36C24622Q0252 0001 RFQ Amendment signed.pdf
PDF 224 KB Posted
- Attached to
- H344--Boiler Inspection Salisbury VAMC Amendment
- Solicitation number
- 36C24622Q0252
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24622Q0252 0001_1.docx | DOCX document | |
| 36C24622Q0252 S02 Corrected DA.docx | DOCX document | |
| 36C24622Q0252_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2 36C24622Q0552
659-22-1-6049-0082
None
36C246
DeShaura Adams
Department of Veterans Affairs
Network Contracting Office 6
100 Emancipation Drive
Hampton VA 23667
Department of Veterans Affairs
Network Contracting Office 6
100 Emancipation Drive
Hampton VA 23667
To all Offerors/Bidders
36C24622Q0252
03-31-2022
X
X X
X 1
The purpose of this amendment is to answer questions received in response to the solicitation.
Please see page (2) of this amendment for further details.
Daniel Spaulding
Contracting Officer
3/31/2022
Questions/Responses
1. Please confirm that the solicitation scope of work includes only three boilers.
There are 3 boilers.
2. What is boiler availability for inspection? How many trips will be required?
One boiler per trip, which will require 3 trips.
3. For each boiler, please provide the manufacturer, model, type (water tube or fire tube), rated capacity (pounds steam per hour at what operating pressure), maximum allowable working pressure, and
National Board Number.
Manufacture: Combustion Engineering Superheater INC. Model: C-E
Vertical-unit Type: water tube Rated capacity 28,000 Maximum allowable working pressure 100 psi NB# 4212.
4. For each boiler, please provide the boiler data sheet(s) from the
Installation Operation and Maintenance Manual.
N/A
5. For each boiler, please provide the Form P-2 or P-3 Manufacturer’s
Data Report.
N/A
| 2022-03-31T16:42:39-0400 | |
| Daniel W. Spaulding 1397195 |