This asbestos reinspection report summarizes findings from inspections of 29 buildings at the W.G. Bill Hefner VA Medical Center in Salisbury, North Carolina. Inspections identified asbestos-containing materials including pipe insulation, transite panels, floor tiles, and window glazing. Locations, quantities, and condition assessments are provided along with cost estimates for response actions such as operations and maintenance, repair, and removal. Recommended actions vary by material and range from O&M to isolation and encapsulation of debris to removal. Response is to commence in October 2019. The report includes appendices with sampling data, photographs, and other supporting documentation.
36C24620R0017 0010 Asbestos Report.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24620R0017-0010028.docx | DOCX document | |
| 36C24620R0017-0010030.pdf | ||
| 36C24620R0017-0010029.pdf | ||
| 36C24620R0017-001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS REINSPECTION REPORT
LOCATION:
W.G. BILL HEFNER VA MEDICAL CENTER
1601 BRENNER AVE.
SALISBURY, NC 28144
PROJECT NO.: V06-18-102
CONTRACT: 36C24619N0872
INSPECTION DATE:
JULY 31 TO AUGUST 1, 2019
PRIME CONTRACTOR:
CASTLE HILL ASSOCIATES, LLC
218-A MECHANIC ST.
WATERVILLE, OH 43566
567-952-0212
W.G. BILL HEFNER VA MEDICAL CENTER - SALISBURY, NC
JULY-AUGUST 2019
TABLE OF CONTENTS
1.0 ASBESTOS INSPECTION REPORT
• Table 1 – List of Acronyms
• Table 2 - Removal Priority Protocols
2.0 APPENDICES
Appendix A – Asbestos Sampling Data
Appendix B – Asbestos Quantities, Assessments, & Remediation Cost Estimate
Appendix C – Photographs of Asbestos Materials
Appendix D – Asbestos Laboratory Reports
Appendix E - Inspector Certifications
Appendix F - Lab Certifications
Appendix G – Asbestos Locations and Sample Location Drawings
Appendix H – O&M Plan (Operations & Maintenance)
1.0 EXECUTIVE SUMMARY
On July 31 and August 1, 2019, Castle Hill Associates, LLC was contracted by the US Department of Veterans Affairs (VA) to perform asbestos re-inspections of 29 buildings on the site of the W.G. (Bill) Hefner VA Medical Center in Salisbury, NC. The survey was performed as part of the VA Project Number V06-18-102 under Contract 36C24618Q0693. The Performance Work Statement (PWS) issued by the VA defined the scope of work for the asbestos survey. The buildings that were surveyed as part of this project included:
Building Number Building Name/Description Total Square
Footage Year Built
CC Connect Corridors Underground Walks 26,200 1951 1 Administrative 26,888 1951 2 General Medicine 226,138 1951 Renovated 1999 3 Clinics Administrations 103,821 1951 4 Mental Health 26,888 1951 5 Kitchen Library 45,418 1951 6 Recreation 83,230 1951 (Renovated 1984) 7 PM&RS 24,784 1951 (Renovated 1993) 8 Mental Health Inpatient 79,000 2011
11 Administration 32,188 1951 (Renovated 2018) 12 Police and Security 4,875 1951 13 Residents 12,941 1951 (Renovated 1989)
14E Mental Health Transitional 3,553 1951 14W Police and Security 3,553 1951 15 Billing 14,220 1951 (Renovated 2019) 16 Linen Distribution Storage 14,297 1951 (Renovated 1982) 17 Warehouse 17,961 1951 18 Boiler Plant 13,426 1951 (Renovated 1986) 19 Chapel 4,907 1951 (Renovated 1985) 21 Medical Admin 109,865 1951 (Renovated 1985) 24 PM & RM Storage 621 1951 25 PM & RM Storage 312 1951 28 Paint Shop 1,385 1951 30 Greenhouse 2,182 1951 31 Chiller Plant 8,740 1975 (Renovated 1991) 32 Generator Building 600 1975 33 Main Switchgear 510 1975 39 Picnic Pavilion 880 1975 40 Grounds Supplies 225 1951 45 Backflow Building 400 2012 46 Backflow Building 400 2014
The inspection was conducted by Brett Brumbaugh and Sam Ansara. The project manager was Mr.
Brumbaugh who has been conducting asbestos surveys, sampling, and consulting work since 1987. He is a State of North Carolina Asbestos Inspector. Sam Ansara has been conducting asbestos surveys, sampling, and consulting work since 1989. There was a previous asbestos reinspection and sampling conducted at the facility most recently in 2018 and those reports were reviewed and utilized by Castle Hill prior to this inspection.
There were no limitations or exceptions to the PWS for the surveys conducted.
All accessible functional areas in the facilities were surveyed. All previous asbestos survey information and sampling conducted at the facilities were evaluated and incorporated into this survey. All confirmed asbestos-containing materials were verified. This report can be incorporated into the facility’s management plan for asbestos-containing materials.
2.0 STATE AND LOCAL REGULATIONS
The State of North Carolina asbestos inspection and licensing regulations are similar to the Federal regulations. State asbestos regulations include requirements for licensing and certification of personnel who will perform asbestos-related work activities. All personnel who engage in asbestos-related activities must comply with the state licensing/certification requirements as well as with all Federal requirements.
