RFI Responses.pdf
PDF 89 KB Posted
- Attached to
- Z2DA--Site Electrical Upgrades (VA-21-00103322) Federal contract opportunity
- Solicitation number
- 36C24622B0015
About this file
This document contains responses to requests for information related to a federal contract opportunity for site electrical upgrades at the Durham VA Medical Center. The opportunity involves replacing approximately 10,000 feet of 15kV medium voltage cable lines 1 and 2 with 500 Kcmil and 4/0 ground cables between manholes according to the drawings. Some manholes contain junction breaks while others are spliced termination points. New underground ductbanks will be installed between manholes 11 and existing switch 11, and manholes 10 to garage A and manhole 11 to garage B. The bid due date is June 9, 2022 with a virtual bid opening on June 10, 2022. The opportunity is set aside for a Service-Disabled Veteran Owned Small Business and has a magnitude of construction between $1,000,000 to $2,000,000. Transformers and switches will not be replaced as part of this project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| INSTRUCTION TO BIDDERS.pdf | ||
| 36C24622B0015 0003.docx | DOCX document | |
| 36C24622B0015 0002.docx | DOCX document | |
| Project 558-20-111 Electrical Utility Condition Assessment Drawings.pdf | ||
| 36C24622B0015 0001.docx | DOCX document | |
| Combined Specification Site Electrical Upgrades Rev 2.pdf | ||
| 36C24622B0015_2.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFIs and Responses
RFIs
1. RPF page 7 states Training should include 40-hour and annual updates however spec section 01 35 26 states only OSHA 30 for supervisors and OSHA 10 for all employees. Please clarify.
2. Please clarify the COVID testing and mask requirements
3. Please provide actual conductor size of the new cable being installed as replacement of the existing cables
4. Please provide manhole lay-outs and cable routing inside manholes
5. Are some of the manholes pull through or do they all have termination points?
6. Provide pictures of existing manhole accessibility and working access inside of the manholes
Responses
1. OSHA 30 and OSHA 10 are all that are required.
2. Contracting will provide the requirements for testing.
3. 500 Kcmil and 4/0 Grounds
4. See reference Drawing attached.
5. Some manholes have junction breaks and others are spliced based on the age of the cables per the drawings in the solicitation.
6. No pictures available
7. Please confirm the solicitation’s due date. SF1442 says both June 3 and June 6. –
BID DUE DATE: Thursday, June 9, 2022 @ 10AM EST.
BID OPENING WILL BE VIRTUAL
VIRTUAL BID OPENING: FRIDAY, June 10, 2022 @ 10AM EST.
Would it be possible to get a one-line diagram showing the medium voltage cable lines 1 and 2 that are getting replaced? – see attachment
8. Are there any new ductbanks being installed other than the underground conduit manhole 11 to existing switch 11? – manhole 10 to garage A. Manhole 11 to garage B
9. Is there only one new medium voltage switch being installed at the garages as mentioned in the scope of work? 2 switches are called out in SOW.
10. What size 15KV cable are lines 1 and 2? See response on 3.
11. The scope indicates replacing all the cable 10 – 25 years indicated by green dashed line on the drawings. Is this one line and what size cable? Drawing ES101, also the scope of work identifies the work.
12. Are the old/original in need of replacement lines on the drawing lines 1 and 2 mentioned in the scope of work? Yes, in the SOW
13. Will a temporary generator be required for the cutovers? NO
14. Will any of the existing sectionalizes or transformers need to be replaced? Transformers and switches are not going to be replaced.
15. In 1.1 general intention of the specifications, it mentions repairing all fire doors in building 1 and
23. Is this part of the scope of work? If so, how many doors are there? There will be zero doors replaced in this project.