36C24620Q0579 0001.docx

DOCX document 33 KB Posted

Attached to
Repair Smoke and Fire Doors Building 1 and 23
Solicitation number
36C24620Q0579
Issued by

About this file

This document is an amendment to a solicitation for fire and smoke door repairs at the Durham VAMC. The amendment answers questions from prospective offerors regarding storage and disposal of materials, OSHA requirements, asbestos and lead paint abatement, performance bonds, certifications, wall repairs, and life safety drawings. Offerors must acknowledge receipt of the amendment by the specified date and time. The Department of Veterans Affairs Veterans Health Administration VISN 6 is seeking offers to repair fire and smoke doors in Buildings 1 and 23 per the project work statement, instructions to offerors, and evaluation factors. Pricing shall be provided next to each door listed in the exhibit.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24620Q0579 0001 Attachments

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 05-27-2020 558-20-3-6049-0020 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders

36C24620Q0579 05-27-2020

X X X

558-3600162-6049-854200-2543 23NRNR001

The purpose of this amendment to solicitation # 36C24620Q0579 is to answer all timely requests for information submitted to the Contracting Officer. A timely submission, IAW the instructions to offerors, is any inquiry received on or before Monday, May 27, 2020, at 0700AM Eastern.

Cole J. Culley Contracting Officer

VA-VHA-RPOE-2019-369AC7BE

CONTINUATION PAGE

Fire Door Repair, Replace and Labeling Solicitation Questions & Answers

The questions below are from prospective offerors. The responses are below in bold.

1. No storage of any material will be allowed on VA property unless approved by the COR. – Should contractor’s price in on-site mobile storage units, and is there adequate space on the VAMC campus, which is close to the loading docks to sit in the mobile storage unit?

Contractor should assume there is no material allowed to be stored on VA property.

2. Can the contractor dispose of old fire doors using the DURVAMC’s dumpsters, or should the Contractor price in a dumpster being set in on the site?

Contractor should assume that all demolished material should be removed from the site at the end of each day by the contractor. No dumpster can be guaranteed for use.

3. Statement of work states that all workers on site must have 30 Hour OSHA, but “General Requirements” state workers must have OSHA 10 hour, and supervisors 30 Hour OSHA – want to verify which standard to follow

Follow General Requirements - workers must have OSHA 10 hour, and supervisors must have 30 Hour OSHA

4. Is the DURVAMC aware of any suspect Asbestos Containing Material in the facility?

Yes, there is Asbestos containing materials in our facility as well as lead paint. Contractor shall add a line item for asbestos and lead paint abetment.

5. Is a performance bond required?

No.

6. Can you extend the bid date?

I do not intend on extending the date

7. Please provide the fire door certification of the inspector that prepared the inspection report.

The original fire door inspector met the qualifications from NFPA 80 and was certified as a fire and egress door assembly inspector from DHI.

8. Who is responsible for final certification of the door openings and the associated costs for the NFPA certifications.

The contractor is responsible for the certification and the costs.

9. Without performing a detailed pre bid walk through will the VA be responsible for any openings or deficiencies not correctly identified on the report that do not meet NFPA 80.

Yes, only deficiencies in the report will be required to be fixed. For bid purposes, contractor shall correct all deficiencies to bring the fire doors to compliance per applicable codes.

10. Please provide the current set of life safety drawings used during the inspection to determine wall types - smoke partitions, fire partitions and ratings.

Attached.

11. Will the doors currently listed as N/A required to be fire rated? If so are they wood or HM doors?

Contractor will not be responsible for doors labeled N/A.

12. Have the frames that are required to be rated and not currently tagged been field verified to have the required closer reinforcements?

All information on frames is included in the report.

13. Please note that all holes over 1/8” will need to be welded closed. What will be required in order for this to take place inside the VA – burn permits, fire watch, air scrubbers, IRCA risk assessments?

Contractor shall meet all requirements from Infections Control, NFPA, VHA design manuals, VHA directives, and the VA Til for all work. Each fire door assembly will require its own ICRA. Welding is not the only option to cover a hole in a fire door. Contractor shall research the best solution.

14. Can we use hardware that has been manufactured for the purpose of closing gaps on fire doors – sweeps, gaskets, etc?

All hardware must be installed per the fire door manufactures guideless and NFPA 80, 105, and 101 requirements. The new hardware must meet the recertification requirements from NFPA and be able to be recertified with a label as a fire door (45 min, 90 min, etc.).

15. When was the last time the building was evaluated by an Architect or code consultant to determine if the walls types are still correct? The reason behind this question is that the VAMC Charleston had a re-evaluation of the building and several walls changed to Smoke partitions reducing the requirements. Please see attached example of fire wall plans that were provided with the Charleston Fire Door Replacement project.

April 25, 2017

16. Who is responsible for any wall repairs that may be required? If wall repairs are required how do we determine the types of finishes that will be encountered.

Contractor will coordinate with the VA on any wall repairs. The project is focused on door assemblies and the door hardware – wall repairs will be needed if there is damage from the entire door assembly removal and reinstallation. If damage is caused by the contractor, they will be responsible for repairs with direction from the Durham VAMC Engineering department. The contractor shall supply before and after photos of the doors to ensure all work is completed per code.

See attached document: Bldg1 1st.

See attached document: Dur_Va_LS_Plan_Bldg1_2-Layout1.

See attached document: Dur_Va_LS_Plan_Bldg1_3-Layout1.

See attached document: Dur_Va_LS_Plan_Bldg1_4-Layout1.

See attached document: Dur_Va_LS_Plan_Bldg1_5-Layout1.

See attached document: Dur_Va_LS_Plan_Bldg1_6-Layout1.

See attached document: Dur_Va_LS_Plan_Bldg1_7-Layout1.

See attached document: Dur_Va_LS_Plan_Bldg1_8-Layout1.

See attached document: Dur_Va_LS_Plan_Bldg1_9-Layout1.

See attached document: Dur_Va_LS_Plan_Bldg1_10-Layout1.

See attached document: Dur_Va_LS_Plan_Bldg1_B-Layout1.

See attached document: Dur_Va_LS_Plan_Bldg1_G-Layout1.

See attached document: Dur_Va_LS_Plan_Bldg23_1-Layout1.

See attached document: Dur_Va_LS_Plan_Bldg23_2-Layout1.

See attached document: Dur_Va_LS_Plan_Bldg23_3-Layout1.

See attached document: Dur_Va_LS_Plan_Bldg23_G-Layout1.