3.0 ANALYTICAL METHODS AND LIMITATIONS
3.1 Asbestos Sampling Protocol
EPA and OSHA define an ACBM as any material which contains greater than 1 percent asbestos. The ACBM inspection and bulk sampling were performed in accordance with the methods outlined in the EPA guidance document titled Guidance for Controlling Asbestos-Containing Materials in Buildings (Document No. 560/5- 85/024). In addition, bulk sampling of asbestos was performed in accordance with 40 CFR Part 763, AHERA requirements for number of samples and types of ACBM to be sampled. According to these requirements, materials are classified as either surfacing (e.g., decorative plaster, spray-applied fireproofing), thermal system insulation (e.g., pipe insulation, pipe fitting insulation, boiler insulation), or miscellaneous materials (e.g., floor tile, ceiling tile, plaster, wallboard, mastics).
The number of samples collected from each material varies based on the classification of the material and increases as the potential for a non-uniform mixture of asbestos in the material increases. Typically, regulations require a minimum number of samples to be collected from the different classifications of suspect
ACBM.
All bulk samples were analyzed utilizing current EPA methods for PLM (Polarized Light Microscopy) by EMSL Analytical in Plymouth, MI. EMSL is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.
4.0 SUMMARY OF FINDINGS
4.1 Asbestos-Containing Building Materials
The following is a summary of the asbestos containing materials, locations, quantities of materials in each inspected building for this project:
Connect Corridors Underground Walks
Asbestos Containing Materials Locations Quantity Pipe insulation on steam lines Corridor between Buildings 8 & 21 12 LF
Building 1 - Administrative
Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~2,200 LF Transite cement sheets behind radiators Under all windows on Ground, 1st, & 2nd Floors 1,560 sf
Building 2 - General Medicine lines Inaccessible wall chases and ceiling plenums ~8,100 LF Transite cement sheets behind radiators Under all windows on Ground through 5th floor 12,480 sf 12” vinyl floor tile and mastic (including under carpeting) Ground, 1st, 2nd, 3rd, 4th, and 5th floors 17,400 sf
Building 3 - Clinics Administrations lines Inaccessible wall chases and ceiling plenums ~4,300 LF Transite cement sheets behind radiators Under all windows on Ground through 4th floor 5,960 sf carpeting) Ground and 1st floors 3,620 sf
Building 4 - Mental Health lines Inaccessible wall chases and ceiling plenums ~2,100 LF Transite cement sheets behind radiators Under all windows on Ground through 4th floor 1,180 sf carpeting) Ground floor and elevator cars 1,460 sf
Building 5- Kitchen/Library lines Inaccessible wall chases and ceiling plenums ~1,320 LF Transite cement sheets behind radiators Under all windows on Ground and 1st floor 700 sf Exterior door frame caulk Exterior metal entry door frames 7 doors
Building 6 - Recreation lines Inaccessible wall chases and ceiling plenums ~1,960 LF Pipe insulation debris in soil Crawlspaces 13,550 sf Transite cement sheets behind radiators Under all windows on Ground and 1st floor 820 sf Exterior door frame caulk Exterior metal entry door frames 6 doors
Building 7 - PM&RS
• All known asbestos containing materials have been removed from this building.
Building 8 - Mental Health Inpatient
• There are no known asbestos containing materials in this building.
Building 11 - Administration lines
Basement Room G-010, G-03, and Inaccessible wall chases and ceiling plenums ~2,140 LF
Pipe insulation debris in soil (covered with poly) Crawlspaces 13,220 sf Transite cement sheets behind radiators Under all windows on 1st floor 1,140 sf
Building 12- Police lines Inaccessible wall chases and ceiling plenums ~410 LF Exterior window glazing Metal windows on 1st & 2nd floors 16 windows
Building 13 - Residents
Building 14 – Police Training Home
Exterior window glazing Metal windows on 1st & 2nd floors 16 windows
Building 15 - Billing lines Inaccessible wall chases and ceiling plenums ~380 LF
Building 16 – Linen Distribution lines Inaccessible column chases in Room 101 ~50 LF
Building 17 - Warehouse
Building 18 – Boiler Plant
Internal boiler insulation under metal jackets (assumed ACM) 3 Boilers 4,880 sf
Building 21 – Medical Administration lines Inaccessible wall chases and ceiling plenums ~5,140 LF Transite cement sheets behind radiators Under all windows on 1st floor and 2nd floors 6,460 sf
Building 24 – PM & RM Storage
Building 25 – PM & RM Storage
Building 28– Paint Shop
Building 30 – Greenhouse
Building 31 – Chiller Plant
Building 32 – Generator Building
Building 33 – Main Switchgear Building
Building 39 – Picnic Pavilion
Building 40 – Grounds Supplies
Building 45 – Backflow Building
Building 46 – Backflow Building
5.0 Explanation of Assessment of Asbestos Containing Materials
Re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700. The tabular listing included in this report contains Building Number, Floor, Room Number, Material Category (i.e., TSI, SM or MM), Material Type, quantity, a numerical priority ranking, condition, potential for damage, potential for human exposure, drawing number, hazard ranking, recommended response action and associated cost estimate for implementation of those response actions.
The material assessment categories of the ACM identified in the building is formatted in the following order for the summary tables enclosed in this report:
• Material Category - Surfacing Material (SUR); Thermal System Insulation (TSI); Miscellaneous (MM)
• Material Type - Friable (F); Non-Fable (NF)
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
• Recommended Response Action - 1 through 7
Material category is the type of material such as surfacing material (SUR), thermal system insulation (TSI), and miscellaneous (MM)
• Surfacing Material (SUR) - Surfacing ACM means surfacing material that is ACM. Surfacing material means material in a school building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
• Thermal System Insulation (TSI) - Thermal system insulation ACM means thermal system insulation that is ACM. Thermal system insulation means material in a school building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.
