36C24620R0017-0010031.pdf

PDF Posted

Attached to
Y1DA--Amendment-RFP Extension
Solicitation number
36C24620R0017
Issued by

About this file

This asbestos reinspection report summarizes findings from inspections of 29 buildings at the W.G. Bill Hefner VA Medical Center in Salisbury, North Carolina. Inspections identified asbestos-containing materials including pipe insulation, transite panels, floor tiles, and window glazing. Locations, quantities, and condition assessments are provided along with cost estimates for response actions such as operations and maintenance, repair, and removal. Recommended actions vary by material and range from O&M to isolation and encapsulation of debris to removal. Response is to commence in October 2019. The report includes appendices with sampling data, photographs, and other supporting documentation.

36C24620R0017 0010 Asbestos Report.pdf

View the file

Other files

File Type Posted
36C24620R0017-0010028.docx DOCX document
36C24620R0017-0010030.pdf PDF
36C24620R0017-0010029.pdf PDF
36C24620R0017-001.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS REINSPECTION REPORT

LOCATION:

W.G. BILL HEFNER VA MEDICAL CENTER

1601 BRENNER AVE.

SALISBURY, NC 28144

PROJECT NO.: V06-18-102

CONTRACT: 36C24619N0872

INSPECTION DATE:

JULY 31 TO AUGUST 1, 2019

PRIME CONTRACTOR:

CASTLE HILL ASSOCIATES, LLC

218-A MECHANIC ST.

WATERVILLE, OH 43566

567-952-0212

W.G. BILL HEFNER VA MEDICAL CENTER - SALISBURY, NC

JULY-AUGUST 2019

TABLE OF CONTENTS

1.0 ASBESTOS INSPECTION REPORT

• Table 1 – List of Acronyms

• Table 2 - Removal Priority Protocols

2.0 APPENDICES

Appendix A – Asbestos Sampling Data

Appendix B – Asbestos Quantities, Assessments, & Remediation Cost Estimate

Appendix C – Photographs of Asbestos Materials

Appendix D – Asbestos Laboratory Reports

Appendix E - Inspector Certifications

Appendix F - Lab Certifications

Appendix G – Asbestos Locations and Sample Location Drawings

Appendix H – O&M Plan (Operations & Maintenance)

1.0 EXECUTIVE SUMMARY

On July 31 and August 1, 2019, Castle Hill Associates, LLC was contracted by the US Department of Veterans Affairs (VA) to perform asbestos re-inspections of 29 buildings on the site of the W.G. (Bill) Hefner VA Medical Center in Salisbury, NC. The survey was performed as part of the VA Project Number V06-18-102 under Contract 36C24618Q0693. The Performance Work Statement (PWS) issued by the VA defined the scope of work for the asbestos survey. The buildings that were surveyed as part of this project included:

Building Number Building Name/Description Total Square

Footage Year Built

CC Connect Corridors Underground Walks 26,200 1951 1 Administrative 26,888 1951 2 General Medicine 226,138 1951 Renovated 1999 3 Clinics Administrations 103,821 1951 4 Mental Health 26,888 1951 5 Kitchen Library 45,418 1951 6 Recreation 83,230 1951 (Renovated 1984) 7 PM&RS 24,784 1951 (Renovated 1993) 8 Mental Health Inpatient 79,000 2011

11 Administration 32,188 1951 (Renovated 2018) 12 Police and Security 4,875 1951 13 Residents 12,941 1951 (Renovated 1989)

14E Mental Health Transitional 3,553 1951 14W Police and Security 3,553 1951 15 Billing 14,220 1951 (Renovated 2019) 16 Linen Distribution Storage 14,297 1951 (Renovated 1982) 17 Warehouse 17,961 1951 18 Boiler Plant 13,426 1951 (Renovated 1986) 19 Chapel 4,907 1951 (Renovated 1985) 21 Medical Admin 109,865 1951 (Renovated 1985) 24 PM & RM Storage 621 1951 25 PM & RM Storage 312 1951 28 Paint Shop 1,385 1951 30 Greenhouse 2,182 1951 31 Chiller Plant 8,740 1975 (Renovated 1991) 32 Generator Building 600 1975 33 Main Switchgear 510 1975 39 Picnic Pavilion 880 1975 40 Grounds Supplies 225 1951 45 Backflow Building 400 2012 46 Backflow Building 400 2014

The inspection was conducted by Brett Brumbaugh and Sam Ansara. The project manager was Mr.

Brumbaugh who has been conducting asbestos surveys, sampling, and consulting work since 1987. He is a State of North Carolina Asbestos Inspector. Sam Ansara has been conducting asbestos surveys, sampling, and consulting work since 1989. There was a previous asbestos reinspection and sampling conducted at the facility most recently in 2018 and those reports were reviewed and utilized by Castle Hill prior to this inspection.

There were no limitations or exceptions to the PWS for the surveys conducted.

All accessible functional areas in the facilities were surveyed. All previous asbestos survey information and sampling conducted at the facilities were evaluated and incorporated into this survey. All confirmed asbestos-containing materials were verified. This report can be incorporated into the facility’s management plan for asbestos-containing materials.

2.0 STATE AND LOCAL REGULATIONS

The State of North Carolina asbestos inspection and licensing regulations are similar to the Federal regulations. State asbestos regulations include requirements for licensing and certification of personnel who will perform asbestos-related work activities. All personnel who engage in asbestos-related activities must comply with the state licensing/certification requirements as well as with all Federal requirements.

