36C24621Q0191 0001.docx
DOCX document 5 MB Posted
- Attached to
- H999--Quarterly Landfill Gas Monitoring Services
- Solicitation number
- 36C24621Q0191
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5DB0DFEF.pdf | ||
| 7E3104F3 (2) 02.pdf | ||
| 36C24621Q0191_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 658-21-2-5071-0101 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 To all Offerors/Bidders
36C24621Q0191 04-22-2021
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
April 29, 2021 at 11:00 AM EST X The purpose of this amendment is to provide the government's response to the vendor(s) technical questions and to extend the closing date of the solicitation for services.
a. The solicitation closing date is hereby extended from 11 AM 4/23/2021 to 11 AM 4/29/2021.
b. See page 2 Government response to technical questions.
All other terms and conditions remain unchanged.
Rodney Wilson Contracting Officer Gas Landfill Monitoring Services Solicitation 36C24621Q0191 Questions.
1. Are there any badging or training requirements that need to be completed by the contractor prior to fieldwork mobilization? If so, approximately how long would these requirements take to complete?
Based on the frequency of the fieldwork, there is no requirement for badging or training.
1. Please describe the reporting, if any, that is required for the monthly monitoring of well LGW-5s. Will the results of this monitoring need to be reported monthly, as performed, or included in the quarterly gas monitoring report, or both?
The results shall be included in the quarterly gas monitoring report. The monitoring requirement is quarterly.
1. Is having two field staff to perform the sampling a VA requirement or is it permissible for a single field staff to perform the landfill gas sampling?
Determination of the appropriate staffing is at the discretion of the contractor. The work site is on a portion of the campus that is not continuously visited by or in view of medical center staff. The bidders should base their staffing on their own work and safety policies.
1. Will the Government have a gas monitoring instrument available for use or will contractor have to provide?
The contractor will be responsible for providing all equipment and instrumentation necessary to perform the monitoring.
1.
During the site visit, we were not able to view a well (water or landfill gas) as a key was not available to unlock the well. Please provide a photo or describe the type of connector that the landfill gas monitoring instrument will need to connect to obtain a sample. This is needed to ensure we arrive with the right equipment/accessories to perform the sampling?
This statement is incorrect. No participant at the site visit requested to have a well opened. A key was available throughout the site visit had this been requested. A photo of the connectors is attached.
1.
During the site visit, we were not able to view the location or nature of the manhole or any of the buildings where landfill gas monitoring is to be performed. Please describe the nature of the sampling that occurs at the manhole—does this involve a confined space entry or is the sample collected from the surface, or other? Does removal of the manhole lid require tools, such as an impact wrench, to unscrew bolts or other types of fasteners?
The storm manhole location is shown on the attached site map located between LGV6A and LGV7A. A photo of the manhole cover is attached. This is a standard manhole cover and does not require special tools to remove. Sampling occurring at the manhole is per VA DEQ requirements and in compliance with SWP362. Means and methods to sample in compliance with VA DEQ requirements and the permit are means and methods of the contractor.
For reports and other deliverables, are printed and bound copies required, or will electronic/digital documents be allowed for submittal both to the VA and to Virginia DEQ?
See attached document: 7E3104F3 (2) 02.
See attached document: 5DB0DFEF.
image1.emf
5DB0DFEF.jpg image2.emf
7E3104F3.jpg image3.emf
2016.7.29 Salem VAMC Compliance Boundary Relocation Map.pdf
File details come from the government source that posted it. Updated .