• Miscellaneous (MM) - Miscellaneous ACM means miscellaneous material that is ACM Miscellaneous material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.
Material type refers to the hardness of a material to be crumbled, pulverized, or reduced to powder by hand pressure as friable (F), and includes previously non-friable (NF) material after such previously non-friable material becomes damaged to the extent that when dry it may be crumbled, pulverized, or reduced to powder by hand pressure.
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
Seven Categories define in the AHERA regulation one of which must be assigned to each friable surfacing and miscellaneous ACBM and each asbestos-containing TSI during the inspection/re-inspection.
1. Damaged or significantly damaged TSI ACBM - Damaged or significantly damaged thermal system insulation ACM means thermal system insulation ACM on pipes, boilers, tanks, ducts, and other thermal system insulation equipment where the insulation has lost its structural integrity, or its covering, in whole or in part, is crushed, water-stained, gouged, punctured, missing, or not intact such that it is not able to contain fibers. Damage may be further illustrated by occasional punctures, gouges or other signs of physical injury to ACM; occasional water damage on the protective coverings/jackets; or exposed ACM ends or joints. Asbestos debris originating from the ACBM in question may also indicate damage.
2. Damaged friable surfacing ACBM - Damaged friable surfacing ACM means friable surfacing ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or which has delaminated such that its bond to the substrate (adhesion) is inadequate, or which, for any other reason, lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.
3. Significantly damaged friable surfacing ACBM - Significantly damaged friable surfacing ACM means damaged friable surfacing ACM in a functional space where the damage is extensive and severe.
4. Damaged or significantly damaged friable miscellaneous ACBM - Damaged friable miscellaneous ACM means friable miscellaneous ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or, if applicable, which has delaminated such that its bond to the substrate (adhesion) is inadequate or which for any other reason lacks fiber cohesion or adhesion qualities.
Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.
5. ACBM with Potential for Damage - Potential damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
6. ACBM with potential for significant damaged - Potential significant damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
7. Any remaining friable ACBM or Friable Suspected ACBM
6.0 EXPLANATION OF REMEDIATION COST ESTIMATES
All remediation cost (removal and repair) estimates are based upon RS Means data. Since RS Means does not account for work in VA Medical Centers, all cost estimates are adjusted to reflect the VA specific requirements for abatement. In addition, the cost estimates reflect the quantity and location of the asbestos materials. For example, abatement work in crawl spaces is expected to be much costlier than work in more accessible areas of building. Also, the costs for each material in each building are intended to be for “stand alone” projects and the combination of areas for removal will reduce the costs due to an economy of scale.
7.0 CONCLUSION/RECOMMENDATIONS
An operations and maintenance (O&M) program has been developed by the VAMC specifically for the positively identified ACBM in the facilities. Any renovation/demolition work which may impact these positive materials should be conducted in accordance with the O&M program and all applicable Federal, state, and local regulations by appropriately trained and VA-approved personnel and contractors. Since demolition was not performed as part of the inspection work at the facilities, certain areas such as pipe chases and areas above fixed permanent ceilings, fire-door interiors, and vault/safe wall and door linings were not inspected or tested. Prior to renovation and alteration work which could impact these areas, Castle Hill recommends that exploratory demolition be performed and a qualified inspector be utilized to examine the areas and collect samples as needed. Castle Hill recommends sampling of roofing materials and electrical components (not specifically examined as part of this survey) if renovation activities are planned which may disturb these materials.
Respectfully Submitted:
Brett L. Brumbaugh, REPA, CESCO State of North Carolina Asbestos Inspector License Number 12411
TABLE 1
LIST OF ACRONYMS
ACBM Asbestos Containing Building Material ACM Asbestos Containing Material AHERA Asbestos Hazard Emergency Response Act AIHA American Industrial Hygiene Association CAA Clean Air Act CFR Code of Federal Regulations EPA United States Environmental Protection Agency HazCom Hazard Communication HEPA High Efficiency Particulate Air Filter HVAC Heating, Ventilation, and Air Conditioning MISC Miscellaneous Asbestos Containing Material NESHAP National Emission Standards for Hazardous Air Pollutants NIOSH National Institute for Occupational Safety and Health NIST National Institute of Standards and Technology NOB Non-friable Organically Bound NVLAP National Voluntary Laboratory Accreditation Program OSHA Occupational Safety and Health Administration PAT AIHA Proficiency Analytical Testing Program PCM Phase Contrast Microscopy PEL Permissible Exposure Limit PLM Polarized Light Microscopy TEM Transmission Electron Microscopy TSCA Toxic Substances Control Act TSI Thermal Systems Insulation Castle Hill Castle Hill Associates, LLC VA United States Department of Veterans Affairs VAMC VA Medical Center XRD X-Ray Diffraction
TABLE 2
ASBESTOS REMOVAL PRIORITY PROTOCOLS
HAZARD
RANK
REMOVAL
PRIORITY
AHERA
CATEGORY
RESPONSE ACTION
RECOMMENDATION
7 1 Significantly Damaged
Evacuate or isolate the area.
Remove or repair if feasible.
O&M for all friable ACM.
6 2 Damaged with potential for significant damage
Evacuate or isolate the area.