3.0 ANALYTICAL METHODS AND LIMITATIONS

3.1 Asbestos Sampling Protocol

EPA and OSHA define an ACBM as any material which contains greater than 1 percent asbestos. The ACBM inspection and bulk sampling were performed in accordance with the methods outlined in the EPA guidance document titled Guidance for Controlling Asbestos-Containing Materials in Buildings (Document No. 560/5- 85/024). In addition, bulk sampling of asbestos was performed in accordance with 40 CFR Part 763, AHERA requirements for number of samples and types of ACBM to be sampled. According to these requirements, materials are classified as either surfacing (e.g., decorative plaster, spray-applied fireproofing), thermal system insulation (e.g., pipe insulation, pipe fitting insulation, boiler insulation), or miscellaneous materials (e.g., floor tile, ceiling tile, plaster, wallboard, mastics).

The number of samples collected from each material varies based on the classification of the material and increases as the potential for a non-uniform mixture of asbestos in the material increases. Typically, regulations require a minimum number of samples to be collected from the different classifications of suspect

ACBM.

All bulk samples were analyzed utilizing current EPA methods for PLM (Polarized Light Microscopy) by EMSL Analytical in Plymouth, MI. EMSL is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.

4.0 SUMMARY OF FINDINGS

4.1 Asbestos-Containing Building Materials

The following is a summary of the asbestos containing materials, locations, quantities of materials in each inspected building for this project:

Connect Corridors Underground Walks

Asbestos Containing Materials Locations Quantity Pipe insulation on steam lines Corridor between Buildings 8 & 21 12 LF

Building 1 - Administrative

Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~2,200 LF Transite cement sheets behind radiators Under all windows on Ground, 1st, & 2nd Floors 1,560 sf

Building 2 - General Medicine lines Inaccessible wall chases and ceiling plenums ~8,100 LF Transite cement sheets behind radiators Under all windows on Ground through 5th floor 12,480 sf 12” vinyl floor tile and mastic (including under carpeting) Ground, 1st, 2nd, 3rd, 4th, and 5th floors 17,400 sf

Building 3 - Clinics Administrations lines Inaccessible wall chases and ceiling plenums ~4,300 LF Transite cement sheets behind radiators Under all windows on Ground through 4th floor 5,960 sf carpeting) Ground and 1st floors 3,620 sf

Building 4 - Mental Health lines Inaccessible wall chases and ceiling plenums ~2,100 LF Transite cement sheets behind radiators Under all windows on Ground through 4th floor 1,180 sf carpeting) Ground floor and elevator cars 1,460 sf

Building 5- Kitchen/Library lines Inaccessible wall chases and ceiling plenums ~1,320 LF Transite cement sheets behind radiators Under all windows on Ground and 1st floor 700 sf Exterior door frame caulk Exterior metal entry door frames 7 doors

Building 6 - Recreation lines Inaccessible wall chases and ceiling plenums ~1,960 LF Pipe insulation debris in soil Crawlspaces 13,550 sf Transite cement sheets behind radiators Under all windows on Ground and 1st floor 820 sf Exterior door frame caulk Exterior metal entry door frames 6 doors

Building 7 - PM&RS

• All known asbestos containing materials have been removed from this building.

Building 8 - Mental Health Inpatient

• There are no known asbestos containing materials in this building.

Building 11 - Administration lines

Basement Room G-010, G-03, and Inaccessible wall chases and ceiling plenums ~2,140 LF

Pipe insulation debris in soil (covered with poly) Crawlspaces 13,220 sf Transite cement sheets behind radiators Under all windows on 1st floor 1,140 sf

Building 12- Police lines Inaccessible wall chases and ceiling plenums ~410 LF Exterior window glazing Metal windows on 1st & 2nd floors 16 windows

Building 13 - Residents

Building 14 – Police Training Home

Exterior window glazing Metal windows on 1st & 2nd floors 16 windows

Building 15 - Billing lines Inaccessible wall chases and ceiling plenums ~380 LF

Building 16 – Linen Distribution lines Inaccessible column chases in Room 101 ~50 LF

Building 17 - Warehouse

Building 18 – Boiler Plant

Internal boiler insulation under metal jackets (assumed ACM) 3 Boilers 4,880 sf

Building 21 – Medical Administration lines Inaccessible wall chases and ceiling plenums ~5,140 LF Transite cement sheets behind radiators Under all windows on 1st floor and 2nd floors 6,460 sf

Building 24 – PM & RM Storage

Building 25 – PM & RM Storage

Building 28– Paint Shop

Building 30 – Greenhouse

Building 31 – Chiller Plant

Building 32 – Generator Building

Building 33 – Main Switchgear Building

Building 39 – Picnic Pavilion

Building 40 – Grounds Supplies

Building 45 – Backflow Building

Building 46 – Backflow Building

5.0 Explanation of Assessment of Asbestos Containing Materials

Re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700. The tabular listing included in this report contains Building Number, Floor, Room Number, Material Category (i.e., TSI, SM or MM), Material Type, quantity, a numerical priority ranking, condition, potential for damage, potential for human exposure, drawing number, hazard ranking, recommended response action and associated cost estimate for implementation of those response actions.

The material assessment categories of the ACM identified in the building is formatted in the following order for the summary tables enclosed in this report:

• Material Category - Surfacing Material (SUR); Thermal System Insulation (TSI); Miscellaneous (MM)

• Material Type - Friable (F); Non-Fable (NF)

• Condition of Material - Good; Fair; Poor

• Potential for Damage - Low; Medium; High

• Physical Assessment - Low; Medium; High

• Recommended Response Action - 1 through 7

Material category is the type of material such as surfacing material (SUR), thermal system insulation (TSI), and miscellaneous (MM)

• Surfacing Material (SUR) - Surfacing ACM means surfacing material that is ACM. Surfacing material means material in a school building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.

• Thermal System Insulation (TSI) - Thermal system insulation ACM means thermal system insulation that is ACM. Thermal system insulation means material in a school building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.

• Miscellaneous (MM) - Miscellaneous ACM means miscellaneous material that is ACM Miscellaneous material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.

Material type refers to the hardness of a material to be crumbled, pulverized, or reduced to powder by hand pressure as friable (F), and includes previously non-friable (NF) material after such previously non-friable material becomes damaged to the extent that when dry it may be crumbled, pulverized, or reduced to powder by hand pressure.

