36C24619Q0277-007.docx
DOCX document 16 KB Posted
- Solicitation number
- 36C24619Q0277
About this file
36C24619Q0277 QASP.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24619D0050-000.docx | DOCX document | |
| 36C24619Q0277-0001000.docx | DOCX document | |
| 36C24619Q0277-004.docx | DOCX document | |
| 36C24619Q0277-006.pdf | ||
| 36C24619Q0277-008.docx | DOCX document | |
| 36C24619Q0277-005.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
The contractor shall be evaluated in accordance with the following QASP.
For: Durham VA Medical Center (VAMC) Contract Description: ECG Loop monitoring with outpatient (continuous) telemetry monitoring service.
Contractor’s name: TBD (To Be Determined)
1. PURPOSE: This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
| • | What shall be monitored |
| • | How monitoring shall take place |
| • | Who shall conduct the monitoring |
| • | How monitoring efforts and results shall be documented |
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES: The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
| Assigned CO: | Chinedu Nwauwa | |
| Contract Specialist: | Lori D. Miller |
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: TBD
c. Other Key Government Personnel – TBD
3. CONTRACTOR REPRESENTATIVES: The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager – TBD
b. Other Contractor Personnel – Not applicable
4. PERFORMANCE STANDARDS: Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements are listed below. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
| The Contractor shall perform Coordination that meet the requirements of the PWS |
| The Contractor successfully performs the required services throughout the period of performance |
| 95% |
| COR Direct Observation (Can be performed periodically or through 100% surveillance.) |
| Incentives: Favorable contactor performance evaluation |
Disincentive: Unfavorable contractor performance evaluation
Disincentive: A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level of service
Two or more issued CDRs may result in potential Termination for Default proceedings
Two or more issued CDRs may result in reduction of the monthly invoice of 5%
5. INCENTIVES/DISINCENTIVES: The Government shall use favorable contractor performance evaluations as incentives. The Government shall report unfavorable contractor performance as disincentives. Disincentives shall include documentation of any performance issues. If repetitive or consistent the government shall take further corrective action or begin termination procedures.
Incentives/disincentives shall be based on exceeding, meeting, or not meeting performance standards.
6. PROCEDURES AND METHODS OF SURVEILLANCE: Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. Direct Observation: COR will monitor the work of the contractor while completing the quarterly PM to ensure all specifications and requirements are fulfilled. After contract is awarded, any incidents of noncompliance as evidenced by the monitoring procedures shall be forwarded immediately to the CO.
b. Complaints: COR will document customer complaints, and perform random checks. Contractor will provide COR a copy of all work orders, and PM checklists upon completion.
c. Periodic Inspection: Scheduled preventive maintenance will be evaluated quarterly. Unscheduled repairs will be evaluated upon completion
d. 100% Inspection: All unscheduled repairs will be inspected upon completion
7. RATINGS: Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Positive outcome: No more than 1 incident of not meeting the performance standard during the period of performance Neutral outcome: No more than 2 incidents of not meeting the performance standard during the period of performance Negative outcome: More than 3 incidents of not meeting the performance standard during the period of performance.
8. DOCUMENTING PERFORMANCE:
a. Acceptable Performance: The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. Unacceptable Performance: When unacceptable performance occurs, the COR shall inform the Contracting Officer (CO). This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR and the CO shall document the discussion and place it in their respective file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the CO. The CO will in turn review and submit to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CDR in writing. The CDR shall specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR shall also state how long after receipt the contractor must present this corrective action plan to the CO and COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement: During contract performance, the COR will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings: The COR shall meet with the contractor quarterly to assess performance and shall provide a written assessment.
File details come from the government source that posted it.