Remove, encapsulate, or repair if feasible. O&M for all friable
ACM.
5 3 Damaged with potential for damage
Remove, encapsulate, or repair. O&M for all friable ACM.
4 4 Damaged Remove, encapsulate, or repair. O&M for all friable ACM.
3 5 Potential for significant damage
Take steps to reduce potential for damage. O&M for all friable
ACM.
2 6 Potential for damage O&M for all friable ACM.
1 7 No problem O&M for all friable ACM.
APPENDIX A
ASBESTOS BULK SAMPLING DATA
ASBESTOS BULK SAMPLING INFORMATION
Facility: W.G. Hefner VA Medical Center – Salisbury, NC Building: Building 4 - Mental Health Sampling Date: July 31, 2019 Analysis Dates: August 7-8, 2019 Laboratory: EMSL Analytical - Plymouth, MI Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-4 Sampler: Brett Brumbaugh Accreditation: State of North Carolina – Asbestos Inspector #12411
PLM Laboratory Analysis Result
SAMPLE
NUMBER MATERIAL SAMPLE LOCATION LABORATORY ANALYSIS
RESULT
S-1 Door frame caulk (exterior) 4th floor exit door to roof No asbestos detected
• EPA Definition of an asbestos containing material: Greater than 1% asbestos
Building: CC – Connecting Corridor Sampling Date: July 31, 2019 Analysis Dates: August 7-8, 2019 Laboratory: EMSL Analytical - Plymouth, MI Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-4
Accreditation: State of North Carolina – Asbestos Inspector #1241112411
RESULT
S-2 Steam pipe insulation N. wall of corridor from Building 8 to 21
10% Amosite Asbestos 7% Chrysotile Asbestos
Building: Building 11 - Administration Sampling Date: July 31, 2019 Analysis Dates: August 7-8, 2019 Laboratory: EMSL Analytical - Plymouth, MI Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-4
Accreditation: State of North Carolina – Asbestos Inspector #12411
RESULT
S-3 Mag block steam pipe insulation S. wall of mechanical room G-010 at wall
10% Amosite Asbestos 10% Chrysotile Asbestos
S-4 Aircell pipe insulation debris on floor Mechanical room G-010 85% Chrysotile Asbestos S-5 Spray-on insulation on ceiling Mechanical room G-010 No Asbestos Detected S-6 Transite panel behind radiator Room 128 25% Chrysotile Asbestos
Building: Building 5 – Kitchen/Library Sampling Date: July 31, 2019 Analysis Date: August 7-8, 2019 Laboratory: EMSL Analytical - Plymouth, MI Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-4
RESULT
S-7 Exterior door frame caulk Exit door on 1st floor by Mech. room 1052 6% Chrysotile Asbestos
Building: Building 6 - Recreation Sampling Date: July 31, 2019 Analysis Date: August 7-8, 2019 Laboratory: EMSL Analytical - Plymouth, MI Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-4
RESULT
S-8 Exterior door frame caulk Exit door on on ground floor by Regular Pool 2% Chrysotile Asbestos
Building: Building 12 – Police Sampling Date: July 31, 2019 Analysis Date: August 7-8, 2019 Laboratory: EMSL Analytical - Plymouth, MI Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-4
RESULT
S-13 Asphalt roofing on ground Crawl space No asbestos detected S-14 Window glazing E. window 3% Chrysotile Asbestos S-15 Window frame caulk “” No asbestos detected S-16 Popcorn acoustical ceiling spray-on Break room No asbestos detected S-17 Popcorn acoustical ceiling spray-on Hallway No asbestos detected S-18 Popcorn acoustical ceiling spray-on Dispatch No asbestos detected
Building: Building 18 – Boiler House Sampling Date: July 31, 2019 Analysis Date: August 7-8, 2019 Laboratory: EMSL Analytical - Plymouth, MI Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-4
RESULT
S-19 Upper drum insulation above boiler 1 Boiler 1 upper No asbestos detected S-20 Boiler breeching Catwalk by boiler 2 No asbestos detected S-21 Upper drum insulation above boiler 3 Boiler 3 upper No asbestos detected S-22 Storage tank – E. of boilers E. of boilers No asbestos detected S-23 12” terrazzo floor tile & mastic Lobby/entrance by control room No asbestos detected
APPENDIX B
Asbestos Quantities, Assessments, & Remediation Cost Estimates
W.G. Bill Hefner VA Medical Center - Salisbury, NC
CC - Connecting Corridors
Asbestos Assessments and Cost Estimates
July 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal
Priority Repair Cost
Estimate Removal Cost
Estimate
Pipe insulation on steam lines Corridor between Buildings 8 & 21 12 LF TSI Friable 10% 5 Repair damage at N. wall then continue O&M; Remove at renovation or demolition 3 $1,000 $3,000
TOTALS 0 $3,000
Note: The start date for all response actions is October of 2019
Building 1 - Administrative
Asbestos Assessments and Cost Estimates
July 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal
Priority Repair Cost
Estimate Removal Cost
Estimate Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~2,200 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $110,000
Transite cement sheets behind radiators Under all windows on Ground, 1st, & 2nd Floors 1,560 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $39,000
TOTALS 0 $149,000
Building 2 - General Medicine
Asbestos Assessments and Cost Estimates
July 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal
Priority Repair Cost
Estimate Removal Cost
Estimate Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~8,100 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $405,000