• Condition of Material - Good; Fair; Poor

• Potential for Damage - Low; Medium; High

• Physical Assessment - Low; Medium; High

Seven Categories define in the AHERA regulation one of which must be assigned to each friable surfacing and miscellaneous ACBM and each asbestos-containing TSI during the inspection/re-inspection.

1. Damaged or significantly damaged TSI ACBM - Damaged or significantly damaged thermal system insulation ACM means thermal system insulation ACM on pipes, boilers, tanks, ducts, and other thermal system insulation equipment where the insulation has lost its structural integrity, or its covering, in whole or in part, is crushed, water-stained, gouged, punctured, missing, or not intact such that it is not able to contain fibers. Damage may be further illustrated by occasional punctures, gouges or other signs of physical injury to ACM; occasional water damage on the protective coverings/jackets; or exposed ACM ends or joints. Asbestos debris originating from the ACBM in question may also indicate damage.

2. Damaged friable surfacing ACBM - Damaged friable surfacing ACM means friable surfacing ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or which has delaminated such that its bond to the substrate (adhesion) is inadequate, or which, for any other reason, lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.

3. Significantly damaged friable surfacing ACBM - Significantly damaged friable surfacing ACM means damaged friable surfacing ACM in a functional space where the damage is extensive and severe.

4. Damaged or significantly damaged friable miscellaneous ACBM - Damaged friable miscellaneous ACM means friable miscellaneous ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or, if applicable, which has delaminated such that its bond to the substrate (adhesion) is inadequate or which for any other reason lacks fiber cohesion or adhesion qualities.

Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.

5. ACBM with Potential for Damage - Potential damage means circumstances in which:

(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.

(2) There are indications that there is a reasonable likelihood that the material or its covering will become damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.

6. ACBM with potential for significant damaged - Potential significant damage means circumstances in which:

(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.

(2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.

7. Any remaining friable ACBM or Friable Suspected ACBM

6.0 EXPLANATION OF REMEDIATION COST ESTIMATES

All remediation cost (removal and repair) estimates are based upon RS Means data. Since RS Means does not account for work in VA Medical Centers, all cost estimates are adjusted to reflect the VA specific requirements for abatement. In addition, the cost estimates reflect the quantity and location of the asbestos materials. For example, abatement work in crawl spaces is expected to be much costlier than work in more accessible areas of building. Also, the costs for each material in each building are intended to be for “stand alone” projects and the combination of areas for removal will reduce the costs due to an economy of scale.

7.0 CONCLUSION/RECOMMENDATIONS

An operations and maintenance (O&M) program has been developed by the VAMC specifically for the positively identified ACBM in the facilities. Any renovation/demolition work which may impact these positive materials should be conducted in accordance with the O&M program and all applicable Federal, state, and local regulations by appropriately trained and VA-approved personnel and contractors. Since demolition was not performed as part of the inspection work at the facilities, certain areas such as pipe chases and areas above fixed permanent ceilings, fire-door interiors, and vault/safe wall and door linings were not inspected or tested. Prior to renovation and alteration work which could impact these areas, Castle Hill recommends that exploratory demolition be performed and a qualified inspector be utilized to examine the areas and collect samples as needed. Castle Hill recommends sampling of roofing materials and electrical components (not specifically examined as part of this survey) if renovation activities are planned which may disturb these materials.

Respectfully Submitted:

Brett L. Brumbaugh, REPA, CESCO State of North Carolina Asbestos Inspector License Number 12411

TABLE 1

LIST OF ACRONYMS

ACBM Asbestos Containing Building Material ACM Asbestos Containing Material AHERA Asbestos Hazard Emergency Response Act AIHA American Industrial Hygiene Association CAA Clean Air Act CFR Code of Federal Regulations EPA United States Environmental Protection Agency HazCom Hazard Communication HEPA High Efficiency Particulate Air Filter HVAC Heating, Ventilation, and Air Conditioning MISC Miscellaneous Asbestos Containing Material NESHAP National Emission Standards for Hazardous Air Pollutants NIOSH National Institute for Occupational Safety and Health NIST National Institute of Standards and Technology NOB Non-friable Organically Bound NVLAP National Voluntary Laboratory Accreditation Program OSHA Occupational Safety and Health Administration PAT AIHA Proficiency Analytical Testing Program PCM Phase Contrast Microscopy PEL Permissible Exposure Limit PLM Polarized Light Microscopy TEM Transmission Electron Microscopy TSCA Toxic Substances Control Act TSI Thermal Systems Insulation Castle Hill Castle Hill Associates, LLC VA United States Department of Veterans Affairs VAMC VA Medical Center XRD X-Ray Diffraction

TABLE 2

ASBESTOS REMOVAL PRIORITY PROTOCOLS

HAZARD

RANK

REMOVAL

PRIORITY

AHERA

CATEGORY

RESPONSE ACTION

RECOMMENDATION

7 1 Significantly Damaged

Evacuate or isolate the area.

Remove or repair if feasible.

O&M for all friable ACM.

6 2 Damaged with potential for significant damage

Evacuate or isolate the area.

Remove, encapsulate, or repair if feasible. O&M for all friable

ACM.

5 3 Damaged with potential for damage

Remove, encapsulate, or repair. O&M for all friable ACM.

4 4 Damaged Remove, encapsulate, or repair. O&M for all friable ACM.

3 5 Potential for significant damage

Take steps to reduce potential for damage. O&M for all friable

ACM.

2 6 Potential for damage O&M for all friable ACM.

1 7 No problem O&M for all friable ACM.

