND THOROUGHLY CLEANED BY
THE VA ENVIRONMENTAL SERVICES DEPARTMENT.
B. REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION
CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL WORK HOURS.
C. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
D. WET MOP AREA WITH CLEANER/DISINFECTANT.
E. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS
PERFORMED.
7. ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS
FROM THE CONSTRUCTION AREA TO THE OCCUPIED AREA. PROVIDE MINIMUM
SIZE MATS OF 24 INCHES BY 36 INCHES. THESE MATS SHALL BE CHANGED AS
OFTEN AS REQUIRED TO MAINTAIN CLEAN WORK AREAS DIRECTLY OUTSIDE
CONSTRUCTION AREA AT ALL TIMES.
8. MAINTAIN NEGATIVE PRESSURE, 0.01 INCHES OF WATER GAUGE WITHIN WORK
SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY
MONITORED WITH DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT,
WHICH MUST BE CALIBRATED ON INSTALLATION, MAINTAINED WITH PERIODIC
CALIBRATION AND MONITORED BY THE CONTRACTOR.
9. SPRINKLER AND FIRE ALARM TO REMAIN ACTIVE THROUGHOUT PROJECT.
TEMPORARY PROTECTION MUST BE PROVIDED IF FIRE ALARM SYSTEM IS DOWN
FOR MORE THAN 8 HRS., OR SPRINKLER SYSTEM IS DOWN FOR MORE THAN 10
HOURS.
10. ALL CEILING TILES TO BE REPLACED BY THE END OF EACH WORK SHIFT TO
PREVENT AN IMPACT ON SPRINKLER SYSTEM DUE TO MISSING TILES.
GENERAL NOTES:
1. SEE LIFE SAFETY LINE TYPES ON SHEET G-002 FOR TEMPORARY PARTITION
TYPES.
2. REFER TO G-002 SHEET FOR ALL ABBREVIATIONS, SYMBOLS AND GENERAL
NOTES.
3. REFER TO ALL DRAWINGS INCLUDING ARCHITECTURAL, CIVIL AND ELECTRICAL
DRAWINGS FOR ADDITIONAL GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS.
4. G.C. TO PROVIDE & INSTALL ALL IN-WALL OR IN-CEILING BLOCKING / BRACING AS
REQUIRED FOR ALL EQUIPMENT AND ACCESSORIES WHETHER ITEMS ARE BY G.C.
OR OTHERS, COORDINATE WITH OWNER.
5. ALL INTERIOR DIMENSIONS SHOWN ARE TO FACE OF FRAMING UNLESS
SPECIFICALLY NOTED OTHERWISE.
6. REFER TO SHEET G-002 FOR CODE COMPLIANCE, CODE REFERENCE
INFORMATION. FIRE RATED PARTITIONS ARE SHOWN ON PLAN SHEETS. ALL
PENETRATIONS THROUGH FIRE RATED CONSTRUCTION SHALL BE SLEEVED, FIRE
SAFED AND / OR HAVE FIRE DAMPERS EQUIVALENT TO THE HOURLY FIRE RATING
OF THE CONSTRUCTION.
7. ALL DRAWINGS ARE OF EQUAL IMPORTANCE IN DEFINING THE WORK OF THE
CONTRACT DOCUMENTS. CONTRACTORS SHALL REVIEW ALL DRAWINGS BEFORE
THE INSTALLATION OF THEIR WORK. SHOULD THERE BE A DISCREPANCY WITHIN
AND BETWEEN THE DRAWINGS THAT WOULD CAUSE AN AWKWARD OR IMPROPER
INSTALLATION NOTIFY ARCHITECT FOR CLARIFICATION PRIOR TO INSTALLATION
OF SAID WORK. ANY WORK INSTALLED IN CONFLICT WITH THE ARCHITECTURAL
DRAWINGS, SHALL BE CORRECTED BY CONTRACTOR AT THEIR EXPENSE AND AT
NO ADDITIONAL COST TO THE OWNER OR ARCHITECT.
8. DO NOT SCALE DRAWINGS, THE DRAWINGS ARE NOT NECESSARILY TO SCALE -
USE GIVEN DIMENSIONS. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND
DIMENSIONS AT THE JOB SITE PRIOR TO THE START OF CONSTRUCTION. IF
DISCREPANCIES ARE FOUND, NOTIFY ARCHITECT FOR CLARIFICATION BEFORE
COMMENCING THE WORK.
9. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE SHOWN. WHERE
SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT CANNOT BE DETERMINED
CONSULT ARCHITECT BEFORE PROCEEDING WITH THE WORK.
10. FINISH FLOOR ELEVATIONS ARE TO TOP OF CONCRETE, UNLESS OTHERWISE
NOTED.
11. INSTALL ALL DEVICES LOCATED IN FIRE-RATED PARTITIONS TO MAINTAIN THE
FIRE-RATED CONSTRUCTION INTEGRITY.
12. REFER TO SITEWORK AND ELECTRICAL CONTRACTOR'S DRAWINGS AND
MANUFACTURER'S TEMPLATE DRAWINGS FOR ALL EQUIPMENT SUPPORTS, BOLT
SETTING TEMPLATES, ISOLATIONS, SPRING ISOLATION, ETC. NOT SHOWN ON THE
DRAWINGS.
GENERAL PROJECT NOTES:
1. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR
EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED.
2. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR
EACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO
RECEIVE BADGES. COORDINATE WITH COR.
3. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO
CONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLY PROTECTED TO
PREVENT ACCIDENTAL ALARM. ALL SUCH ACTION MUST BE FIRST COORDINATED
AND CLEARED WITH COR. ALL FIRE ALARM DEVICES SHALL BE ACTIVE WHENEVER
CONTRACTOR'S FORCES ARE NOT PRESENT IN WORK AREA.
4. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING
OFFICER.
5. SEE SPECIFICATION SECTIONS 01 00 00D, 01 00 00J AND 01 35 26 FOR INTERIM LIFE
SAFETY MEASURES.
6. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS AND ALL EXISTING CONDITIONS
PRIOR TO PROCEEDING WITH THE WORK. EXISTING CONDITIONS ARE BASED ON
GOVERNMENT FURNISHED EXISTING DRAWINGS AND LIMITED FIELD INVESTIGATION.
NOTIFY COR OF ANY DISCREPANCIES PRIOR TO PROCEEDING.
7. ALL FINISH COLORS AND MATERIALS EFFECTED DURING CONSTRUCTION ARE TO
BE REPLACED TO MATCH EXISTING.
8. SEAL ALL CEILING, FLOOR AND WALL PENETRATIONS AROUND CONDUIT AND
PIPES - TYPICAL. SEE DETAILS ON SHEET AE-501 FOR MORE INFORMATION.
9. THIS PROJECT WILL BE DONE IN A SINGLE PHASE.
10. SEPARATE ALL OCCUPIED AREAS FROM DEMOLITION, RENOVATION OR
CONSTRUCTION ACTIVITIES BY TEMPORARY SMOKE-TIGHT CONSTRUCTION
PARTITIONS WITH APPROVED NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE
MATERIAL.