Transite cement sheets behind radiators Under all windows on Ground through 5th floor 12,480 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $312,000
12” vinyl floor tile and mastic (including under carpeting) Ground, 1st, 2nd, 3rd, 4th, and 5th floors 17,400 sf MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $87,000
TOTALS 0 $804,000
Building 3 - Clinics Administrations
Asbestos Assessments and Cost Estimates
July 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal
Priority Repair Cost
Estimate Removal Cost
Estimate Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~4,300 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $215,000
Transite cement sheets behind radiators Under all windows on Ground through 4th floor 5,960 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $149,000
12” vinyl floor tile and mastic (including under carpeting) Ground and 1st floors 3,620 sf MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $18,100
TOTALS 0 $382,100
Building 4 - Mental Health
Asbestos Assessments and Cost Estimates
July 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal
Priority Repair Cost
Estimate Removal Cost
Estimate Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~2,100 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $105,000
Transite cement sheets behind radiators Under all windows on Ground through 4th floor 1,180 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $29,500
12” vinyl floor tile and mastic (including under carpeting) Ground floor and elevator cars 1,460 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,300
TOTALS 0 $141,800
Building 5- Kitchen/Library
Asbestos Assessments and Cost Estimates
July 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal
Priority Repair Cost
Estimate Removal Cost
Estimate Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~1,320 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $66,000
Transite cement sheets behind radiators Under all windows on Ground and 1st floor 700 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $17,500
Exterior door frame caulk Exterior metal entry door frames 7 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,000
TOTALS 0 $90,500
Building 6 - Recreation
Asbestos Assessments and Cost Estimates
July 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal
Priority Repair Cost
Estimate Removal Cost
Estimate Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~1,960 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $98,000
Pipe insulation debris in soil (covered with poly) Crawlspaces 13,550 sf TSI Friable 100% 7
Isolate crawl spaces and place signs at all entrances.
Require PPE for entrance to crawl. Encapsulate soil with spray foam or lightweight concrete, or remove soil to depth of 3".
1 $202,000 $270,000
Transite cement sheets behind radiators Under all windows on Ground and 1st floor 820 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $20,000
Exterior door frame caulk Exterior metal entry door frames 6 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $6,000
TOTALS 0 $394,000
Building 11 - Administration
Asbestos Assessments and Cost Estimates
July 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal Priority Repair Cost
Estimate
Removal Cost
Estimate
Pipe insulation on steam and domestic water lines
Basement Room G-010, G-03, and Inaccessible wall chases and ceiling plenums
~2,140 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $107,000
Pipe insulation debris in soil Crawlspaces 13,220 sf TSI Friable 100% 7
Isolate crawl spaces and place signs at all entrances. Require PPE for entrance to crawl. Encapsulate soil with spray foam or lightweight concrete, or remove soil to depth of 3".
1 $198,000 $260,000
Transite cement sheets behind radiators Under all windows on 1st floor 1,140 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $28,500
TOTALS 0 $395,500
Building 12- Police
Asbestos Assessments and Cost Estimates
July 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal Priority Repair Cost
Estimate
Removal Cost
Estimate Pipe insulation on steam and domestic water lines
Inaccessible wall chases and ceiling plenums ~410 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $20,500
Exterior window glazing Metal windows on 1st & 2nd floors 16 windows MISC Friable 25% 4 Paint over loose glazing then continue O&M; Remove at renovation or demolition
4 No damage $4,000
TOTALS $0 $24,500
Building 13 - Residents
Asbestos Assessments and Cost Estimates
July 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal Priority Repair Cost
Estimate
Removal Cost
Estimate Pipe insulation on steam and domestic water lines
Inaccessible wall chases and ceiling plenums ~410 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $20,500
TOTALS $0 $20,500
Building 14 - Police Training House
\Asbestos Assessments and Cost Estimates
July 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal Priority Repair Cost
Estimate
Removal Cost
Estimate
Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~410 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $20,500
Exterior window glazing Metal windows on 1st & 2nd floors 16 windows MISC Friable 25% 4