APPENDIX A

ASBESTOS BULK SAMPLING DATA

ASBESTOS BULK SAMPLING INFORMATION

Facility: W.G. Hefner VA Medical Center – Salisbury, NC Building: Building 4 - Mental Health Sampling Date: July 31, 2019 Analysis Dates: August 7-8, 2019 Laboratory: EMSL Analytical - Plymouth, MI Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-4 Sampler: Brett Brumbaugh Accreditation: State of North Carolina – Asbestos Inspector #12411

PLM Laboratory Analysis Result

SAMPLE

NUMBER MATERIAL SAMPLE LOCATION LABORATORY ANALYSIS

RESULT

S-1 Door frame caulk (exterior) 4th floor exit door to roof No asbestos detected

• EPA Definition of an asbestos containing material: Greater than 1% asbestos

Building: CC – Connecting Corridor Sampling Date: July 31, 2019 Analysis Dates: August 7-8, 2019 Laboratory: EMSL Analytical - Plymouth, MI Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-4

Accreditation: State of North Carolina – Asbestos Inspector #1241112411

RESULT

S-2 Steam pipe insulation N. wall of corridor from Building 8 to 21

10% Amosite Asbestos 7% Chrysotile Asbestos

Building: Building 11 - Administration Sampling Date: July 31, 2019 Analysis Dates: August 7-8, 2019 Laboratory: EMSL Analytical - Plymouth, MI Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-4

Accreditation: State of North Carolina – Asbestos Inspector #12411

RESULT

S-3 Mag block steam pipe insulation S. wall of mechanical room G-010 at wall

10% Amosite Asbestos 10% Chrysotile Asbestos

S-4 Aircell pipe insulation debris on floor Mechanical room G-010 85% Chrysotile Asbestos S-5 Spray-on insulation on ceiling Mechanical room G-010 No Asbestos Detected S-6 Transite panel behind radiator Room 128 25% Chrysotile Asbestos

Building: Building 5 – Kitchen/Library Sampling Date: July 31, 2019 Analysis Date: August 7-8, 2019 Laboratory: EMSL Analytical - Plymouth, MI Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-4

RESULT

S-7 Exterior door frame caulk Exit door on 1st floor by Mech. room 1052 6% Chrysotile Asbestos

Building: Building 6 - Recreation Sampling Date: July 31, 2019 Analysis Date: August 7-8, 2019 Laboratory: EMSL Analytical - Plymouth, MI Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-4

RESULT

S-8 Exterior door frame caulk Exit door on on ground floor by Regular Pool 2% Chrysotile Asbestos

Building: Building 12 – Police Sampling Date: July 31, 2019 Analysis Date: August 7-8, 2019 Laboratory: EMSL Analytical - Plymouth, MI Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-4

RESULT

S-13 Asphalt roofing on ground Crawl space No asbestos detected S-14 Window glazing E. window 3% Chrysotile Asbestos S-15 Window frame caulk “” No asbestos detected S-16 Popcorn acoustical ceiling spray-on Break room No asbestos detected S-17 Popcorn acoustical ceiling spray-on Hallway No asbestos detected S-18 Popcorn acoustical ceiling spray-on Dispatch No asbestos detected

Building: Building 18 – Boiler House Sampling Date: July 31, 2019 Analysis Date: August 7-8, 2019 Laboratory: EMSL Analytical - Plymouth, MI Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-4

RESULT

S-19 Upper drum insulation above boiler 1 Boiler 1 upper No asbestos detected S-20 Boiler breeching Catwalk by boiler 2 No asbestos detected S-21 Upper drum insulation above boiler 3 Boiler 3 upper No asbestos detected S-22 Storage tank – E. of boilers E. of boilers No asbestos detected S-23 12” terrazzo floor tile & mastic Lobby/entrance by control room No asbestos detected

APPENDIX B

Asbestos Quantities, Assessments, & Remediation Cost Estimates

W.G. Bill Hefner VA Medical Center - Salisbury, NC

CC - Connecting Corridors

Asbestos Assessments and Cost Estimates

July 2019

Asbestos Material Locations Quantity AHERA Category

Friability %Damage

AHERA

Assessment Recommendation Removal

Priority Repair Cost

Estimate Removal Cost

Estimate

Pipe insulation on steam lines Corridor between Buildings 8 & 21 12 LF TSI Friable 10% 5 Repair damage at N. wall then continue O&M; Remove at renovation or demolition 3 $1,000 $3,000

TOTALS 0 $3,000

Note: The start date for all response actions is October of 2019

Building 1 - Administrative

Asbestos Assessments and Cost Estimates

July 2019

Asbestos Material Locations Quantity AHERA Category

Friability %Damage

AHERA

Assessment Recommendation Removal

Priority Repair Cost

Estimate Removal Cost

Estimate Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~2,200 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $110,000

Transite cement sheets behind radiators Under all windows on Ground, 1st, & 2nd Floors 1,560 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $39,000

TOTALS 0 $149,000

Building 2 - General Medicine

Asbestos Assessments and Cost Estimates

July 2019

Asbestos Material Locations Quantity AHERA Category

Friability %Damage

AHERA

Assessment Recommendation Removal

Priority Repair Cost

Estimate Removal Cost

Estimate Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~8,100 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $405,000

Transite cement sheets behind radiators Under all windows on Ground through 5th floor 12,480 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $312,000

12” vinyl floor tile and mastic (including under carpeting) Ground, 1st, 2nd, 3rd, 4th, and 5th floors 17,400 sf MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $87,000

TOTALS 0 $804,000

Building 3 - Clinics Administrations

Asbestos Assessments and Cost Estimates

July 2019

Asbestos Material Locations Quantity AHERA Category

Friability %Damage

AHERA

Assessment Recommendation Removal

Priority Repair Cost

Estimate Removal Cost

Estimate Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~4,300 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $215,000

Transite cement sheets behind radiators Under all windows on Ground through 4th floor 5,960 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $149,000

12” vinyl floor tile and mastic (including under carpeting) Ground and 1st floors 3,620 sf MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $18,100