WALL TYPE 1
1 HOUR FIRE BARRIER
WALL TYPE 2
I HOUR SMOKE BARRIER
WALL TYPE 3
2 HOUR FIRE BARRIER
WALL TYPE 4
2 HOUR FIRE/SMOKE BARRIER
WALL TYPE 5
30 MINUTE SMOKE BARRIER
WALL TYPE 6
DECOMMISSIONED OR NON-RATED SMOKE BARRIER
LIFE SAFETY LINE TYPES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
30 Danforth St., Suite 306, Portland, ME 04102
PH: 207.828.4511
UPGRADE IT SYSTEMS
INFRASTRUCTURE
HAMPTON VAMC
590-19-115
WPP SIB11/26/2021
U
A u to d e s k A u to s a v e s \R e v it\
.0
V A
H a m p to n I
T U p g ra d e s
A R
C H
R s io b h a n .b a ke r.
rv t
/1
/2
:4
:2
P
M
G-002
SYMBOLS AND ABBREVIATIONS
ARCHITECTURAL ABBREVIATIONS
ARCHITECTURAL SYMBOLS
Sheet 2 of 88
CONTRACTOR
LAYDOWN AREA
Revisions: Date:
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
POND
RETAINER
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
148T
27 31
148B
148S
148A
148D
148C
110B
110A
S E W E L L
A V E N U E
A V E N U E
A M E S
S T R E E T
S T R E E T
K N O X
S T R E E T
W O O D F
IN
AVERILL
S T R E E T
T H O M P S O N
BLACK
BOULEVARD
FRANKLIN
E M A N C
IP
A T
IO
N
D R
IV
E
A V E N U E
M c C L E L L A N
H A R R
IS
HA
RR
IS
AVE
NUE
H A R R
IS
A V E N U E
HARRIS
AVENUE
AVENUE
AVERILL
AVENUE
AVENUE
AVERILL
FRANKLIN
BOULEVARD
BOULEVARD
FRANKLIN
F R A N K L
IN
B O U L E V A R D
F R A N K L
IN
B O U
LE
V A R D
M A R T
IN
L
K
IN
G
J R
B O U L E V A R D
M A R T
IN
K
IN
G
J R
B O U L E V A R D
MALLOR
Y
STREET
SHORE
ROAD
AVENUE
HA
RR
IS
AV
EN
UE
3.88
U.S.C.&G.S.
VETERAN
horn dawg's (harold dan's) be nch
8' C.L.F.
6' C.L.F.
6' C.L.F.
4' C.L.F.
4' C.L.F.
BLDG 110B
BLDG 110
BLDG 135
BLDG 116
BLDG 7
BLDG 27
BLDG 31 BLDG 28
BLDG 15
BLDG 18
BLDG 13/14
BLDG 43
BLDG 50
BLDG 66
BLDG 17
BLDG 83
BLDG 37
BLDG 33
BLDG 114
BLDG 113
BLDG 48
BLDG 137
BLDG 144
BLDG 138A
BLDG 146
BLDG 148S
BLDG 173
TELECOM PEDESTAL
TELECOM PEDESTAL
CAMERA
BLDG 52
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
BLDG 36
CLINICAL BUILDING
ADMINISTRATION BUILDING
C C
C
C
C
MH-1
MH-6
MH-4
MH-10
MH-7
MH-16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
B
IM
/0
U p g ra d e
I T
S y s te m s I n fr a s tr u c tu re /0
U p g ra d e I T
S y s te m s I n fr a s tr u c tu re
R
.r v t
/1 /2
:2
:5
P
M
G-003
SITE PLAN UPGRADE IT SYSTEMS
INFRASTRUCTURE
HAMPTON VAMC
590-19-115
SITE
11/26/2021 JFR CVMJOHN F. RAINE, P.E.
VA License #61342 Sheet 3 OF 88
1" = 100'-0"1
COMPLETE SITE FIBER ROUTING PLAN
0 50' 100' 200' 300'
1" = 100'
N
QUADRANT 1 - AREA OF WORK. INFORMATION FOR AREAS OUTSIDE OF THIS QUADRANT ARE FOR
REFERENCE ONLY.
1. REFER TO SHEET T-102 AND CIVIL PLANS FOR ROUTING OF DUCTBANK AND CONDUIT UNDER THIS
CONTRACT.
2. REFER TO CIVIL PLANS FOR ADDITIONAL SITE MANHOLE NUMBERS AND ADDITIONAL SITE
INFORMATION.
CODED NOTES:
DRAWING NOTES:
AREA OF WORK
Revisions: Date:
P R O F
E S S
IO NAL
E N G I
N E E R
JOHN FREDERICK
RAINE
Lic. No. 61342
C O M M O
N W E A
LT
H O F
V I
R G I N I
N R
M
P
RAISED
FLOOR
AG01
AG01d
AG01e
AG01a
AG01g
AG01i
AG01kAG01j
AG01h
AG01f
AG04
AG02
SGA-1
AG08a
AG08a1
AG05
AG03
CGA-1
AG08
AG07
AG10
CGA-2
AG09
AG13
AG12
AG15
AG14
AG14a
AG14b
AG16
AG16b
AG16a
AG17
AG22d
AG22e
AG22c
AG20AG22b
AG22i
AG21
SGA-2
AG22k
AG22f
AG22g
AG22h
AG22j
AG22AG22aAG26
CGA-4
AG23
AG27
AG16
UP UP
CGA-3
CGA-4
AG01b AG01c
AG06
AG17b
AG17a
FAX/
COPY/
STORAGE
STORAGE
VENDING
IRM
IRM
RAISED
FLOOR
STORAGE
BULMAN
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
HATCH BELOW DENOTES GENERAL SCOPE OF
WORK AREA IN WHICH A TEMPORARY CONTAINMENT
UNIT WILL BE USED TO ACCESS THE CEILING.
CEILING ACCESS:
1. ALL CEILING AND FLOOR FINISHES IN ALL
BUILDINGS TO MATCH EXISTING.
2. TOUCH UP PAINT IN AREAS SCUFFED OR
DAMAGED DURING CONSTRUCTION, PAINT
COLOR TO MATCH EXISTING.
FINISHES:
SOME CEILING TILES WILL NEED TO BE
REMOVED AND REPLACED, TBD. - 1 TILE
PER 12 LINEAR FEET OF CABLING, TYP.
1. ALL TEMPORARY PARTITIONS MUST MEET
ALL ICRA REQUIREMENTS, REFER TO
SPECIFICATIONS FOR MORE INFORMATION.
2. PROVIDE FIRESTOPPING AT ALL
PENETRATIONS.
TEMPORARY PARTITIONS:
NOTE: REFER TO G-002 FOR GENERAL,
PROJECT SPECIFIC AND SAFETY NOTES.
NEW WALL
EXISTING TO REMAIN
WALL LEGEND:
TEMPORARY PARTITION
SEE SHEET G-002 FOR WALL TYPE DEFINITIONS.
WALL TYPE 1
WALL TYPE 2
WALL TYPE 3
WALL TYPE 4
WALL TYPE 5
WALL TYPE 6
NOTE: LOCATIONS AND EXTENTS OF EXISTING
FIRE RATED PARTITIONS AND SUITE SEPARATION
ASSEMBLIES TO BE VERIFIED BY CONTRACTOR
IN SCOPE OF WORK AREAS. DESIGN INTENT IS
FOR ALL EXISTING RATINGS TO BE MAINTAINED.
PROVIDE NEW RATED WALLS ONLY WHERE
SPECIFICALLY NOTED.
LIFE SAFETY WALL TYPE LEGEND:
CABLE LEGEND:
CORE 'A' FIBER ROUTING
CORE 'B' FIBER ROUTING
CABLES SHOWN OUTSIDE OF SCOPE OF
WORK AREAS ARE RUN UNDERGROUND,
SEE TELCOM FIBEROPTIC ROUTING
DRAWINGS FOR MORE INFORMATION.
0 4' 8' 16' 24'
1/8" = 1'-0"
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
30 Danforth St., Suite 306, Portland, ME 04102
PH: 207.828.4511
UPGRADE IT SYSTEMS
INFRASTRUCTURE
HAMPTON VAMC
590-19-115
WPP SIB11/26/2021
U
A u to d e s k A u to s a v e s \R e v it\
.0
V A
H a m p to n I
T U p g ra d e s
A R
C H
R s io b h a n .b a ke r.
rv t
/1
/2
:2
:0
P
M
AE-210
BLDG 135 GROUND FLOOR
1/8" = 1'-0"
BUILDING 135 GROUND FLOOR
Sheet 4 of 88Revisions: Date:
A122
A122a
A124 a126c A126b A126a S1A-2
A123
A121 A119
C1A-3
A115 A113 A111
A118 A116 A114
A112
A110a
A120 A110
A109
C1A-2
A108
A107
A105 A101a
C1A-1
A106
A103
S1A-1
A110b
A102
A101f
A101g
A101e
A101e1
A101
A101b A101c
A101d
A101d1
A126
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
HATCH BELOW DENOTES GENERAL SCOPE OF
WORK AREA IN WHICH A TEMPORARY CONTAINMENT
UNIT WILL BE USED TO ACCESS THE CEILING.
CEILING ACCESS:
1. ALL CEILING AND FLOOR FINISHES IN ALL
BUILDINGS TO MATCH EXISTING.
2. TOUCH UP PAINT IN AREAS SCUFFED OR
DAMAGED DURING CONSTRUCTION, PAINT
COLOR TO MATCH EXISTING.
FINISHES:
SOME CEILING TILES WILL NEED TO BE
REMOVED AND REPLACED, TBD. - 1 TILE
PER 12 LINEAR FEET OF CABLING, TYP.
1. ALL TEMPORARY PARTITIONS MUST MEET
ALL ICRA REQUIREMENTS, REFER TO
SPECIFICATIONS FOR MORE INFORMATION.
2. PROVIDE FIRESTOPPING AT ALL
PENETRATIONS.
TEMPORARY PARTITIONS:
NOTE: REFER TO G-002 FOR GENERAL,
PROJECT SPECIFIC AND SAFETY NOTES.
NEW WALL
EXISTING TO REMAIN
WALL LEGEND:
TEMPORARY PARTITION
SEE SHEET G-002 FOR WALL TYPE DEFINITIONS.
WALL TYPE 1
WALL TYPE 2
WALL TYPE 3
WALL TYPE 4
WALL TYPE 5
WALL TYPE 6
NOTE: LOCATIONS AND EXTENTS OF EXISTING
FIRE RATED PARTITIONS AND SUITE SEPARATION
ASSEMBLIES TO BE VERIFIED BY CONTRACTOR
IN SCOPE OF WORK AREAS. DESIGN INTENT IS
FOR ALL EXISTING RATINGS TO BE MAINTAINED.
PROVIDE NEW RATED WALLS ONLY WHERE
SPECIFICALLY NOTED.
LIFE SAFETY WALL TYPE LEGEND:
CABLE LEGEND:
CORE 'A' FIBER ROUTING
CORE 'B' FIBER ROUTING
CABLES SHOWN OUTSIDE OF SCOPE OF
WORK AREAS ARE RUN UNDERGROUND,
SEE TELCOM FIBEROPTIC ROUTING
DRAWINGS FOR MORE INFORMATION.
0 4' 8' 16' 24'
1/8" = 1'-0"
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
30 Danforth St., Suite 306, Portland, ME 04102
PH: 207.828.4511
UPGRADE IT SYSTEMS
INFRASTRUCTURE
HAMPTON VAMC
590-19-115
WPP SIB11/26/2021
U
A u to d e s k A u to s a v e s \R e v it\
.0
V A
H a m p to n I
T U p g ra d e s
A R
C H
R s io b h a n .b a ke r.
rv t
/1
/2
:2
:0
P
M
AE-211
BLDG 135 FIRST FLOOR
1/8" = 1'-0"1
BUILDING 135 FIRST FLOOR
Sheet 5 of 88Revisions: Date:
b c
G
L -1
C C
-G
1615A 17
20A
20B
#3
ELEV.
20D
10A
2A
C-1
AE-501
F5
Sim
EXTERIOR PENETRATIONS
ABOVE GRADE, SEE
TELCOM DRAWINGS FOR
ADDITIONAL DETAILS.
PATCH TO MATCH
EXTERIOR FINISHES.
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
HATCH BELOW DENOTES GENERAL SCOPE OF
WORK AREA IN WHICH A TEMPORARY CONTAINMENT
UNIT WILL BE USED TO ACCESS THE CEILING.
CEILING ACCESS:
1. ALL CEILING AND FLOOR FINISHES IN ALL
BUILDINGS TO MATCH EXISTING.
2. TOUCH UP PAINT IN AREAS SCUFFED OR
DAMAGED DURING CONSTRUCTION, PAINT
COLOR TO MATCH EXISTING.
FINISHES:
SOME CEILING TILES WILL NEED TO BE
REMOVED AND REPLACED, TBD. - 1 TILE
PER 12 LINEAR FEET OF CABLING, TYP.
1. ALL TEMPORARY PARTITIONS MUST MEET
ALL ICRA REQUIREMENTS, REFER TO
SPECIFICATIONS FOR MORE INFORMATION.
2. PROVIDE FIRESTOPPING AT ALL
PENETRATIONS.
TEMPORARY PARTITIONS:
NOTE: REFER TO G-002 FOR GENERAL,
PROJECT SPECIFIC AND SAFETY NOTES.
NEW WALL
EXISTING TO REMAIN
WALL LEGEND:
TEMPORARY PARTITION
SEE SHEET G-002 FOR WALL TYPE DEFINITIONS.