Paint over loose glazing then continue O&M; Remove at renovation or demolition
4 No damage $4,000
TOTALS $0 $24,500
Building 15 - Billing
Asbestos Assessments and Cost Estimates
July 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal Priority Repair Cost
Estimate
Removal Cost
Estimate
Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums 380 lf TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $19,000
TOTALS $0 $19,000
Building 16 – Linen Distribution
Asbestos Assessments and Cost Estimates
July 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal Priority Repair Cost
Estimate
Removal Cost
Estimate
Pipe insulation on steam and domestic water lines Inaccessible column chases in Room 101 ~50 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $3,000
TOTALS 0 $3,000
Building 18 - Boiler Plant
Asbestos Assessments and Cost Estimates
July 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal Priority Repair Cost
Estimate
Removal Cost
Estimate Internal boiler insulation under metal jackets (assumed ACM) 3 Boilers 4,880 sf TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $366,000
TOTALS 0 $366,000
Building 21 – Medical Administration
Asbestos Assessments and Cost Estimates
July 2019
Asbestos Material Locations Quantity AHERA Category
Friability %Damage
AHERA
Assessment Recommendation Removal Priority Repair Cost
Estimate
Removal Cost
Estimate Pipe insulation on steam and domestic water lines
Inaccessible wall chases and ceiling plenums ~5,140 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $257,000
Transite cement sheets behind radiators Under all windows on 1st floor and 2nd floors 6,460 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $161,000
TOTALS 0 $418,000
APPENDIX C
PHOTOGRAPHS OF ASBESTOS MATERIALS
Connect Corridors Underground Walks
Photo CC-1
Pipe insulation on steam lines
BUILDING 2 - GENERAL MEDICINE
Photo 2-1
Transite cement sheets behind radiators
Photo 2-2
12” vinyl floor tile and mastic (including under carpeting)
BUILDING 3 - CLINICS ADMINISTRATIONS
Photo 3-1
Photo 3-2
BUILDING 4 - MENTAL HEALTH
Photo 4-1
Photo 4-2
BUILDING 5 - KITCHEN/LIBRARY
Photo 5-1
Photo 5-2
Exterior door frame caulk
BUILDING 6 - RECREATION
Photo 6-1
Photo 6-2
Exterior door frame caulk
Photo 6-3
Pipe insulation debris in soil
BUILDING 11 - ADMINISTRATION
Photo 11-1
Pipe insulation on steam lines at wall penetrations in mechanical room G-101
Photo 11-2
Pipe insulation debris on floor of mechanical room G-101
Photo 11-3
Pipe insulation debris in soil
Photo 11-4
BUILDING 12- POLICE
Photo 12-1
Exterior window glazing
BUILDING 14 – POLICE TRAINING HOME
Photo 14-1
Exterior window glazing
BUILDING 16 – LINEN DISTRIBUTION
Photo 16-1
Pipe insulation on steam and domestic water lines behind block walls
BUILDING 18 – BOILER PLANT
Photo 18-1
Internal boiler insulation under metal jackets (assumed ACM)
Photo 18-2
Internal boiler insulation under metal jackets (assumed ACM)
APPENDIX D
ASBESTOS LABORATORY REPORTS
EMSL Analytical, Inc.
15111 Northville Rd Plymouth, MI 48170
Tel/Fax: (734) 668-6810 / (734) 668-8532 http://www.EMSL.com / annarborlab@emsl.com
081902309EMSL Order:
Customer ID: CHAS42
Customer PO: VISN6
Project ID:
Attention: Phone:Brett Brumbaugh (567) 952-0212
Fax:Castle Hill Associates, LLC
Received Date:218-A Mechanic St. 08/05/2019 8:10 AM
Analysis Date:Waterville, OH 43566 08/07/2019 - 08/08/2019
Collected Date:
Project: VISN 6 - Ashville & Salisbury VA
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
081902309-0001
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
081902309-0002
None DetectedQuartz
Non-fibrous (Other)
3%
97%
Tan/White
Non-Fibrous
Heterogeneous
Inseperable layers
081902309-0003
None DetectedQuartz
Non-fibrous (Other)
3%
97%
Tan/White
Non-Fibrous
Heterogeneous
Inseperable layers
081902309-0004
None DetectedNon-fibrous (Other)100%Tan/White
Non-Fibrous
Homogeneous
081902309-0005
None DetectedMica
Non-fibrous (Other)
2%
98%
White
Non-Fibrous
Homogeneous
081902309-0006
None DetectedMica
Non-fibrous (Other)
<1%
100%
White
Non-Fibrous
Homogeneous
081902309-0007
None DetectedMica
Non-fibrous (Other)
<1%
100%
White
Non-Fibrous
Homogeneous
081902309-0008
None DetectedNon-fibrous (Other)86%Cellulose14%Gray/Beige
Fibrous
Heterogeneous
Fiberboard A
081902309-0008A
None DetectedQuartz
Non-fibrous (Other)
2%
98%
Gray
Non-Fibrous
Homogeneous
Fiberboard B
081902309-0009
None DetectedQuartz
Non-fibrous (Other)
3%
97%
Gray
Non-Fibrous
Homogeneous
081902309-0010
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
081902309-0011
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
081902309-0012
None DetectedNon-fibrous (Other)82%Cellulose18%Gray/Tan
Fibrous
Heterogeneous
081902309-0013
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Cove Base
081902309-0013A
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Adhesive
Initial report from: 08/08/2019 08:06:09
Page 1 of 4ASB_PLM_0008_0001 - 1.78 Printed: 8/8/2019 8:06 AM
Tel/Fax: (734) 668-6810 / (734) 668-8532 http://www.EMSL.com / annarborlab@emsl.com
081902309EMSL Order:
Customer ID: CHAS42
Customer PO: VISN6
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
081902309-0014