TOTALS 0 $382,100

Building 4 - Mental Health

Asbestos Assessments and Cost Estimates

July 2019

Asbestos Material Locations Quantity AHERA Category

Friability %Damage

AHERA

Assessment Recommendation Removal

Priority Repair Cost

Estimate Removal Cost

Estimate Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~2,100 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $105,000

Transite cement sheets behind radiators Under all windows on Ground through 4th floor 1,180 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $29,500

12” vinyl floor tile and mastic (including under carpeting) Ground floor and elevator cars 1,460 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,300

TOTALS 0 $141,800

Building 5- Kitchen/Library

Asbestos Assessments and Cost Estimates

July 2019

Asbestos Material Locations Quantity AHERA Category

Friability %Damage

AHERA

Assessment Recommendation Removal

Priority Repair Cost

Estimate Removal Cost

Estimate Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~1,320 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $66,000

Transite cement sheets behind radiators Under all windows on Ground and 1st floor 700 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $17,500

Exterior door frame caulk Exterior metal entry door frames 7 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,000

TOTALS 0 $90,500

Building 6 - Recreation

Asbestos Assessments and Cost Estimates

July 2019

Asbestos Material Locations Quantity AHERA Category

Friability %Damage

AHERA

Assessment Recommendation Removal

Priority Repair Cost

Estimate Removal Cost

Estimate Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~1,960 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $98,000

Pipe insulation debris in soil (covered with poly) Crawlspaces 13,550 sf TSI Friable 100% 7

Isolate crawl spaces and place signs at all entrances.

Require PPE for entrance to crawl. Encapsulate soil with spray foam or lightweight concrete, or remove soil to depth of 3".

1 $202,000 $270,000

Transite cement sheets behind radiators Under all windows on Ground and 1st floor 820 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $20,000

Exterior door frame caulk Exterior metal entry door frames 6 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $6,000

TOTALS 0 $394,000

Building 11 - Administration

Asbestos Assessments and Cost Estimates

July 2019

Asbestos Material Locations Quantity AHERA Category

Friability %Damage

AHERA

Assessment Recommendation Removal Priority Repair Cost

Estimate

Removal Cost

Estimate

Pipe insulation on steam and domestic water lines

Basement Room G-010, G-03, and Inaccessible wall chases and ceiling plenums

~2,140 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $107,000

Pipe insulation debris in soil Crawlspaces 13,220 sf TSI Friable 100% 7

Isolate crawl spaces and place signs at all entrances. Require PPE for entrance to crawl. Encapsulate soil with spray foam or lightweight concrete, or remove soil to depth of 3".

1 $198,000 $260,000

Transite cement sheets behind radiators Under all windows on 1st floor 1,140 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $28,500

TOTALS 0 $395,500

Building 12- Police

Asbestos Assessments and Cost Estimates

July 2019

Asbestos Material Locations Quantity AHERA Category

Friability %Damage

AHERA

Assessment Recommendation Removal Priority Repair Cost

Estimate

Removal Cost

Estimate Pipe insulation on steam and domestic water lines

Inaccessible wall chases and ceiling plenums ~410 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $20,500

Exterior window glazing Metal windows on 1st & 2nd floors 16 windows MISC Friable 25% 4 Paint over loose glazing then continue O&M; Remove at renovation or demolition

4 No damage $4,000

TOTALS $0 $24,500

Building 13 - Residents

Asbestos Assessments and Cost Estimates

July 2019

Asbestos Material Locations Quantity AHERA Category

Friability %Damage

AHERA

Assessment Recommendation Removal Priority Repair Cost

Estimate

Removal Cost

Estimate Pipe insulation on steam and domestic water lines

Inaccessible wall chases and ceiling plenums ~410 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $20,500

TOTALS $0 $20,500

Building 14 - Police Training House

\Asbestos Assessments and Cost Estimates

July 2019

Asbestos Material Locations Quantity AHERA Category

Friability %Damage

AHERA

Assessment Recommendation Removal Priority Repair Cost

Estimate

Removal Cost

Estimate

Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums ~410 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $20,500

Exterior window glazing Metal windows on 1st & 2nd floors 16 windows MISC Friable 25% 4

Paint over loose glazing then continue O&M; Remove at renovation or demolition

4 No damage $4,000

TOTALS $0 $24,500

Building 15 - Billing

Asbestos Assessments and Cost Estimates

July 2019

Asbestos Material Locations Quantity AHERA Category

Friability %Damage

AHERA

Assessment Recommendation Removal Priority Repair Cost

Estimate

Removal Cost

Estimate

Pipe insulation on steam and domestic water lines Inaccessible wall chases and ceiling plenums 380 lf TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $19,000

TOTALS $0 $19,000

Building 16 – Linen Distribution

Asbestos Assessments and Cost Estimates

July 2019

Asbestos Material Locations Quantity AHERA Category

Friability %Damage

AHERA

Assessment Recommendation Removal Priority Repair Cost

Estimate

Removal Cost

Estimate

Pipe insulation on steam and domestic water lines Inaccessible column chases in Room 101 ~50 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $3,000

TOTALS 0 $3,000

Building 18 - Boiler Plant

Asbestos Assessments and Cost Estimates

July 2019

Asbestos Material Locations Quantity AHERA Category

Friability %Damage

AHERA

Assessment Recommendation Removal Priority Repair Cost

Estimate

Removal Cost

Estimate Internal boiler insulation under metal jackets (assumed ACM) 3 Boilers 4,880 sf TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $366,000

TOTALS 0 $366,000

Building 21 – Medical Administration

Asbestos Assessments and Cost Estimates

July 2019

Asbestos Material Locations Quantity AHERA Category

Friability %Damage

AHERA

Assessment Recommendation Removal Priority Repair Cost

Estimate

Removal Cost

Estimate Pipe insulation on steam and domestic water lines

Inaccessible wall chases and ceiling plenums ~5,140 LF TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $257,000

Transite cement sheets behind radiators Under all windows on 1st floor and 2nd floors 6,460 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $161,000

TOTALS 0 $418,000

APPENDIX C

PHOTOGRAPHS OF ASBESTOS MATERIALS

Connect Corridors Underground Walks

Photo CC-1

Pipe insulation on steam lines

BUILDING 2 - GENERAL MEDICINE

Photo 2-1

Transite cement sheets behind radiators

Photo 2-2

12” vinyl floor tile and mastic (including under carpeting)

BUILDING 3 - CLINICS ADMINISTRATIONS

Photo 3-1

Photo 3-2

BUILDING 4 - MENTAL HEALTH

Photo 4-1

Photo 4-2

BUILDING 5 - KITCHEN/LIBRARY

Photo 5-1

Photo 5-2

Exterior door frame caulk

BUILDING 6 - RECREATION

Photo 6-1

Photo 6-2

Exterior door frame caulk

Photo 6-3

Pipe insulation debris in soil

BUILDING 11 - ADMINISTRATION

Photo 11-1

Pipe insulation on steam lines at wall penetrations in mechanical room G-101

Photo 11-2

Pipe insulation debris on floor of mechanical room G-101

Photo 11-3

Pipe insulation debris in soil

Photo 11-4

BUILDING 12- POLICE

Photo 12-1

Exterior window glazing

BUILDING 14 – POLICE TRAINING HOME

Photo 14-1

Exterior window glazing

BUILDING 16 – LINEN DISTRIBUTION

Photo 16-1

Pipe insulation on steam and domestic water lines behind block walls

BUILDING 18 – BOILER PLANT

Photo 18-1

Internal boiler insulation under metal jackets (assumed ACM)

Photo 18-2

Internal boiler insulation under metal jackets (assumed ACM)

APPENDIX D

ASBESTOS LABORATORY REPORTS

EMSL Analytical, Inc.

15111 Northville Rd Plymouth, MI 48170

Tel/Fax: (734) 668-6810 / (734) 668-8532 http://www.EMSL.com / annarborlab@emsl.com

081902309EMSL Order:

Customer ID: CHAS42

Customer PO: VISN6

Project ID:

Attention: Phone:Brett Brumbaugh (567) 952-0212

Fax:Castle Hill Associates, LLC

Received Date:218-A Mechanic St. 08/05/2019 8:10 AM

Analysis Date:Waterville, OH 43566 08/07/2019 - 08/08/2019

Collected Date:

Project: VISN 6 - Ashville & Salisbury VA

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

081902309-0001

None DetectedNon-fibrous (Other)100%Beige

Non-Fibrous

Homogeneous

081902309-0002

None DetectedQuartz

Non-fibrous (Other)

3%

97%

Tan/White

Non-Fibrous

Heterogeneous

Inseperable layers

081902309-0003

None DetectedQuartz

Non-fibrous (Other)

3%

97%

Tan/White

Non-Fibrous

Heterogeneous

Inseperable layers

081902309-0004

None DetectedNon-fibrous (Other)100%Tan/White

Non-Fibrous

Homogeneous

081902309-0005

None DetectedMica

Non-fibrous (Other)

2%

98%

White

Non-Fibrous

Homogeneous

081902309-0006

None DetectedMica

Non-fibrous (Other)

<1%

100%

White

Non-Fibrous

Homogeneous

081902309-0007

None DetectedMica

Non-fibrous (Other)

<1%

100%

White

Non-Fibrous

Homogeneous

081902309-0008

None DetectedNon-fibrous (Other)86%Cellulose14%Gray/Beige

Fibrous

Heterogeneous

Fiberboard A

081902309-0008A

None DetectedQuartz

Non-fibrous (Other)

2%

98%

Gray

Non-Fibrous

Homogeneous

Fiberboard B

081902309-0009

None DetectedQuartz

Non-fibrous (Other)

3%

97%

Gray

Non-Fibrous

Homogeneous

081902309-0010

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

081902309-0011

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

081902309-0012

None DetectedNon-fibrous (Other)82%Cellulose18%Gray/Tan

Fibrous

Heterogeneous

081902309-0013

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Cove Base

081902309-0013A

None DetectedNon-fibrous (Other)100%Beige

Non-Fibrous

Homogeneous

Adhesive

Initial report from: 08/08/2019 08:06:09

Page 1 of 4ASB_PLM_0008_0001 - 1.78 Printed: 8/8/2019 8:06 AM

Tel/Fax: (734) 668-6810 / (734) 668-8532 http://www.EMSL.com / annarborlab@emsl.com

081902309EMSL Order:

Customer ID: CHAS42

Customer PO: VISN6

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

081902309-0014

None DetectedNon-fibrous (Other)100%Black/Beige

Non-Fibrous

Heterogeneous

081902309-0015

None DetectedQuartz

Non-fibrous (Other)

2%

98%

Tan/Beige

Non-Fibrous

Heterogeneous

Inseperable layers

081902309-0016

None DetectedNon-fibrous (Other)100%Tan/Beige

Non-Fibrous

Homogeneous

081902309-0017

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

081902309-0018

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Floor Tile

081902309-0018A

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Adhesive

081902309-0019

None DetectedNon-fibrous (Other)92%Cellulose8%Brown/Blue

Fibrous

Heterogeneous

081902309-0020

None DetectedNon-fibrous (Other)100%Beige/Rust

Non-Fibrous

Homogeneous

081902309-0021

None DetectedQuartz

Non-fibrous (Other)

