36C24619Q0643-002.pdf
PDF 218 KB Posted
- Attached to
- De-Icing Services Federal contract opportunity
- Solicitation number
- 36C24619Q0643
About this file
36C24619Q0643 QASP De-icing Service.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24619Q0643-001.docx | DOCX document | |
| 36C24619Q0643-004.pdf | ||
| 36C24619Q0643-003.pdf | ||
| 36C24619Q0643-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
The contractor shall be evaluated in accordance with the following QASP.
For: Department of Veterans Affairs, Richmond VAMC, Richmond, Virginia
Contract Number:
Contract Description: The contractor shall provide all labor, tools, equipment, and materials necessary to clear ice from identified roads and parking lots at the Hunter Holmes McGuire Veterans Affairs Medical Center (Richmond VAMC).
Total surface area equals 2,746,264 square feet.
Priority 1 areas (entrance and perimeters roads; Hunter Holmes Drive, South Drive, East Drive, Delivery Drive, 1st through 6th Streets, Lots 1A, 2A, Main Entrance, Valet, Fisher House (512), 514 Entrance and Loading Dock) and 507 parking lot. Priority 1 area total square footage (sq. ft.)
is 632,700 sq. ft.
Priority 2 areas (Lots: 3A through 15A, 8B, 9B, 10B, Building 508, and 509 Parking). Priority 2 area total square footage is 2,113,564 sq. ft.
Contractor’s name: (hereafter referred to as the contractor).
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
What will be monitored.
How monitoring will take place.
Who will conduct the monitoring.
How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Cherisse A. Hall Department of Veterans Affairs Network Contracting Office (NCO) 6 100 Emancipation Drive Hampton, VA 23667
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: To Be Determined
C. Other Key Government Personnel –
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager - __________________________________
b. Other Contractor Personnel - ___________________________
Title:
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Performance Objective (The Service required—usually a shall statement)
Standard Acceptable Quality Level
(AQL)
Method of Surveillance
Incentives/Disincentives
Priority Area 1 Contractor shall remove ice as shown in the PWS. (PWS paragraph 2.1)
For up to and including 3” of ice, completion in 5.0 hours.
For more than 3” ice, completion in
8.0 hours
For up to and including 3” of snow/ice, AQL is
8.0 hours.
For more than 3” of snow/ice, AQL is 14.0 hours
On-the-spot inspection
Incentives: Favorable contractor performance evaluation.
Disincentives: Unfavorable contractor performance evaluation.
A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level.
Priority Area 2 Contractor shall remove ice as shown in the PWS. (PWS paragraph 2.2)
For up to and including 3” of ice, completion in 8.0 hours.
For more than 3” of ice, completion in 12.0 hours
For up to and including 3” of snow/ice, AQL is
12.0 hours.
For more than 3” of snow/ice, AQL is 24.0 hours
On-the-spot inspection
Incentives: Favorable contractor performance evaluation.
Disincentives: Unfavorable contractor performance evaluation.
A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level.
5. INCENTIVES/DISINCENTIVES
The Government shall use favorable contractor performance evaluations as incentives. The Government shall report unfavorable contractor performance as disincentives. Disincentives shall include documentation of any performance issues. If repetitive or consistent the government shall take further corrective action or begin termination procedures.
Incentives/Disincentives shall be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION: Surveillance results must be able to support action taken by the COR/Contracting Officer when nonperformance or unacceptable performance occurs.
b. MONTHLY REPORTS: reports will be generated monthly by the contractor which the COR will use to track progress of maintenance
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Positive outcome: No more than 1 incident of not meeting the performance standard during the period of performance
Neutral outcome: No more than 3 incidents of not meeting the performance standard during the period of performance
Negative outcome: More than 3 incidents of not meeting the performance standard during the period of performance.
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall inform the Contracting Officer (CO). This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR and the CO shall document the discussion and place it in their respective file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the CO. The CO will in turn review and submit to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO (see sample CDR below).
CONTRACT DISCREPANCY REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CDR PREPARED
b. RETURNED BY
CONTRACTOR:
c. ACTION COMPLETE
6. DISCREPANCY OR PROBLEM (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9a. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO
PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures.
Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION. (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
13. GOVERNMENT ACTIONS (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
CONTRACTOR
NOTIFIED
COR
CONTRACTING
OFFICER
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor as needed to assess performance and shall provide a written assessment.
REVISIONS TO QASP: revisions to the surveillance plan are the joint responsibility of the COR and the Contracting Officer.
Signature – Contractor Program Manager
Signature – Contracting Officer’s Representative
QUALITY ASSURANCE SURVEILLANCE PLAN