None DetectedNon-fibrous (Other)100%Black/Beige
Non-Fibrous
Heterogeneous
081902309-0015
None DetectedQuartz
Non-fibrous (Other)
2%
98%
Tan/Beige
Non-Fibrous
Heterogeneous
Inseperable layers
081902309-0016
None DetectedNon-fibrous (Other)100%Tan/Beige
Non-Fibrous
Homogeneous
081902309-0017
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
081902309-0018
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Floor Tile
081902309-0018A
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Adhesive
081902309-0019
None DetectedNon-fibrous (Other)92%Cellulose8%Brown/Blue
Fibrous
Heterogeneous
081902309-0020
None DetectedNon-fibrous (Other)100%Beige/Rust
Non-Fibrous
Homogeneous
081902309-0021
None DetectedQuartz
Non-fibrous (Other)
<1%
88%
Cellulose12%Gray
Fibrous
Heterogeneous
081902309-0022
None DetectedNon-fibrous (Other)2%Cellulose98%Brown
Fibrous
Homogeneous
081902309-0023
None DetectedNon-fibrous (Other)2%Cellulose98%Brown
Fibrous
Homogeneous
081902309-0024
None DetectedNon-fibrous (Other)17%Min. Wool83%White
Fibrous
Homogeneous
081902309-0025
None DetectedNon-fibrous (Other)20%Min. Wool80%White
Fibrous
Homogeneous
081902309-0026
None DetectedNon-fibrous (Other)5%Min. Wool95%Gray
Fibrous
Homogeneous
081902309-0027
None DetectedMica
Non-fibrous (Other)
2%
98%
White
Non-Fibrous
Homogeneous
S1
081902309-0028
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
S2
081902309-0029
10%
7%
Amosite
Chrysotile
Non-fibrous (Other)83%White
Fibrous
Homogeneous
S3
081902309-0030
10%
10%
Amosite
Chrysotile
Non-fibrous (Other)80%White
Fibrous
Homogeneous
Page 2 of 4ASB_PLM_0008_0001 - 1.78 Printed: 8/8/2019 8:06 AM
Tel/Fax: (734) 668-6810 / (734) 668-8532 http://www.EMSL.com / annarborlab@emsl.com
081902309EMSL Order:
Customer ID: CHAS42
Customer PO: VISN6
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
S4
081902309-0031
85% ChrysotileNon-fibrous (Other)15%Gray/White/Beige
Fibrous
Homogeneous
S5
081902309-0032
None DetectedNon-fibrous (Other)5%Cellulose95%Brown/Tan
Fibrous
Homogeneous
S6
081902309-0033
25% ChrysotileNon-fibrous (Other)75%Gray/White
Fibrous
Homogeneous
S7
081902309-0034
6% ChrysotileNon-fibrous (Other)94%Brown/Gray/White
Fibrous
Homogeneous
S8
081902309-0035
2% ChrysotileNon-fibrous (Other)98%Brown/Gray/White
Non-Fibrous
Homogeneous
S9
081902309-0036
3% ChrysotileNon-fibrous (Other)97%Gray/White/Black
Non-Fibrous
Homogeneous
S10
081902309-0037
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Caulk
S10
081902309-0037A
None DetectedNon-fibrous (Other)89%Wollastonite
Fibrous (Other)
3%
8%
Brown/Gray/White
Non-Fibrous
Homogeneous
Glazing
S11
081902309-0038
3% ChrysotileNon-fibrous (Other)97%Gray/White
Non-Fibrous
Homogeneous
S12
081902309-0039
None DetectedNon-fibrous (Other)100%Gray/White
Non-Fibrous
Homogeneous
S13
081902309-0040
None DetectedMica
Non-fibrous (Other)
2%
63%
Cellulose35%Tan/Red/Black
Fibrous
Heterogeneous
S14
081902309-0041
4% ChrysotileNon-fibrous (Other)96%Gray/Various
Non-Fibrous
Homogeneous
S15
081902309-0042
None DetectedNon-fibrous (Other)100%Gray/White
Non-Fibrous
Homogeneous
Caulk
S15
081902309-0042A
None DetectedNon-fibrous (Other)89%Wollastonite
Fibrous (Other)
3%
8%
Gray/Various
Non-Fibrous
Homogeneous
Glazing
S16
081902309-0043
None DetectedMica
Non-fibrous (Other)
<1%
100%
White
Non-Fibrous
Homogeneous
S17
081902309-0044
None DetectedMica
Non-fibrous (Other)
<1%
100%
White
Non-Fibrous
Homogeneous
S18
081902309-0045
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
S19
081902309-0046
None DetectedNon-fibrous (Other)65%Cellulose
Min. Wool
15%
20%
Gray/White
Non-Fibrous
Homogeneous
S20
081902309-0047
None DetectedNon-fibrous (Other)83%Cellulose
Min. Wool
2%
15%
Gray
Fibrous
Homogeneous
Page 3 of 4ASB_PLM_0008_0001 - 1.78 Printed: 8/8/2019 8:06 AM
Tel/Fax: (734) 668-6810 / (734) 668-8532 http://www.EMSL.com / annarborlab@emsl.com
081902309EMSL Order:
Customer ID: CHAS42
Customer PO: VISN6
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
S21
081902309-0048
None DetectedNon-fibrous (Other)85%Cellulose
Min. Wool
6%
9%
Gray/White
Fibrous
Homogeneous
S22
081902309-0049
None DetectedNon-fibrous (Other)85%Min. Wool15%Gray
Fibrous
Homogeneous
S23
081902309-0050
None DetectedNon-fibrous (Other)100%Gray/Black
Non-Fibrous
Homogeneous
S24
081902309-0051
None DetectedNon-fibrous (Other)85%Min. Wool15%Gray
Fibrous
Homogeneous
S25
081902309-0052
None DetectedNon-fibrous (Other)100%Blue
Non-Fibrous
Homogeneous
Analyst(s)
Conner Frymier (26)
Rebecca Newman (30)
Waverly Ferguson (1)
Ryan Shannon, Laboratory Manager or Other Approved Signatory
EMSL maintains liability limited to cost of analysis . The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 "Interim
Method"), but augmented with procedures outlined in the 1993 ("final") version of the method. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . Interpretation and use of test results are the responsibility of the client. All samples received in acceptable condition unless otherwise noted. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. EMSL recommends gravimetric reduction for all non -friable organically bound materials prior to analysis. Estimation of uncertainty is available on request.