<1%

88%

Cellulose12%Gray

Fibrous

Heterogeneous

081902309-0022

None DetectedNon-fibrous (Other)2%Cellulose98%Brown

Fibrous

Homogeneous

081902309-0023

None DetectedNon-fibrous (Other)2%Cellulose98%Brown

Fibrous

Homogeneous

081902309-0024

None DetectedNon-fibrous (Other)17%Min. Wool83%White

Fibrous

Homogeneous

081902309-0025

None DetectedNon-fibrous (Other)20%Min. Wool80%White

Fibrous

Homogeneous

081902309-0026

None DetectedNon-fibrous (Other)5%Min. Wool95%Gray

Fibrous

Homogeneous

081902309-0027

None DetectedMica

Non-fibrous (Other)

2%

98%

White

Non-Fibrous

Homogeneous

S1

081902309-0028

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

S2

081902309-0029

10%

7%

Amosite

Chrysotile

Non-fibrous (Other)83%White

Fibrous

Homogeneous

S3

081902309-0030

10%

10%

Amosite

Chrysotile

Non-fibrous (Other)80%White

Fibrous

Homogeneous

Page 2 of 4ASB_PLM_0008_0001 - 1.78 Printed: 8/8/2019 8:06 AM

Tel/Fax: (734) 668-6810 / (734) 668-8532 http://www.EMSL.com / annarborlab@emsl.com

081902309EMSL Order:

Customer ID: CHAS42

Customer PO: VISN6

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

S4

081902309-0031

85% ChrysotileNon-fibrous (Other)15%Gray/White/Beige

Fibrous

Homogeneous

S5

081902309-0032

None DetectedNon-fibrous (Other)5%Cellulose95%Brown/Tan

Fibrous

Homogeneous

S6

081902309-0033

25% ChrysotileNon-fibrous (Other)75%Gray/White

Fibrous

Homogeneous

S7

081902309-0034

6% ChrysotileNon-fibrous (Other)94%Brown/Gray/White

Fibrous

Homogeneous

S8

081902309-0035

2% ChrysotileNon-fibrous (Other)98%Brown/Gray/White

Non-Fibrous

Homogeneous

S9

081902309-0036

3% ChrysotileNon-fibrous (Other)97%Gray/White/Black

Non-Fibrous

Homogeneous

S10

081902309-0037

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Caulk

S10

081902309-0037A

None DetectedNon-fibrous (Other)89%Wollastonite

Fibrous (Other)

3%

8%

Brown/Gray/White

Non-Fibrous

Homogeneous

Glazing

S11

081902309-0038

3% ChrysotileNon-fibrous (Other)97%Gray/White

Non-Fibrous

Homogeneous

S12

081902309-0039

None DetectedNon-fibrous (Other)100%Gray/White

Non-Fibrous

Homogeneous

S13

081902309-0040

None DetectedMica

Non-fibrous (Other)

2%

63%

Cellulose35%Tan/Red/Black

Fibrous

Heterogeneous

S14

081902309-0041

4% ChrysotileNon-fibrous (Other)96%Gray/Various

Non-Fibrous

Homogeneous

S15

081902309-0042

None DetectedNon-fibrous (Other)100%Gray/White

Non-Fibrous

Homogeneous

Caulk

S15

081902309-0042A

None DetectedNon-fibrous (Other)89%Wollastonite

Fibrous (Other)

3%

8%

Gray/Various

Non-Fibrous

Homogeneous

Glazing

S16

081902309-0043

None DetectedMica

Non-fibrous (Other)

<1%

100%

White

Non-Fibrous

Homogeneous

S17

081902309-0044

None DetectedMica

Non-fibrous (Other)

<1%

100%

White

Non-Fibrous

Homogeneous

S18

081902309-0045

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

S19

081902309-0046

None DetectedNon-fibrous (Other)65%Cellulose

Min. Wool

15%

20%

Gray/White

Non-Fibrous

Homogeneous

S20

081902309-0047

None DetectedNon-fibrous (Other)83%Cellulose

Min. Wool

2%

15%

Gray

Fibrous

Homogeneous

Page 3 of 4ASB_PLM_0008_0001 - 1.78 Printed: 8/8/2019 8:06 AM

Tel/Fax: (734) 668-6810 / (734) 668-8532 http://www.EMSL.com / annarborlab@emsl.com

081902309EMSL Order:

Customer ID: CHAS42

Customer PO: VISN6

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

S21

081902309-0048

None DetectedNon-fibrous (Other)85%Cellulose

Min. Wool

6%

9%

Gray/White

Fibrous

Homogeneous

S22

081902309-0049

None DetectedNon-fibrous (Other)85%Min. Wool15%Gray

Fibrous

Homogeneous

S23

081902309-0050

None DetectedNon-fibrous (Other)100%Gray/Black

Non-Fibrous

Homogeneous

S24

081902309-0051

None DetectedNon-fibrous (Other)85%Min. Wool15%Gray

Fibrous

Homogeneous

S25

081902309-0052

None DetectedNon-fibrous (Other)100%Blue

Non-Fibrous

Homogeneous

Analyst(s)

Conner Frymier (26)

Rebecca Newman (30)

Waverly Ferguson (1)

Ryan Shannon, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis . The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 "Interim

Method"), but augmented with procedures outlined in the 1993 ("final") version of the method. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . Interpretation and use of test results are the responsibility of the client. All samples received in acceptable condition unless otherwise noted. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. EMSL recommends gravimetric reduction for all non -friable organically bound materials prior to analysis. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. Plymouth, MI NVLAP Lab Code 101048-4

Page 4 of 4ASB_PLM_0008_0001 - 1.78 Printed: 8/8/2019 8:06 AM

OrderID: 081902309

APPENDIX E

INSPECTOR CERTIFICATIONS

APPENDIX F

LAB CERTIFICATIONS

APPENDIX G

ASBESTOS LOCATIONS & SAMPLE LOCATION DRAWINGS

CASTLE HILL ASSOCIATES, LLC.