WALL TYPE 1
WALL TYPE 2
WALL TYPE 3
WALL TYPE 4
WALL TYPE 5
WALL TYPE 6
NOTE: LOCATIONS AND EXTENTS OF EXISTING
FIRE RATED PARTITIONS AND SUITE SEPARATION
ASSEMBLIES TO BE VERIFIED BY CONTRACTOR
IN SCOPE OF WORK AREAS. DESIGN INTENT IS
FOR ALL EXISTING RATINGS TO BE MAINTAINED.
PROVIDE NEW RATED WALLS ONLY WHERE
SPECIFICALLY NOTED.
LIFE SAFETY WALL TYPE LEGEND:
CABLE LEGEND:
CORE 'A' FIBER ROUTING
CORE 'B' FIBER ROUTING
CABLES SHOWN OUTSIDE OF SCOPE OF
WORK AREAS ARE RUN UNDERGROUND,
SEE TELCOM FIBEROPTIC ROUTING
DRAWINGS FOR MORE INFORMATION.
0 4' 8' 16' 24'
1/8" = 1'-0"
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
30 Danforth St., Suite 306, Portland, ME 04102
PH: 207.828.4511
UPGRADE IT SYSTEMS
INFRASTRUCTURE
HAMPTON VAMC
590-19-115
WPP SIB11/26/2021
U
A u to d e s k A u to s a v e s \R e v it\
.0
V A
H a m p to n I
T U p g ra d e s
A R
C H
R s io b h a n .b a ke r.
rv t
/1
/2
:4
:2
P
M
AE-220
BLDG 168 GROUND FLOOR
1/8" = 1'-0"
BUILDING 168 GROUND FLOOR
Sheet 6 of 88Revisions: Date:
HAC
CLEAN UTL
CLERICAL
CHECK
OUT
STORAGE
NURSE
EXAM
EXAM
EXAM
MED ROOM
BG16
BG14
BG12
BG10
BG20
BG22
BG22A
BG22B BG22C BG22D BG22E
BG16F
BG16E
BG16F.1
BG16G
BG16H
BG1J
BG16N.1
BG16Q
BG16U
BG16S
BG16T
BG16R
BG16P
BG16M
BG16L
BG16D
BG16C
BG16B
BG12A
BG16K
OFFICE
OFFICE
STORAGE
OFFICE
TOILET
TREAT
TREAT
BG16N
EXAM
MECH
EXAM
SGB-5
STAIR #5
C G
B -3
WOMEN
SOILED
BG16A
BG14A
BG25 BG23 BG21 BG19
BG15B1
BG15B
BG15
BG15A
BG13
BG13A
EGB-10
CGB-1
BG11
BG09A
BG09
BG05
BG01BG03
BG06
BG06A
BG08 BG02
EBG-9 EBG-8
BG03
CGB-2
EMS SUP.
EMS
BG15C
#10
ELEV.
STAIR #2
RAMP
#8#9
ELEVATORS
SUBBASEMENT
R A
M P
8F
MORGUE
MORGUE
DN. TO
CGC-1
CGC-2
CG03
CGB-1
ATM
CG01
SGC-2
AE-501
F5
Sim
AE-501
F5
Sim
HATCH BELOW DENOTES GENERAL SCOPE OF
WORK AREA IN WHICH A TEMPORARY CONTAINMENT
UNIT WILL BE USED TO ACCESS THE CEILING.
CEILING ACCESS:
1. ALL CEILING AND FLOOR FINISHES IN ALL
BUILDINGS TO MATCH EXISTING.
2. TOUCH UP PAINT IN AREAS SCUFFED OR
DAMAGED DURING CONSTRUCTION, PAINT
COLOR TO MATCH EXISTING.
FINISHES:
SOME CEILING TILES WILL NEED TO BE
REMOVED AND REPLACED, TBD. - 1 TILE
PER 12 LINEAR FEET OF CABLING, TYP.
1. ALL TEMPORARY PARTITIONS MUST MEET
ALL ICRA REQUIREMENTS, REFER TO
SPECIFICATIONS FOR MORE INFORMATION.
2. PROVIDE FIRESTOPPING AT ALL
PENETRATIONS.
TEMPORARY PARTITIONS:
NOTE: REFER TO G-002 FOR GENERAL,
PROJECT SPECIFIC AND SAFETY NOTES.
NEW WALL
EXISTING TO REMAIN
WALL LEGEND:
TEMPORARY PARTITION
SEE SHEET G-002 FOR WALL TYPE DEFINITIONS.
WALL TYPE 1
WALL TYPE 2
WALL TYPE 3
WALL TYPE 4
WALL TYPE 5
WALL TYPE 6
NOTE: LOCATIONS AND EXTENTS OF EXISTING
FIRE RATED PARTITIONS AND SUITE SEPARATION
ASSEMBLIES TO BE VERIFIED BY CONTRACTOR
IN SCOPE OF WORK AREAS. DESIGN INTENT IS
FOR ALL EXISTING RATINGS TO BE MAINTAINED.
PROVIDE NEW RATED WALLS ONLY WHERE
SPECIFICALLY NOTED.
LIFE SAFETY WALL TYPE LEGEND:
CABLE LEGEND:
CORE 'A' FIBER ROUTING
CORE 'B' FIBER ROUTING
CABLES SHOWN OUTSIDE OF SCOPE OF
WORK AREAS ARE RUN UNDERGROUND,
SEE TELCOM FIBEROPTIC ROUTING
DRAWINGS FOR MORE INFORMATION.
0 4' 8' 16' 24'
1/8" = 1'-0"
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
30 Danforth St., Suite 306, Portland, ME 04102
PH: 207.828.4511
UPGRADE IT SYSTEMS
INFRASTRUCTURE
HAMPTON VAMC
590-19-115
WPP SIB11/26/2021
U
A u to d e s k A u to s a v e s \R e v it\
.0
V A
H a m p to n I
T U p g ra d e s
A R
C H
R s io b h a n .b a ke r.
rv t
/1
/2
:2
:0
P
M
AE-230A
BLDG 110 GROUND FLOOR A
1/8" = 1'-0"
BUILDING 110 GROUND FLOOR - A
CONTINUE ON SHEET AE-230B
Sheet 7 of 88Revisions: Date:
LINEN CHUTE (CLOSED)
SUBBASEMENT
#1
STAIR
CGD-4
RAMP
DN. TO
ELEV.
#6
#3STAIR
DG26 DG24
DG22
DG20
DG20a
SGD-3
DG05k
DG05j.1 DG05j
DG05h.1
DG05h
DG05g
CGD-3
DG05f DG05e
CGD-1
DG14
DG12
DG13
DG05d DG05d.1
DG05c
DG05c.1
DG05b
DG05a DG01d
DG05M
DG05
DG05n
DG05p
DG01a
DG01
DG01b
DG01c
DG02
DG04
DG06
DG10
CGD-2
DG28
DG21a
DG23
CGC-2
DG18 DG16
CG02
C G
.a
IRM/COMM. CLO
#1
#2
#3
#4
#5
#6
#7
#8
#9
#10
#11
#12
#13
#14#15#16
#17
#18
#19
#20
EDG-6
CGD-5
DG27
DG29
COMM. CLO ELEC. CLO.
CLO.
DG21
CG01
SGC-1
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
HATCH BELOW DENOTES GENERAL SCOPE OF
WORK AREA IN WHICH A TEMPORARY CONTAINMENT
UNIT WILL BE USED TO ACCESS THE CEILING.
CEILING ACCESS:
1. ALL CEILING AND FLOOR FINISHES IN ALL
BUILDINGS TO MATCH EXISTING.
2. TOUCH UP PAINT IN AREAS SCUFFED OR
DAMAGED DURING CONSTRUCTION, PAINT
COLOR TO MATCH EXISTING.
FINISHES:
SOME CEILING TILES WILL NEED TO BE
REMOVED AND REPLACED, TBD. - 1 TILE
PER 12 LINEAR FEET OF CABLING, TYP.
1. ALL TEMPORARY PARTITIONS MUST MEET
ALL ICRA REQUIREMENTS, REFER TO
SPECIFICATIONS FOR MORE INFORMATION.
2. PROVIDE FIRESTOPPING AT ALL
PENETRATIONS.
TEMPORARY PARTITIONS:
NOTE: REFER TO G-002 FOR GENERAL,
PROJECT SPECIFIC AND SAFETY NOTES.
NEW WALL
EXISTING TO REMAIN
WALL LEGEND:
TEMPORARY PARTITION
SEE SHEET G-002 FOR WALL TYPE DEFINITIONS.
WALL TYPE 1
WALL TYPE 2
WALL TYPE 3
WALL TYPE 4
WALL TYPE 5
WALL TYPE 6
NOTE: LOCATIONS AND EXTENTS OF EXISTING
FIRE RATED PARTITIONS AND SUITE SEPARATION
ASSEMBLIES TO BE VERIFIED BY CONTRACTOR
IN SCOPE OF WORK AREAS. DESIGN INTENT IS
FOR ALL EXISTING RATINGS TO BE MAINTAINED.
PROVIDE NEW RATED WALLS ONLY WHERE
SPECIFICALLY NOTED.
LIFE SAFETY WALL TYPE LEGEND:
CABLE LEGEND:
CORE 'A' FIBER ROUTING
CORE 'B' FIBER ROUTING
CABLES SHOWN OUTSIDE OF SCOPE OF
WORK AREAS ARE RUN UNDERGROUND,
SEE TELCOM FIBEROPTIC ROUTING
DRAWINGS FOR MORE INFORMATION.
0 4' 8' 16' 24'
1/8" = 1'-0"
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
30 Danforth St., Suite 306, Portland, ME 04102
PH: 207.828.4511
UPGRADE IT SYSTEMS
INFRASTRUCTURE
HAMPTON VAMC
590-19-115
WPP SIB11/26/2021
U
A u to d e s k A u to s a v e s \R e v it\
.0
V A
H a m p to n I
T U p g ra d e s
A R
C H
R s io b h a n .b a ke r.
rv t
/1
/2
:2
:1
P
M
AE-230B
BLDG 110 GROUND FLOOR B
1/8" = 1'-0"
BUILDING 110 GROUND FLOOR - B
CONTINUE ON SHEET AE-230A
Sheet 8 of 88Revisions: Date:
B105
B107A
B108
B107 ELEV.
#10 C B
-2
B106
STAIR #2 B103A
B101A
B103
S1B-2
ELEVATORS
#9
B100A
#8
B100 B101
B102A B102B
B102C
B100B
B102
B102D
B102K
B102U
B102F
B102E B102E1 B104
E1B-10
B102M
B102J B102H1 B102H2
C1B-1
C1B-3
B102I
B102W
B102L1
B102L
B111
B110
B109
B102Y C B
-4 B102N
B102O
B102P
B102R
B102Q
B102VB102X
B102S1
B102S
B102T
S1B-5
STAIR #5
PORCH
B107B
B107C
B102G
C102
C100
C104
C1C-1
E1C-9 E1C-8
C106
C1C-2
B105a
B107D
CHAPEL
CHAPLAIN
CHAPLAIN
LOBBY
N
W
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
HATCH BELOW DENOTES GENERAL SCOPE OF
WORK AREA IN WHICH A TEMPORARY CONTAINMENT
UNIT WILL BE USED TO ACCESS THE CEILING.
CEILING ACCESS:
1. ALL CEILING AND FLOOR FINISHES IN ALL
BUILDINGS TO MATCH EXISTING.
2. TOUCH UP PAINT IN AREAS SCUFFED OR
DAMAGED DURING CONSTRUCTION, PAINT
COLOR TO MATCH EXISTING.
FINISHES:
SOME CEILING TILES WILL NEED TO BE
REMOVED AND REPLACED, TBD. - 1 TILE
PER 12 LINEAR FEET OF CABLING, TYP.
1. ALL TEMPORARY PARTITIONS MUST MEET
ALL ICRA REQUIREMENTS, REFER TO
SPECIFICATIONS FOR MORE INFORMATION.
2. PROVIDE FIRESTOPPING AT ALL
PENETRATIONS.
TEMPORARY PARTITIONS:
NOTE: REFER TO G-002 FOR GENERAL,
PROJECT SPECIFIC AND SAFETY NOTES.
NEW WALL
EXISTING TO REMAIN
WALL LEGEND:
TEMPORARY PARTITION
SEE SHEET G-002 FOR WALL TYPE DEFINITIONS.
WALL TYPE 1
WALL TYPE 2
WALL TYPE 3
WALL TYPE 4
WALL TYPE 5
WALL TYPE 6
NOTE: LOCATIONS AND EXTENTS OF EXISTING
FIRE RATED PARTITIONS AND SUITE SEPARATION
ASSEMBLIES TO BE VERIFIED BY CONTRACTOR
IN SCOPE OF WORK AREAS. DESIGN INTENT IS
FOR ALL EXISTING RATINGS TO BE MAINTAINED.
PROVIDE NEW RATED WALLS ONLY WHERE
SPECIFICALLY NOTED.
LIFE SAFETY WALL TYPE LEGEND:
CABLE LEGEND:
CORE 'A' FIBER ROUTING
CORE 'B' FIBER ROUTING
CABLES SHOWN OUTSIDE OF SCOPE OF
WORK AREAS ARE RUN UNDERGROUND,
SEE TELCOM FIBEROPTIC ROUTING
DRAWINGS FOR MORE INFORMATION.
0 4' 8' 16' 24'
1/8" = 1'-0"
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
30 Danforth St., Suite 306, Portland, ME 04102
PH: 207.828.4511
UPGRADE IT SYSTEMS
INFRASTRUCTURE
HAMPTON VAMC
590-19-115
WPP SIB11/26/2021
U
A u to d e s k A u to s a v e s \R e v it\
.0
V A
H a m p to n I
T U p g ra d e s
A R
C H
R s io b h a n .b a ke r.
rv t
/1
/2
:2
:1
P
M
AE-231A
BLDG 110 FIRST FLOOR A
1/8" = 1'-0"
BUILDING 110 FIRST FLOOR - A
CONTINUE ON SHEET AE-231B
Sheet 9 of 88Revisions: Date:
D127
D101
D101a
D103
UP
STAIR
#1DN
D107
D103a
D142
DN
D139
D143
E1D-6SID-3
D139a
D141
D113
D115
ROOF
PATIO
D116
D114a
D124
D117
D106
D121
D112
D107a
D108
D102
D123
D125
D102a
D100
PORCH
1D-115A
D132
D128
D135 D136
UP
DN
STAIR #4
S1D-4
D133
D129
ELEV.
#6
UP
C
A
C
B
D137
D131
D105
D140
A B
C
D144
BA
C1D-1 D105a
C
ID
-2 C
D
-3
A
B
C
D
A
B
C
D110
B
C B
A
D114
D118
SIC-3
C100
C104
C103
C105
C1C-2
FILES
CONF.
ROOM
WOMEN
MEN
HAC
LOBBY
N
S
E
W
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
HATCH BELOW DENOTES GENERAL SCOPE OF
WORK AREA IN WHICH A TEMPORARY CONTAINMENT
UNIT WILL BE USED TO ACCESS THE CEILING.
CEILING ACCESS:
1. ALL CEILING AND FLOOR FINISHES IN ALL
BUILDINGS TO MATCH EXISTING.
2. TOUCH UP PAINT IN AREAS SCUFFED OR
DAMAGED DURING CONSTRUCTION, PAINT
COLOR TO MATCH EXISTING.
FINISHES:
SOME CEILING TILES WILL NEED TO BE
REMOVED AND REPLACED, TBD. - 1 TILE
PER 12 LINEAR FEET OF CABLING, TYP.
1. ALL TEMPORARY PARTITIONS MUST MEET
ALL ICRA REQUIREMENTS, REFER TO
SPECIFICATIONS FOR MORE INFORMATION.
2. PROVIDE FIRESTOPPING AT ALL
PENETRATIONS.
TEMPORARY PARTITIONS:
NOTE: REFER TO G-002 FOR GENERAL,
PROJECT SPECIFIC AND SAFETY NOTES.
NEW WALL
EXISTING TO REMAIN
WALL LEGEND:
TEMPORARY PARTITION
SEE SHEET G-002 FOR WALL TYPE DEFINITIONS.
WALL TYPE 1
WALL TYPE 2
WALL TYPE 3
WALL TYPE 4
WALL TYPE 5
WALL TYPE 6
NOTE: LOCATIONS AND EXTENTS OF EXISTING
FIRE RATED PARTITIONS AND SUITE SEPARATION
ASSEMBLIES TO BE VERIFIED BY CONTRACTOR
IN SCOPE OF WORK AREAS. DESIGN INTENT IS
FOR ALL EXISTING RATINGS TO BE MAINTAINED.
PROVIDE NEW RATED WALLS ONLY WHERE
SPECIFICALLY NOTED.
LIFE SAFETY WALL TYPE LEGEND:
CABLE LEGEND:
CORE 'A' FIBER ROUTING
CORE 'B' FIBER ROUTING
CABLES SHOWN OUTSIDE OF SCOPE OF
WORK AREAS ARE RUN UNDERGROUND,
SEE TELCOM FIBEROPTIC ROUTING
DRAWINGS FOR MORE INFORMATION.
0 4' 8' 16' 24'
1/8" = 1'-0"
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
30 Danforth St., Suite 306, Portland, ME 04102
PH: 207.828.4511
UPGRADE IT SYSTEMS
INFRASTRUCTURE
HAMPTON VAMC
590-19-115
WPP SIB11/26/2021
U
A u to d e s k A u to s a v e s \R e v it\
.0
V A
H a m p to n I
T U p g ra d e s
A R
C H
R s io b h a n .b a ke r.
rv t
/1
/2
:4
:2
P
M
AE-231B
BLDG 110 FIRST FLOOR B
1/8" = 1'-0"1
BUILDING 110 FIRST FLOOR - B
CONTINUE ON SHEET AE-231A
Sheet 10 of 88Revisions: Date:
B223
STAIRS #5 DN
UP
S2B-5
B232
B234
B236
B238
B239
B235
B225
B224
B231
B216
B227a
B220
B229
B227
B214
B230a
B230
B228
B226
B210
TELE. CLO. B207a B201
B206 B202
#2#1
ELEVATORS
E2C-1
C201
C204
B203B205B207
B205a
UPDN
B a
B208
S2B-2
ELECT. CLO.
E2B-10
B221 B219
STAIR #2
#10
ELEV.
B209
B237
B245
B243
B242
B242a
B246
B227a.1
B212
B244
C2C-1C2B-1
C2B-5
C2B-4
C2B-3
C2B-2
E2C-2
C2C-2
C200
C200dC200c
C200b
C200a
TV
AE-501
F5
Sim
AE-501
F5
Sim
HATCH BELOW DENOTES GENERAL SCOPE OF
WORK AREA IN WHICH A TEMPORARY CONTAINMENT
UNIT WILL BE USED TO ACCESS THE CEILING.
CEILING ACCESS:
1. ALL CEILING AND FLOOR FINISHES IN ALL
BUILDINGS TO MATCH EXISTING.
2. TOUCH UP PAINT IN AREAS SCUFFED OR
DAMAGED DURING CONSTRUCTION, PAINT
COLOR TO MATCH EXISTING.
FINISHES:
SOME CEILING TILES WILL NEED TO BE
REMOVED AND REPLACED, TBD. - 1 TILE
PER 12 LINEAR FEET OF CABLING, TYP.
1. ALL TEMPORARY PARTITIONS MUST MEET
ALL ICRA REQUIREMENTS, REFER TO
SPECIFICATIONS FOR MORE INFORMATION.
2. PROVIDE FIRESTOPPING AT ALL
PENETRATIONS.
TEMPORARY PARTITIONS:
NOTE: REFER TO G-002 FOR GENERAL,
PROJECT SPECIFIC AND SAFETY NOTES.
NEW WALL
EXISTING TO REMAIN
WALL LEGEND:
TEMPORARY PARTITION
SEE SHEET G-002 FOR WALL TYPE DEFINITIONS.
WALL TYPE 1
WALL TYPE 2
WALL TYPE 3
WALL TYPE 4
WALL TYPE 5
WALL TYPE 6
NOTE: LOCATIONS AND EXTENTS OF EXISTING
FIRE RATED PARTITIONS AND SUITE SEPARATION
ASSEMBLIES TO BE VERIFIED BY CONTRACTOR
IN SCOPE OF WORK AREAS. DESIGN INTENT IS
FOR ALL EXISTING RATINGS TO BE MAINTAINED.
PROVIDE NEW RATED WALLS ONLY WHERE
SPECIFICALLY NOTED.
LIFE SAFETY WALL TYPE LEGEND:
CABLE LEGEND:
CORE 'A' FIBER ROUTING
CORE 'B' FIBER ROUTING
CABLES SHOWN OUTSIDE OF SCOPE OF
WORK AREAS ARE RUN UNDERGROUND,
SEE TELCOM FIBEROPTIC ROUTING
DRAWINGS FOR MORE INFORMATION.
0 4' 8' 16' 24'
1/8" = 1'-0"
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
30 Danforth St., Suite 306, Portland, ME 04102
PH: 207.828.4511
UPGRADE IT SYSTEMS
INFRASTRUCTURE
HAMPTON VAMC
590-19-115
WPP SIB11/26/2021
U
A u to d e s k A u to s a v e s \R e v it\
.0
V A
H a m p to n I
T U p g ra d e s
A R
C H
R s io b h a n .b a ke r.
rv t
/1
/2
:2
:1
P
M
AE-232A
BLDG 110 SECOND FLOOR A
1/8" = 1'-0"
BUILDING 110 SECOND FLOOR - A
CONTINUE ON SHEET AE-232B
Sheet 11 of 88Revisions: Date:
STAIR #4
DN
UP
D234
S2D-4
D230
D229
D231
D233
D235
PANEL CLO.
NEW EMERG.
D200
D202
TEL. CLO.
D204 D208
D227
D225
D223
D221
D219
D214
D226
D224
D220
D220b
D220a
D216a.1 D216a
D216b.1
D216b
D244
D216
ELEC. CLO.
D216cD215
E2D-4
#4
ELEV.
#3
STAIR D237
D237a D239
D241
D243
D242
D240
#1
STAIR
D209
S2D-3 S2C-1
D238
D210D207a
D207
D203a
D203D201
C205
C201 D215a
D212
D209a
NUCLEAR MED SUITE
D216
D202a
C2D-1 C2D-2
C2D-3
C2D-4
C2D-5
C2D-6
C2C-1
C203 C2C-3C2C-2
C200
C200h
C200g
C200f
C200eC200d cab.
cab.
TV
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
HATCH BELOW DENOTES GENERAL SCOPE OF
WORK AREA IN WHICH A TEMPORARY CONTAINMENT
UNIT WILL BE USED TO ACCESS THE CEILING.
CEILING ACCESS:
1. ALL CEILING AND FLOOR FINISHES IN ALL
BUILDINGS TO MATCH EXISTING.
2. TOUCH UP PAINT IN AREAS SCUFFED OR
DAMAGED DURING CONSTRUCTION, PAINT
COLOR TO MATCH EXISTING.
FINISHES:
SOME CEILING TILES WILL NEED TO BE
REMOVED AND REPLACED, TBD. - 1 TILE
PER 12 LINEAR FEET OF CABLING, TYP.
1. ALL TEMPORARY PARTITIONS MUST MEET
ALL ICRA REQUIREMENTS, REFER TO
SPECIFICATIONS FOR MORE INFORMATION.
2. PROVIDE FIRESTOPPING AT ALL
PENETRATIONS.
TEMPORARY PARTITIONS:
NOTE: REFER TO G-002 FOR GENERAL,
PROJECT SPECIFIC AND SAFETY NOTES.
NEW WALL
EXISTING TO REMAIN
WALL LEGEND:
TEMPORARY PARTITION
SEE SHEET G-002 FOR WALL TYPE DEFINITIONS.
WALL TYPE 1
WALL TYPE 2
WALL TYPE 3
WALL TYPE 4
WALL TYPE 5
WALL TYPE 6
NOTE: LOCATIONS AND EXTENTS OF EXISTING
FIRE RATED PARTITIONS AND SUITE SEPARATION
ASSEMBLIES TO BE VERIFIED BY CONTRACTOR
IN SCOPE OF WORK AREAS. DESIGN INTENT IS
FOR ALL EXISTING RATINGS TO BE MAINTAINED.
PROVIDE NEW RATED WALLS ONLY WHERE
SPECIFICALLY NOTED.
LIFE SAFETY WALL TYPE LEGEND:
CABLE LEGEND:
CORE 'A' FIBER ROUTING
CORE 'B' FIBER ROUTING
CABLES SHOWN OUTSIDE OF SCOPE OF
WORK AREAS ARE RUN UNDERGROUND,
SEE TELCOM FIBEROPTIC ROUTING
DRAWINGS FOR MORE INFORMATION.
0 4' 8' 16' 24'
1/8" = 1'-0"
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
30 Danforth St., Suite 306, Portland, ME 04102
PH: 207.828.4511
UPGRADE IT SYSTEMS
INFRASTRUCTURE
HAMPTON VAMC
590-19-115
WPP SIB11/26/2021
U
A u to d e s k A u to s a v e s \R e v it\
.0
V A
H a m p to n I
T U p g ra d e s
A R
C H
R s io b h a n .b a ke r.
rv t
/1
/2
:2
:1
P
M
AE-232B
BLDG 110 SECOND FLOOR B
1/8" = 1'-0"
BUILDING 110 SECOND FLOOR - B
CONTINUE ON SHEET AE-232A
Sheet 12 of 88Revisions: Date:
C300
C301C
TELE.
C3C-2
C301
PUBLIC
E3C-9
C3C-1
E3C-8
C305C304
ELEVATORS
C3C-3
#5 DN
UP
STAIRS
B328 B331
B326
B329
B327
B324
B325
B323A
B317
B318
B316
B320A1
B323
B321
B315 B320A
B320
B319 B307 B303
B301
B313
B314
B312
B311
#10
ELEV.
B333
B335
B333A
DNUP
STAIR#2
B334
B305 B308A
B310
B308 B306 B304
B306A B302
B337
B336
B338
B309
B315A
E3B-10
B322
B310A
S3B-2
C3B-1
C 3B
-2 C
3B -3
S 3B
-5
#9 #8
C3B-4
N
AE-501
F5
Sim
AE-501
F5 Sim
HATCH BELOW DENOTES GENERAL SCOPE OF
WORK AREA IN WHICH A TEMPORARY CONTAINMENT
UNIT WILL BE USED TO ACCESS THE CEILING.
CEILING ACCESS:
1. ALL CEILING AND FLOOR FINISHES IN ALL
BUILDINGS TO MATCH EXISTING.
2. TOUCH UP PAINT IN AREAS SCUFFED OR
DAMAGED DURING CONSTRUCTION, PAINT
COLOR TO MATCH EXISTING.
FINISHES:
SOME CEILING TILES WILL NEED TO BE
REMOVED AND REPLACED, TBD. - 1 TILE
PER 12 LINEAR FEET OF CABLING, TYP.
1. ALL TEMPORARY PARTITIONS MUST MEET
ALL ICRA REQUIREMENTS, REFER TO
SPECIFICATIONS FOR MORE INFORMATION.
2. PROVIDE FIRESTOPPING AT ALL
PENETRATIONS.
TEMPORARY PARTITIONS:
NOTE: REFER TO G-002 FOR GENERAL,
PROJECT SPECIFIC AND SAFETY NOTES.
NEW WALL
EXISTING TO REMAIN
WALL LEGEND:
TEMPORARY PARTITION
SEE SHEET G-002 FOR WALL TYPE DEFINITIONS.
WALL TYPE 1
WALL TYPE 2
WALL TYPE 3
WALL TYPE 4
WALL TYPE 5
WALL TYPE 6
NOTE: LOCATIONS AND EXTENTS OF EXISTING
FIRE RATED PARTITIONS AND SUITE SEPARATION
ASSEMBLIES TO BE VERIFIED BY CONTRACTOR
IN SCOPE OF WORK AREAS. DESIGN INTENT IS
FOR ALL EXISTING RATINGS TO BE MAINTAINED.
PROVIDE NEW RATED WALLS ONLY WHERE
SPECIFICALLY NOTED.
LIFE SAFETY WALL TYPE LEGEND:
CABLE LEGEND:
CORE 'A' FIBER ROUTING
CORE 'B' FIBER ROUTING
CABLES SHOWN OUTSIDE OF SCOPE OF
WORK AREAS ARE RUN UNDERGROUND,
SEE TELCOM FIBEROPTIC ROUTING
DRAWINGS FOR MORE INFORMATION.
0 4' 8' 16' 24'
1/8" = 1'-0"
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
30 Danforth St., Suite 306, Portland, ME 04102
PH: 207.828.4511
UPGRADE IT SYSTEMS
INFRASTRUCTURE
HAMPTON VAMC
590-19-115
WPP SIB11/26/2021
U
A u to d e s k A u to s a v e s \R e v it\
.0
V A
H a m p to n I
T U p g ra d e s
A R
C H
R s io b h a n .b a ke r.
rv t
/1
/2
:2
:1
P
M
AE-233A
BLDG 110 THIRD FLOOR A
1/8" = 1'-0"
BUILDING 110 THIRD FLOOR - A
CONTINUE ON SHEET AE-233B
Sheet 13 of 88Revisions: Date:
D300
C301EC301D
C3C-2
C301B
C301A
C3C-3
C302
C306
S3D-1
STAIRS
#1
D317A
#4
STAIRS
C3D-3
D323
D319
D324
D324A
D322A
D322
D320
D320A
D318A
S3D-4
D325B
D325B1
D325
D325A1
D325A
D321B1
D321
D321B
D321A
D321A1
D317
D317B1
D317B
D332
C3D-4
D302
D301
C3D-1
D302A
D304
D318
D308
D306
D303A
D303 D305 D307
S3D-3
STAIRS
#3
D315
D310
D317A1
D311
D310A1
D310A D316
C3D-2
D312
D314
D326
E3D-6
ELEV.
D309
D328
D331
D330A
D330
D313
D313A
D329
D329A D332A
D316A
D315A
D327A
D327
N
C
AE-501
F5
Sim
HATCH BELOW DENOTES GENERAL SCOPE OF
WORK AREA IN WHICH A TEMPORARY CONTAINMENT
UNIT WILL BE USED TO ACCESS THE CEILING.
CEILING ACCESS:
1. ALL CEILING AND FLOOR FINISHES IN ALL
BUILDINGS TO MATCH EXISTING.
2. TOUCH UP PAINT IN AREAS SCUFFED OR
DAMAGED DURING CONSTRUCTION, PAINT
COLOR TO MATCH EXISTING.
FINISHES:
SOME CEILING TILES WILL NEED TO BE
REMOVED AND REPLACED, TBD. - 1 TILE
PER 12 LINEAR FEET OF CABLING, TYP.
1. ALL TEMPORARY PARTITIONS MUST MEET
ALL ICRA REQUIREMENTS, REFER TO
SPECIFICATIONS FOR MORE INFORMATION.
2. PROVIDE FIRESTOPPING AT ALL
PENETRATIONS.
TEMPORARY PARTITIONS:
NOTE: REFER TO G-002 FOR GENERAL,
PROJECT SPECIFIC AND SAFETY NOTES.
NEW WALL
EXISTING TO REMAIN
WALL LEGEND:
TEMPORARY PARTITION
SEE SHEET G-002 FOR WALL TYPE DEFINITIONS.
WALL TYPE 1
WALL TYPE 2
WALL TYPE 3
WALL TYPE 4
WALL TYPE 5
WALL TYPE 6
NOTE: LOCATIONS AND EXTENTS OF EXISTING
FIRE RATED PARTITIONS AND SUITE SEPARATION
ASSEMBLIES TO BE VERIFIED BY CONTRACTOR
IN SCOPE OF WORK AREAS. DESIGN INTENT IS
FOR ALL EXISTING RATINGS TO BE MAINTAINED.
PROVIDE NEW RATED WALLS ONLY WHERE
SPECIFICALLY NOTED.
LIFE SAFETY WALL TYPE LEGEND:
CABLE LEGEND:
CORE 'A' FIBER ROUTING
CORE 'B' FIBER ROUTING
CABLES SHOWN OUTSIDE OF SCOPE OF
WORK AREAS ARE RUN UNDERGROUND,
SEE TELCOM FIBEROPTIC ROUTING
DRAWINGS FOR MORE INFORMATION.
0 4' 8' 16' 24'
1/8" = 1'-0"
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
30 Danforth St., Suite 306, Portland, ME 04102
PH: 207.828.4511
UPGRADE IT SYSTEMS
INFRASTRUCTURE
HAMPTON VAMC
590-19-115
WPP SIB11/26/2021
U
A u to d e s k A u to s a v e s \R e v it\
.0
V A
H a m p to n I
T U p g ra d e s
A R
C H
R s io b h a n .b a ke r.
rv t
/1
/2
:2
:1
P
M
AE-233B
BLDG 110 THIRD FLOOR B
1/8" = 1'-0"1
BUILDING 110 THIRD FLOOR - B
CONTINUE ON SHEET AE-233A
Sheet 14 of 88Revisions: Date:
.6
STAIRS #5
DOWN
S4B-5
B431
B423b
B428
B425
B427
B429
B426
B424
B418
B406b
B405B409
B423
B421
B419
B411
B422
B420
B403B407 B401
B423a
#2
STAIRS
B402
S4B-2
B410
B434
B436
#10
B438
ELEV.
E4B-3
B435
B433a
B414
B437
B416
C404
TELE.
C400
PUBLIC
C401D
C401C
C4C-2
C401
C4C-1
C403
E4C-1 E4C-2
HAC
ELEVATORS #8 #9
C402
C405
C4C-3
B406a
B404B406B408
B410a
B420a
C4B-2
C4B-1
C4B-3
C4B-4 B413
B412
B433
CHIEF OF SURGERY
B424a
MECHANICAL
B417B.1
B417A1B417A
B417
B417B
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
AE-501
F5
Sim
HATCH BELOW DENOTES GENERAL SCOPE OF
WORK AREA IN WHICH A TEMPORARY CONTAINMENT
UNIT WILL BE USED TO ACCESS THE CEILING.
CEILING ACCESS:
1. ALL CEILING AND FLOOR FINISHES IN ALL
BUILDINGS TO MATCH EXISTING.
2. TOUCH UP PAINT IN AREAS SCUFFED OR
DAMAGED DURING…