Samples analyzed by EMSL Analytical, Inc. Plymouth, MI NVLAP Lab Code 101048-4
Page 4 of 4ASB_PLM_0008_0001 - 1.78 Printed: 8/8/2019 8:06 AM
OrderID: 081902309
APPENDIX E
INSPECTOR CERTIFICATIONS
APPENDIX F
LAB CERTIFICATIONS
APPENDIX G
ASBESTOS LOCATIONS & SAMPLE LOCATION DRAWINGS
CASTLE HILL ASSOCIATES, LLC.
DEPARTMENT OF VETERANS AFFAIRS
W.G. (BILL) HEFNER VA MEDICAL CENTER
SALISBURY, NORTH CAROLINA
2019 ASBESTOS REINSPECTION
VA CONTRACT NUMBER: 36C24619N0872
LEGEND
ABC
PROJECT V06-18-102 VISN ASBESTOS SURVEY
ASBESTOS CONTAINING MATERIALS NOT SHOWN ON DRAWINGS
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved : Division Chief
AutoCAD SHX Text Approved : Service Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Building Number
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text Department of
AutoCAD SHX Text Office of Facilities
AutoCAD SHX Text
AutoCAD SHX Text Drawn
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text Sheet 01 of 32
AutoCAD SHX Text Revisions
AutoCAD SHX Text Professional Seal:
AutoCAD SHX Text FACILITY ASBESTOS RE-SURVEY VETERANS ADMINISTRATION MEDICAL CENTER SALISBURY, NORTH CAROLINA
AutoCAD SHX Text V06-18-102
AutoCAD SHX Text
JULY 2019
AutoCAD SHX Text
AFS
AutoCAD SHX Text
BLB
AutoCAD SHX Text
SALISBURY, NORTH CAROLINA
AutoCAD SHX Text Dates
AutoCAD SHX Text
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text North:
AutoCAD SHX Text
CS
AutoCAD SHX Text
ASBESTOS-CONTAINING PIPE INSULATION ON STEAM OR DOMESTIC WATER LINES
AutoCAD SHX Text
ASBESTOS-CONTAINING 12" OR 9" VINYL FLOOR TILE AND/OR BLACK MASTIC
AutoCAD SHX Text ASBESTOS-CONTAINING PIPE INSULATION IN PLASTER WALL CHASES AND ABOVE PLASTER WALLS
AutoCAD SHX Text
ASBESTOS-CONTAINING TRANSITE CEMENT SHEETS BEHIND RADIATORS BELOW ALL WINDOWS
AutoCAD SHX Text
ASBESTOS-CONTAINING WINDOW GLAZE ON ALL WINDOWS
AutoCAD SHX Text
ASBESTOS-CONTAINING 12" VINYL FLOOR TILE (NEGATIVE MASTIC)
AutoCAD SHX Text
ASBESTOS-CONTAINING 12" VINYL FLOOR TILE AND BLACK MASTIC
AutoCAD SHX Text
ASBESTOS-CONTAINING BLACK MASTIC UNDER NON-ASBESTOS FLOOR TILE
AutoCAD SHX Text
ASBESTOS-CONTAINING WINDOW GLAZING
AutoCAD SHX Text
ASBESTOS-CONTAINING MUDDED FITTINGS ON FIBERGLASS INSULATED PIPES
AutoCAD SHX Text
ASBESTOS-CONTAINING PIPE INSULATION DEBRIS IN SOIL/DIRT IN CRAWL SPACE
N
S
W
E
BUILDING #1 - GROUND FLOOR PLAN BUILDING #1 - FIRST FLOOR PLAN
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved : Division Chief
AutoCAD SHX Text Approved : Service Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Building Number
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text Department of
AutoCAD SHX Text Office of Facilities
AutoCAD SHX Text
AutoCAD SHX Text Drawn
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text Sheet 02 of 32
AutoCAD SHX Text Revisions
AutoCAD SHX Text Professional Seal:
AutoCAD SHX Text FACILITY ASBESTOS RE-SURVEY VETERANS ADMINISTRATION MEDICAL CENTER SALISBURY, NORTH CAROLINA
AutoCAD SHX Text V06-18-102
AutoCAD SHX Text
JULY 2019
AutoCAD SHX Text
AFS
AutoCAD SHX Text
BLB
AutoCAD SHX Text
SALISBURY, NORTH CAROLINA
AutoCAD SHX Text Dates
AutoCAD SHX Text
AutoCAD SHX Text ARCHITECTURAL PLAN BUILDING 1 Scale: 1/16" = 1'-0"" = 1'-0"
AutoCAD SHX Text North:
AutoCAD SHX Text 1A
AutoCAD SHX Text NOT SHOWN: ASBESTOS-CONTAINING PIPE INSULATION IN PLASTER WALL CHASES AND ABOVE PLASTER WALLS.
AutoCAD SHX Text
NOTE:
NOT SHOWN: ASBESTOS-CONTAINING TRANSITE CEMENT SHEETS BEHIND RADIATORS BELOW ALL WINDOWS.
S
W
E
BUILDING #1 - SECOND FLOOR PLAN BUILDING #1 - ROOF PLAN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved : Division Chief
AutoCAD SHX Text Approved : Service Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Building Number
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text Department of
AutoCAD SHX Text Office of Facilities
AutoCAD SHX Text
AutoCAD SHX Text Drawn
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text Sheet 03 of 32
AutoCAD SHX Text Revisions
AutoCAD SHX Text Professional Seal:
AutoCAD SHX Text…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .