36C24619R0104-0002003.docx
DOCX document Posted
- Attached to
- TIERED EVALUTIONS Renovate for Water Quality Federal contract opportunity
- Solicitation number
- 36C24619R0104
About this file
36C24619R0104 0002 36C24619R0104 0002.docx
View the file
Other files for this federal contract opportunity
Show all 50
TIERED EVALUTIONS Renovate for Water Quality has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-28-2019 658-15-101 Department of Veterans Affairs Network Contracting Office 6 1970 Roanoke Blvd Salem
VA
24153 Department of Veterans Affairs Network Contracting Office 6 1970 Roanoke Blvd Salem
VA
24153 To all Offerors/Bidders
36C24619R0104 08-16-2019
X X X
X The purpose of this amendment is to address questions received to date, provide a corrected Davis-Bacon Act General Decision Number: VA20190172, provide site conditions pictures to assist with bidding and provide the Comprehensive Survey for Asbestos Containing Materials dated in year 2010.
All proposals must be delivered to arrive not later than Wednesday September 11, 2019 at 2:00 p.m. (EST), at the following address:
VA Medical Center/NCO 6 Mail Stop 90/C C/O Patrick Stultz, Contracting Officer 1970 Roanoke Boulevard Building 74Room 213G Salem, VA 24153-6404 Patrick Stultz Contracting Officer N615L2-73394 Veterans Affairs Medical Center, Salem, VA
Questions and VA Answers for Renovate for Water Quality Project 658-15-101 Solicitation 36C24619R0104
Q1) Will storage be made available to us to store material and tools? Or will we have to arrange for local storage?
A1) Contractor is responsible for its own storage.
Q2) Will Union labor be required?
A2) Labor workforce is the responsibility of the contractor.
Q3) Will there be orientation and badging required before work is able to begin?
A3) Yes, all employees shall be badge before work commences on job site.
Q4) Will installations be permitted on weekends or evenings?
A4) Yes, just need to coordinate with the COR as needed. All reasonable request will be entertained on a case by case basis subject to the Facility operation needs.
Q5) Can viega propress fittings be utilized on this project for domesitc water piping? This will help reduce the amount of hot work conducted inside of critical spaces in the hospital.
A5) Yes, reference specification section 22 11 00 paragraph 2.2.B.3.
Q6) Can flexible lavatory supply hoses be used instead of chrome tubes be utilized?
A6) No. Reference specification 22 11 00 paragraph 2.3.A Q7) How many lavatories will be provided each day to change out mixing valves? We need at least 20 per day.
A7) The VA cannot guarantee a standard minimum number of lavatories that will be available each day as this will vary depending on the use of space/rooms in each building. Reference specification section 01 00 00 paragraph 1.6.I. which states:
The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
To insure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to insure accomplishment of this work in successive phases mutually agreeable Q8) What time of day will the under sink mixing valves work be allowed to be conducted?
A8) Reference specification section 01 00 00 paragraph 1.6.I. which states:
The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
To insure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to insure accomplishment of this work in successive phases mutually agreeable Q9) Is this project sales tax exempt? If the project is sales tax exempt can the government provide a sales tax exemption certificate?
A9) No, this project is not Sales Tax exempt IAW with FAR 29.303.
Q10) Will the Government provide comprehensive written badging requirements for the project if badging is required?
A10) See General Requirement 01 00 00 1.5 Construction Security Requirements.
Q11) Where will the designated laydown parking area be for workers accessing the construction site?
A11) See General Requirement 01 00 00 1.5 Construction Security Requirements.
Q12) Will the government accept the use of the industry leading Procore Project Management software as the primary submittal and data tracking tool for this project? The software is compatible with the VA’s networks and is currently in use at many VA locations.
A12) No, See specification section 01 33 23 Shop Drawings, Product Data, and Samples.
Q13) Will the qualified Superintendent be able to fill roles as the SSHO and QCM if required?
A13) No, Reference specification section 01 45 00.10 20 paragraph 1.5.1
See attached document: General Decision Number VA20190172 04-05-2019.
See attached document: S02 Renovate for Water Quality Phase 1 Photos.
See attached document: Salem VAMC Building 1.
See attached document: Salem VAMC Building 4.
See attached document: Salem VAMC Building 5.
See attached document: Salem VAMC Building 7.
See attached document: Salem VAMC Building 8.
See attached document: Salem VAMC Building 9.
See attached document: Salem VAMC Building 10.
See attached document: Salem VAMC Building 11.
See attached document: Salem VAMC Building 12.
See attached document: Salem VAMC Building 13.
See attached document: Salem VAMC Building 14.
See attached document: Salem VAMC Building 15.
See attached document: Salem VAMC Building 16.
See attached document: Salem VAMC Building 17.
See attached document: Salem VAMC Building 18.
See attached document: Salem VAMC Building 19.
See attached document: Salem VAMC Building 74.
See attached document: Salem VAMC Building 75.
See attached document: Salem VAMC Building 76.
See attached document: Salem VAMC Building 77.
See attached document: Salem VAMC Multi Bldgs 23-80.
See attached document: Salem VAMC Bldgs 85-155.