This amendment to a solicitation provides answers to bidder questions and revises the performance work statement. The solicitation seeks whole facility rekey services for the Durham Veterans Affairs Medical Center. Key details include that the solicitation number is 36C24622Q0476, it is a 100% small business set-aside, and the requiring agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The revision removes specifications for mechanical locksets from the performance work statement as new locks are not required, only new cores and keys. It also clarifies that locations other than Durham are for information only as future locksmithing will be centralized in Durham.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised PWS 1.docx | DOCX document | |
| Revised PWS with track changes.pdf | ||
| PRESENT PAST PERFORMANCE SURVEY.docx | DOCX document | |
| VAAR 852.219-77 SEPT 2021 Deviation.docx | DOCX document | |
| QASP.docx | DOCX document | |
| 36C24622Q0476_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 8/17/2022 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders
36C24622Q0476
X X X
See CONTINUATION Page The purpose of this amendment is to answer questions and edit PWS
Amarlia Van Buren Contracting Officer
CONTINUATION PAGE
Questions and answers:
1) 2.f states, “In addition, nine (9) locations shall require new ADA-compliant hardware to bring the locations to compliance with ABAAS and Life Safety Code requirements.”
· Is it your intent to upgrade current mortise and cylindrical knobs same-for-same with ADA compliant levers?
· How many knobs do you currently estimate need to be updated for ADA compliance? How many are Mortise? How many Cylindrical?
· You have requested that knobs be replaced for ADA compliance but there is nowhere to quote that cost. Upgrading knobs to ADA compliant levers requires replacing the entire lock assembly, not just the core. Mortise and Cylindrical locks have different costs and labor to install. On the Price/Cost Schedule:
· Can you add 2 line items for the expected number of both Mortise and Cylindrical Knob replacements?
· Should we incorporate labor for knob replacements in the current installation line item, or will you create a new line item for ADA compliance installation?
· Understanding it would be an additional cost, Would the VA consider anti-microbial finish on the levers?
Mechanical door handles are not included in this contract, only lock cylinders, cores, keys, software, 2 key cutting machines etc. This contract was not intended to change or upgrade the doors to ADA requirements it was only to upgrade our cylinder locks and keying program to make the facility secure.
Durham will like to remove the below from the PWS. It was a specification that was requested to be included in the PWS, but only confuses the scope of work.
10. MECHANICAL LOCKSETS
1. SPECIFICATIONS
1. Cylindrical locksets shall be extra heavy‐duty cylindrical type with 2 3/4‐ inch backset, with a 9/16 inch throw latch bolt.
2. Cylindrical locksets shall conform to ANSI A156.2, Series 4000, Grade 1, and be UL listed for use on 3 Hr A Label swinging door.
3. Mortise lock case shall conform to ANSI A156.13, Series 1000, Grade 1 Operational and Grade 2 Security. Latch bolt shall be solid stainless steel, ¾” throw & reversible without opening case. Deadbolt is stainless steel, 1” throw.
4. Locksets shall meet or exceed ANSI A117.1
5. Permanent core face shall be the same finish as the lockset finish
6. Finish shall match existing finishing where hardware is to be replaced.
See General Specs attached 01‐00‐00, 01‐35‐26, 01‐45‐00.
2) 3.j states “At minimum prime shall be certified as a master locksmith certification and hold certified protection professional – CPP”.
Our Team currently holds a Certified Professional Locksmith certification through ALOA, Architectural Hardware Consultant (AHC) certification, and Virginia Department of Criminal Services Locksmith training and registration. We have not seen the need or benefit in pursuing the Master Locksmith Certification through ALOA or the CPP certification from ASIS. Given that our successful enterprise installations include hospitals, schools and government buildings, as well as critical infrastructure, and that our team is qualified to write and approve hardware and master key specification, can our credentials substitute, or meet the minimum requirements for those requested (CPP & MLC)?
Additionally, is it necessary for qualifications to be held by the prime contractor or is it acceptable to utilize subcontractor certifications based on their role and responsibilities for this project?
Durham would accept the sub-contractor having the master locksmithing license as long as someone working in the contract has it. They need to be an active part of the work and not just someone they know.
3) Eight (8) Associated CBOC’s:
We understand there are 8 different locations across the state in addition to the Durham VAMC. Will the VA require key machines, pinning kits, and other SFIC tools for additional locations, or is it the intent that all future locksmithing activities will be centralized in Durham? If multiple locations are to support locksmithing activities, please consider adjusting the quantity of 0006 on the price schedule.
The CBOC’s/HBOC’s question was answered with removing it from the SOW. (Leased Spaces)
4) On page 14 of 59 in the RFP/SOW, under paragraph “9. Mechanical Locksets” it has a spec for new locks.
Mechanical door handles are not included in this contract, only lock cylinders, cores, keys, software, 2 key cutting machines etc. This contract was not intended to change or upgrade the doors to ADA requirements it was only to upgrade our cylinder locks and keying program to make the facility secure.
Durham will like to remove the below from the PWS. It was a specification that was requested to be included in the PWS, but only confuses the scope of work.
10. MECHANICAL LOCKSETS
1. SPECIFICATIONS
1. Cylindrical locksets shall be extra heavy‐duty cylindrical type with 2 3/4‐ inch backset, with a 9/16 inch throw latch bolt.
2. Cylindrical locksets shall conform to ANSI A156.2, Series 4000, Grade 1, and be UL listed for use on 3 Hr A Label swinging door.
3. Mortise lock case shall conform to ANSI A156.13, Series 1000, Grade 1 Operational and Grade 2 Security. Latch bolt shall be solid stainless steel, ¾” throw & reversible without opening case. Deadbolt is stainless steel, 1” throw.
4. Locksets shall meet or exceed ANSI A117.1
5. Permanent core face shall be the same finish as the lockset finish
6. Finish shall match existing finishing where hardware is to be replaced.
See General Specs attached 01‐00‐00, 01‐35‐26, 01‐45‐00.
5) Unless I’ve overlooked it, I did not see that new locks were required anywhere in the bid documents.
Same as above.
6) Is the purpose of the RFP/SOW just to provide the VA with the new keys and cores? I want to make sure we’re providing everything you guys need on our bid.
See PWS, install new cores with patented keying system, in existing hardware
See attached document: Revised PWS 1.
See attached document: Revised PWS with track changes.
Amendment to answer questions and remove items from PWS.