DEPARTMENT OF VETERANS AFFAIRS

W.G. (BILL) HEFNER VA MEDICAL CENTER

SALISBURY, NORTH CAROLINA

2019 ASBESTOS REINSPECTION

VA CONTRACT NUMBER: 36C24619N0872

LEGEND

ABC

PROJECT V06-18-102 VISN ASBESTOS SURVEY

ASBESTOS CONTAINING MATERIALS NOT SHOWN ON DRAWINGS

AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212

AutoCAD SHX Text one-quarter inch = one foot

AutoCAD SHX Text one-eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three-eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text one-half inch = one foot

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one and one-half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text three-quarters inch = one foot

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved : Division Chief

AutoCAD SHX Text Approved : Service Director

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Building Number

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Checked

AutoCAD SHX Text Department of

AutoCAD SHX Text Office of Facilities

AutoCAD SHX Text

AutoCAD SHX Text Drawn

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text Project No.

AutoCAD SHX Text Date

AutoCAD SHX Text Veterans Affairs

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text Sheet 01 of 32

AutoCAD SHX Text Revisions

AutoCAD SHX Text Professional Seal:

AutoCAD SHX Text FACILITY ASBESTOS RE-SURVEY VETERANS ADMINISTRATION MEDICAL CENTER SALISBURY, NORTH CAROLINA

AutoCAD SHX Text V06-18-102

AutoCAD SHX Text

JULY 2019

AutoCAD SHX Text

AFS

AutoCAD SHX Text

BLB

AutoCAD SHX Text

SALISBURY, NORTH CAROLINA

AutoCAD SHX Text Dates

AutoCAD SHX Text

AutoCAD SHX Text

TITLE SHEET

AutoCAD SHX Text North:

AutoCAD SHX Text

CS

AutoCAD SHX Text

ASBESTOS-CONTAINING PIPE INSULATION ON STEAM OR DOMESTIC WATER LINES

AutoCAD SHX Text

ASBESTOS-CONTAINING 12" OR 9" VINYL FLOOR TILE AND/OR BLACK MASTIC

AutoCAD SHX Text ASBESTOS-CONTAINING PIPE INSULATION IN PLASTER WALL CHASES AND ABOVE PLASTER WALLS

AutoCAD SHX Text

ASBESTOS-CONTAINING TRANSITE CEMENT SHEETS BEHIND RADIATORS BELOW ALL WINDOWS

AutoCAD SHX Text

ASBESTOS-CONTAINING WINDOW GLAZE ON ALL WINDOWS

AutoCAD SHX Text

ASBESTOS-CONTAINING 12" VINYL FLOOR TILE (NEGATIVE MASTIC)

AutoCAD SHX Text

ASBESTOS-CONTAINING 12" VINYL FLOOR TILE AND BLACK MASTIC

AutoCAD SHX Text

ASBESTOS-CONTAINING BLACK MASTIC UNDER NON-ASBESTOS FLOOR TILE

AutoCAD SHX Text

ASBESTOS-CONTAINING WINDOW GLAZING

AutoCAD SHX Text

ASBESTOS-CONTAINING MUDDED FITTINGS ON FIBERGLASS INSULATED PIPES

AutoCAD SHX Text

ASBESTOS-CONTAINING PIPE INSULATION DEBRIS IN SOIL/DIRT IN CRAWL SPACE

N

S

W

E

BUILDING #1 - GROUND FLOOR PLAN BUILDING #1 - FIRST FLOOR PLAN

AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212

AutoCAD SHX Text one-quarter inch = one foot

AutoCAD SHX Text one-eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three-eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text one-half inch = one foot

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one and one-half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text three-quarters inch = one foot

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved : Division Chief

AutoCAD SHX Text Approved : Service Director

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Building Number

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Checked

AutoCAD SHX Text Department of

AutoCAD SHX Text Office of Facilities

AutoCAD SHX Text

AutoCAD SHX Text Drawn

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text Project No.

AutoCAD SHX Text Date

AutoCAD SHX Text Veterans Affairs

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text Sheet 02 of 32

AutoCAD SHX Text Revisions

AutoCAD SHX Text Professional Seal:

AutoCAD SHX Text FACILITY ASBESTOS RE-SURVEY VETERANS ADMINISTRATION MEDICAL CENTER SALISBURY, NORTH CAROLINA

AutoCAD SHX Text V06-18-102

AutoCAD SHX Text

JULY 2019

AutoCAD SHX Text

AFS

AutoCAD SHX Text

BLB

AutoCAD SHX Text

SALISBURY, NORTH CAROLINA

AutoCAD SHX Text Dates

AutoCAD SHX Text

AutoCAD SHX Text ARCHITECTURAL PLAN BUILDING 1 Scale: 1/16" = 1'-0"" = 1'-0"

AutoCAD SHX Text North:

AutoCAD SHX Text 1A

AutoCAD SHX Text NOT SHOWN: ASBESTOS-CONTAINING PIPE INSULATION IN PLASTER WALL CHASES AND ABOVE PLASTER WALLS.

AutoCAD SHX Text

NOTE:

NOT SHOWN: ASBESTOS-CONTAINING TRANSITE CEMENT SHEETS BEHIND RADIATORS BELOW ALL WINDOWS.

S

W

E

BUILDING #1 - SECOND FLOOR PLAN BUILDING #1 - ROOF PLAN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212

AutoCAD SHX Text one-quarter inch = one foot

AutoCAD SHX Text one-eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three-eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text one-half inch = one foot

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one and one-half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text three-quarters inch = one foot

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved : Division Chief

AutoCAD SHX Text Approved : Service Director

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Building Number

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Checked

AutoCAD SHX Text Department of

AutoCAD SHX Text Office of Facilities

AutoCAD SHX Text

AutoCAD SHX Text Drawn

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text Project No.

AutoCAD SHX Text Date

AutoCAD SHX Text Veterans Affairs

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text Sheet 03 of 32

AutoCAD SHX Text Revisions

AutoCAD SHX Text Professional Seal:

AutoCAD SHX Text…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .