This presolicitation notice announces an upcoming solicitation for construction services to build approximately 14,000 square feet of new space and renovate approximately 4,000 square feet of existing space at a Veterans Affairs Medical Center in Richmond, Virginia. The project involves constructing a Tier III data center to house IT servers, UPS systems, PBX phone switches, and data hubs, as well as administrative support staff offices. Interested contractors should monitor for issuance of the solicitation on or around July 29, 2019, with a bid opening tentatively scheduled for August 29, 2019. The construction value is estimated between $5-10 million. This opportunity is a 100% SDVOSB set-aside. The NAICS code is 236220 for commercial and institutional building construction up to $7.5 million. All interested parties must be verified as an SDVOSB in VETBIZ prior to bid submission.
36C24619B0036 652-317 - Specifications - 052819.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24619B0036-0002000.docx | DOCX document | |
| 36C24619B0036-0002001.pdf | ||
| 36C24619B0036-0001002.pdf | ||
| 36C24619B0036-0001001.docx | DOCX document | |
| 36C24619B0036-008.pdf | ||
| 36C24619B0036-006.pdf | ||
| 36C24619B0036-005.docx | DOCX document | |
| 36C24619B0036-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOWMAN FOSTER
& ASSOCIATES, INC
CONSULTING ENGINEERS 6353 Center Drive, Suite 101 Norfolk, VA 23502 (757) 466-7400
CONSTRUCT OIT SPACE, BUILDING 518
DEPARTMENT OF VETERANS AFFAIRS
RICHMOND, VA
SPECIFICATIONS
FINAL SUBMITTAL
May 29, 2019
BFA Project No. 13-025D VA Project No.:652-317
BOWMAN FOSTER WWW.BFA-ENG.COM SINCE 1961
http://www.bfa-eng.com/ ewarford Virginia
CONSTRUCT OIT SPACE, BUILDING 518 652-317
DEPARTMENT OF VETERAN’S AFFAIRS, RICHMOND, VA
TABLE OF CONTENTS
Division Section Title
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 15 LIST OF DRAWING SHEETS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 GENERAL REQUIREMENTS
01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
01 35 26 SAFETY REQUIREMENTS
01 45 29 TESTING LABORATORY SERVICES
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION WASTE MANAGEMENT
01 91 00 GENERAL COMMISSIONING REQUIREMENTS
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 05 13 MASONRY MORTARING
04 05 16 MASONRY GROUTING
04 20 00 UNIT MASONRY
DIVISION 05 – METALS
05 12 00 STRUCTUAL STEEL FRAMING
05 21 00 STEEL JOIST FRAMING
05 31 00 STEEL DECKING
05 50 00 METAL FABRICATION
05 51 00 METAL STAIRS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 08 00 FACILITY EXTERIOR CLOSURE COMMISSIONING
07 11 13 BITUMINOUS DAMPPROOFING
07 22 00 ROOF AND DECK INSULATION
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE
07 42 13.19 INSULATED METAL WALL PANELS
07 42 13.23 METAL COMPOSITE MATERIAL WALL PANELS
07 52 16.13 STYRENE-BUTADIENE-STYRENE MODIFIED BITUMINOUS MEMBRANE
ROOFING, COLD-APPLIED
07 60 00 FLASHING AND SHEET METAL
07 72 00 ROOF ACCESSORIES
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 HOLLOW METAL DOORS AND FRAMES
08 14 00 INTERIOR WOOD DOORS
08 31 13 ACCESS DOORS AND FRAMES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 13 GLAZED ALUMINUM CURTAIN WALLS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 80 00 GLAZING
08 90 00 LOUVERS AND VENTS
DIVISION 09 - FINISHES
09 05 16 SUBSURFACE PREPARATION FOR FLOOR FINISHES
09 22 16 NON-STRUCTURAL METAL FRAMING
09 29 00 GYPSUM BOARD
09 30 13 CERAMIC/PORCELAIN TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 13 RESILIENT BASE AND ACCESSORIES
09 65 19 RESILIENT TILE FLOORING
09 68 00 CARPETING
09 69 00 ACCESS FLOORING
09 91 00 PAINTING
DIVISION 10 - SPECIALTIES
10 14 00 SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 00 TOILET, BATH AND LAUNDRY ACCESSORIES
10 44 13 FIRE EXTINGUISHER CABINETS
DIVISION 12 - FURNISHINGS
12 24 00 WINDOW SHADES
12 32 00 MANUFACTURED WOOD CASEWORK
12 36 00 COUNTERTOPS
DIVISION 13 -
SPECIAL CONSTRUCTION
13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS
DIVISION 21 - FIRE SUPPRESSION
21 08 00 COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
21 13 13 WET-PIPE SPRINKLER SYSTEMS
21 22 00 CLEAN AGENT FIRE SUPPRESSION SYSTEMS
DIVISION 22 - PLUMBING
22 05 11 COMMON WORK RESULTS FOR PLUMBING
22 05 23 GENERAL-DUTY VALVES FOR PLUMBING PIPING
22 07 11 PLUMBING INSULATION
22 08 00 COMMISSIONING OF PLUMBING SYSTEMS
22 11 00 FACILITY WATER DISTRIBUTION
22 11 23 DOMESTIC WATER PUMPS
22 13 00 FACILITY SANITARY AND VENT PIPING
22 33 00 ELECTRIC DOMESTIC WATER HEATERS
22 40 00 PLUMBING FIXTURES
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 11 COMMON WORK RESULTS FOR HVAC
23 05 12 GENERAL MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
23 05 41 NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 11 HVAC AND BOILER PLANT INSULATION
23 08 00 COMMISSIONING OF HVAC
23 09 23 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC
23 21 13 HYDRONIC PIPING
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 25 00 HVAC WATER TREATMENT
23 34 00 HVAC FANS
23 36 00 AIR TERMINAL UNITS
23 37 00 AIR OUTLETS AND INLETS
23 40 00 HVAC AIR CLEANING DEVICES
23 64 00 PACKAGED WATER CHILLERS
23 74 13 PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS
23 81 23 COMPUTER-ROOM AIR-CONDITIONERS
23 82 00 CONVECTION HEATING AND COOLING UNITS
23 82 16 AIR COILS
DIVISION 26 - ELECTRICAL
26 05 11 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
26 05 13 MEDIUM VOLTAGE CABLES
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION
26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY
26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS
26 11 16 SECONDARY UNIT SUBSTATIONS
26 22 00 LOW-VOLTAGE TRANSFORMERS
26 24 13 DISTRIBUTION SWITCHBOARDS
26 24 16 PANELBOARDS
26 26 00 POWER DISTRIBUTION UNITS FOR STATIC UNINTERRUPTIBLE POWER
SYSTEMS
26 27 26 WIRING DEVICES
26 29 21 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY
26 41 00 FACILITY LIGHTNING PROTECTION
26 43 13 SURGE PROTECTIVE DEVICES
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS
27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
27 05 33 RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS
27 08 00 COMMISSIONING OF COMMUNICATIONS SYSTEMS
27 10 00 CONTROL, COMMUNICATION AND SIGNAL WIRING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 05 13 CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY
28 05 28.33 CONDUITS AND BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY
28 08 00 COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS
28 31 00 FIRE DETECTION AND ALARM
DIVISION 31 - EARTHWORK
31 20 11 EARTH MOVING (SHORT FORM)
31 23 23.33 FLOWABLE FILL
31 31 16 TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS
32 12 16 ASPHALT PAVING
32 17 23 PAVEMENT MARKINGS
DIVISION 33 - UTILITIES
33 10 00 WATER UTILITIES
33 30 00 SANITARY SEWERAGE UTILITIES
33 40 00 STORM DRAINAGE UTILITIES
END OF TABLE OF CONTENTS
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
518.G-001 COVER SHEET
518.G-002 INDEX OF DRAWINGS
LIFE SAFETY
518.F-001 LIFE SAFETY ANALYSIS AND LEGEND
518.F-101 LIFE SAFETY FLOOR PLAN
CIVIL
518.C-001 LEGEND, ABBREVIATIONS AND GNEREAL NOTES
518.C-002 PROJECT NARRATIVE, SEQUENCE OF CONSTRUCTION
518.C-003 EROSION AND SEDIMENT CONTROL NOTES
518.C-004 SEEDING, SOILDS AND MAINTENANCE NOTES
518.C-005 NOTES AND DETAILS
518.C-101 TOPOGRAPHIC SURVEY
518.C-102 EROSION AND SEDIMENT CONTROL PLAN (PHASE I)
518.C-103 EROSION AND SEDIMENT CONTROL PLAN (PHASE II)
518.CD101 SITE DEMOLITION PLAN
518.CS101 SITE LAYOUT PLAN
518.CU101 SITE UTILITY PLAN
518.CG101 SITE GRADING PLAN
518.C-501 SITE DETAILS
518.C-502 SITE DETAILS
518.C-503 SITE DETAILS
518.C-504 SITE DETAILS
518.C-505 SITE DETAILS
518.C-506 SITE DETAILS
518.C-507 SITE DETAILS
STRUCTUAL
518.SS001 STRUCTUAL GENERAL NOTES
518.SS002 STRUCTUAL GENERAL NOTES AND STRUCTUAL SCHEDULES
518.SS101 STRUCTUAL FOUNDATION PLAN
518.SS102 STRUCTUAL ROOF FRAMING AND LOW CANOPY FRAMING PLANS
518.SS103 STRUCTUAL MECHANICAL SCREEN WALL LAYOUT PLAN
518.SS201 STRUCTUAL ELEVATIONS AND DETAILS
518.SS301 STRUCTUAL SECTIONS AND DETAILS
518.SS302 STRUCTUAL SECTIONS AND DETAILS
518.SS501 STRUCTUAL TYPICAL DETAILS
518.SS502 STRUCTUAL TYPICAL DETAILS
ARCHITECTURAL
518.AS001 PARTITION TYPES, LEGENDS, ABBREVIATIONS AND NOTES
518.AS101 FLOOR PLAN
518.AS102 REFLECTED CEILING PLAN
00 01 15 - 2
518.AS103 ROOF PLAN
518.AS104 FINISH PLAN
518.AS105 FURNITURE PLAN
518.AS201 BUILDING ELEVATIONS AND SECTIONS
518.AS301 WALL SECTIONS
518.AS302 WALL SECTIONS
518.AS401 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS
518.AS402 WINDOW ELEVATIONS AND DETAILS
518.AS403 CURTAINWALL DETAILS
518.AS501 DETAILS
518.AS502 DETAILS
518.AS503 DETAILS
518.AS504 DUMPSTER PLAN, SECTIONS AND DETAILS
518.AS601 DOOR SCHEDULE AND DETAILS
518.AS602 ROOM FINISH / COLOR SCHEDULES AND DETAILS
FIRE PROTECTION
518.FA001 FIRE ALARM GENERAL NOTES AND LEGEND
518.FA101 FIRE ALARM FLOOR PLAN – BASE BID
518.FA102 FIRE ALARM FLOOR PLAN – BID DEDUCT #1
518.FA401 ENLARGED FIRE ALARM FLOOR PLAN – BASE BID
518.FA402 ENLARGED FIRE ALARM FLOOR PLAN – BID DEDUCT #1
518.FA501 FIRE ALARM DETAILS
518.FA502 FIRE ALARM DETAILS
FIRE SUPPRESSION
518.FX001 FIRE SUPPRESSION GENERAL NOTES AND LEGEND
518.FX101 FIRE SUPPRESSION FLOOR PLAN
518.FX501 FIRE SUPPRESSION DETAILS
PLUMBING
518.P-001 LEGEND, ABBREVIATIONS AND NOTES
518.P-101 FLOOR PLAN – BASE BID
518.P-102 ROOF PLAN – BASE BID
518.P-601 PLUMBING RISER DIAGRAMS
MECHANICAL
518.M-001 LEGEND, ABBREVIATIONS AND NOTES
518.MH101 DUCTWORK PLAN – BASE BID
518.MP102 PIPING PLAN – BASE BID
518.MH103 ROOF PLAN – BASE BID
518.MH104 DUCTWORK PLAN – DEDUCT #1
518.MP105 PIPING AND ROOF PLANS – DEDUCT #1
518.MH106 DUCTWORK PLAN – DEDUCT #2
518.MH301 SECTION
518.M-401 ENLARGED MECHANICAL ROOM PLANS
518.M-501 DETAILS
518.M-502 DETAILS
518.M-503 DETAILS
518.M-601 FLOW DIAGRAM
518.M-602 SCHEDULES – BASE BID
518.M-603 SCHEDULES – BASE BID
518.M-604 SCHEDULES – BASE BID
00 01 15 - 3
518.M-605 SCHEDULES – DEDUCT #1
518.M-606 SCHEDULES – DEDUCT #1
518.M-607 SCHEDULES – DEDUCT #1
518.M-701 CONTROLS
518.M-702 CONTROLS
518.M-703 CONTROLS
518.M-704 CONTROLS
ELECTRICAL
518.E-001 LEGEND AND ABBREVIATIONS
518.ES101 ELECTRICAL SITE PLAN – NEW WORK
518.ES102 ELECTRICAL SITE PLAN – NEW WORK
518.EL101 LIGHTING PLAN – BASE BID
518.EP102 POWER PLAN – BASE BID
518.EP103 HVAC POWER PLAN – BASE BID
518.EP104 ROOF PLAN – BASE BID
518.EY105 LIGHTNING PROTECTION PLAN – BASE BID
518.EP106 HVAC POWER PLAN – DEDUCT #1
518.EP107 ROOF AND LIGHTING PROTECTION – DEDUCT #1
518.EP401 ENLARGED ELECTRICAL EQUIPMENT LAYOUT PLAN
518.E-501 DETAILS
518.E-502 DETAILS
518.E-503 LIGHTING FIXTURES DETAILS
518.E-504 DETAILS AND SCHEDULE
518.E-601 DIAGRAM
518.E-602 ONE-LINE DIAGRAM
518.E-603 DIAGRAMS
518.E-604 PANELBOARD SCHEDULES
518.E-605 PANELBOARD SCHEDULES
518.E-606 GROUNDING DIAGRAMS
TELECOMMUNICATIONS
518.T-001 LEGEND AND ABBREVIATIONS
518.T-101 TELECOMMUNICATIONS PLAN – BASE BID
518.T-401 ENLARGED TELECOMMUNICATIONS EQUIPMENT LAYOUT PLAN
518.T-501 DETAILS
518.T-502 DETAILS
518.T-601 RISER DIAGRAM
- - - E N D - - -
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including furnish labor and materials and perform work for Construct
OIT Space, Building 518, Richmond, VA, Project No. 652-317 as required by drawings and specifications.
B. The organized site visit will be the only opportunity for potential bidders to visit the site prior to the bid opening. The date, time and location of the organized site visit are identified in the solicitation. Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer.
C. Office of Bowman, Foster & Associates, Inc., as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the
Government without affirmations by Contracting Officer or his duly authorized representative.
D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
E. Prior to commencing work, general contractor shall provide proof that a
OSHA designated “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.
F. Training:
1. All employees of general contractor or subcontractors shall have the
10-hour OSHA Construction Safety course and other relevant competency training, as determined by COR acting as the Construction
Safety Officer with input from the facility Construction Safety
Committee.
2. Submit training records of all such employees for approval before the start of work.
G. VHA Directive 2011-36, Safety and Health during Construction, dated
9/22/2011 in its entirety is made a part of this section.
H. Work hours shall be between 07:00pm and 04:00am. Work other than indicated shall be approved by the COR.
01 00 00 -2
1.2 STATEMENT OF BID ITEM(S)
A. BID DEDUCT NO. 1: Delete ”N+1” from the cooling syaytem – meaning deduct one chiller and one CRAC unit, and associate electrical connections.
C. BID DEDUCT NO. 2: Delete “Hot-Aisle Containment”, mechanical system only.
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. AFTER AWARD OF CONTRACT, one (1) set of specifications and drawings will be furnished. The drawings and specifications will consist of those returned by prospective bidders.
B. Additional sets of drawings may be made by the Contractor, at
Contractor's expense.
1.4 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security escort can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
01 00 00 -3
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the COR for the purpose of security inspections of every area of project.
D. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of (2 to 5) permits shall be issued for General
Contractor and its employees for parking in designated areas only.
1.5 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the
Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the
Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting
Officer, the buildings and utilities may be abandoned and need not be removed.
01 00 00 -4
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The
Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as shown on the drawings.
E. Workmen are subject to rules of Medical Center applicable to their conduct.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by the COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
G. Phasing: The Medical Center must maintain its operation 24 hours a day
7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the
01 00 00 -5 duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
To insure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to
Medical Center Director, COR and Contractor, as follows:
Phase I:
Will include identifying laydown area for work, positioning crane and providing control barriers. See Phasing Plan drawing for specific locations of these items.
Phase II:
Will include steel and deck installation.
Phase III:
Will include installation of the envelope of the building.
Phase IV:
Will include mechanical and electrical systems installation, as well as, interior systems and finishes.
H. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.
Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm
(one inch) above grade. Remove the fence when directed by COR.
I. Utilities Services: Maintain existing utility services for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
01 00 00 -6
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of the COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the
Medical Center Director’s prior knowledge and written approval.
Refer to specification Sections 26 05 11, REQUIREMENTS FOR
ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR COMMUNICATIONS
INSTALLATIONS.
2. Contractor shall submit a request to interrupt any such services to the COR, in writing, 80 hours in advance of proposed interruption.
Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of the COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
J. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
01 00 00 -7
K. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
L. Coordinate the work for this contract with other construction operations as directed by the COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF
ROADWAYS.
1.6 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of areas in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the
Contracting Officer. This report shall list by:
1. Existing condition of site, grounds, utilities, and surroundings.
2. Shall note any discrepancies between drawings and existing conditions at site.
3. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and the COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of the
COR to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by
Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR
52.236-2) and "CHANGES" (FAR 52.243-4 and VAAR 852.236-88).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
01 00 00 -8
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of
Contractor to restore damage caused by Contractor's workmen in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
2. Protection of grounds and existing utilities at all times, from damage. Wherever work is performed, grounds and utilities that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.7 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by the COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.8 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably
01 00 00 -9 interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the
Contractor fails or refuses to repair the damage promptly, the
Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
(FAR 52.236-9)
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
1.9 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the
COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, 01 00 00 -10 repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are indicated on drawings and which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"
(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR
52.236-2).
1.10 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR's review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.11 USE OF ROADWAYS
A. For hauling, use only established public roads and roads on Medical
Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed by the Contractor at Contractor's expense.
When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.
1.12 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to compliance with the following provisions:
1. Permission to use each unit or system must be given by the COR. If the equipment is not installed and maintained in accordance with the
01 00 00 -11 following provisions, the COR will withdraw permission for use of the equipment.
2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.
Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded.
The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.
3. Units shall be properly lubricated, balanced, and aligned.
Vibrations must be eliminated.
4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.
5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.
6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.
B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.
C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.
D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.
1.13 TEMPORARY USE OF EXISTING ELEVATORS
A. Contractor will not be allowed the use of existing elevators. Outside type hoist shall be used by Contractor for transporting materials and equipment.
01 00 00 -12
1.14 TEMPORARY TOILETS
A. Provide where directed, (for use of all Contractor's workmen) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by the COR, provide suitable dry closets where directed. Keep such places clean and free from flies, and all connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.
1.15 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.
B. The Contractor, at Contractor's expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the
Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.
C. Contractor shall install meters at Contractor's expense and furnish the
Medical Center a monthly record of the Contractor's usage of electricity as hereinafter specified.
D. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:
1. Obtain heat by connecting to Medical Center heating distribution system.
E. Electricity (for Construction and Testing): Furnish all temporary electric services.
1. Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat.
01 00 00 -13
1.16 NEW TELEPHONE EQUIPMENT
The contractor shall coordinate with the work of installation of telephone equipment by others. This work shall be completed before the building is turned over to VA.
1.17 TESTS
A. As per specification section 23 05 93 the contractor shall provide a written testing and commissioning plan complete with component level, equipment level, sub-system level and system level breakdowns. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.
B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre-tested.
C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer.
Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.
D. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire complex which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building. Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls and electricity, etc.
E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably short period of time during which operating and environmental conditions remain reasonably constant.
F. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.
01 00 00 -14
1.18 INSTRUCTIONS
A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.
B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.
C. Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed instructions to assigned Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed.
This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage. The Department
01 00 00 -15 of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.
1.19 CONSTRUCTION SIGN
A. Provide a Construction Sign where directed by the COR. All wood members shall be of framing lumber. Cover sign frame with 0.7 mm (24 gage) galvanized sheet steel nailed securely around edges and on all bearings. Provide three 100 by 100 mm (4 inch by 4 inch) posts (or equivalent round posts) set 1200 mm (four feet) into ground. Set bottom of sign level at 900 mm (three feet) above ground and secure to posts with through bolts. Make posts full height of sign. Brace posts with 50 x 100 mm (two by four inch) material as directed.
B. Paint all surfaces of sign and posts two coats of white gloss paint.
Border and letters shall be of black gloss paint, except project title which shall be blue gloss paint.
C. Maintain sign and remove it when directed by the COR.
1.20 SAFETY SIGN
A. Provide a Safety Sign where directed by COR. Face of sign shall be 19 mm (3/4 inch) thick exterior grade plywood. Provide two 100 mm by 100 mm (four by four inch) posts extending full height of sign and 900 mm
(three feet) into ground. Set bottom of sign level at 1200 mm (four feet) above ground.
B. Paint all surfaces of Safety Sign and posts with one prime coat and two coats of white gloss paint. Letters and design shall be painted with gloss paint of colors noted.
C. Maintain sign and remove it when directed by COR.
D. Standard Detail Drawing Number SD10000-02(Found on VA TIL) of safety sign showing required legend and other characteristics of sign is attached hereto and is made a part of this specification.
E. Post the number of accident free days on a daily basis.
M A X
M A X
M I N
A V E R A G E
C
6"
8'-0"
Veterans Affairs
Department of
ALL LETTERING TO BE
PAINTED BLACK WITH
EXCEPTION OF PROJECT
TITLE WHICH IS TO BE
BLUE
PAINT BORDER
MEMBER
BLACK ENAMEL
2"x4" [51x102mm]
FRAME AND BRACES
IN SAME PLANE
METAL FACE
WHITE ENAMEL
2"x4" [51x102mm]
FRAME AND BRACE IN
BACK
BORDER MEMBER
PAINTED BLACK
BACKGROUND TO
BE PAINTED WHITE
METAL FACE
STRETCH METAL
FACE TIGHT, TURN
OVER FRAME AND
SECURE WITH FLAT
HEAD DEFORMED
NAILS.
LETTERING TO BE
HELVETICA STYLE 1 1/2"
[38mm] HIGH TO BE
CENTERED HORIZONTAL
ANY SEAM IN METAL TO
BE FLAT SEAM - SEAMS
TO BE HORIZONTAL AND
OCCUR BETWEEN LINES
OF LETTERING.
NOTE:
4"x4" [102x102mm]
POSTS PAINTED WHITE
SECTION ON CENTERLINEELEVATION
THIS SPACE FOR CONTRACTOR'S NAME
ONE OR TWO LINES AS REQUIRED
THIS SPACE FOR PROJECT TITLE LETTERING
TO BE HELVETICA STYPE 5" HIGH CENTERED
BETWEEN LETTERING ABOVE AND BELOW
ONE OR TWO LINES AS REQUIRED
DESIGNED AND SUPERVISED BY:
DEPARTMENT OF VETERANS AFFAIRS
WASHINGTON D.C.
GENERAL CONTRACTOR
CENTER TO BE WHITE
SURROUNDING
BORDER TO BLUE
L[152mm]
[2438mm] m m m m m m
V A R I E S m m m m
V A R I E S m m m m
V A R I E S m m m m m m m m m m m m m m m m
CONSTRUCTION SIGN
NTS
S C A L E
C A D
D E T A I L
N O
D
T E
I S S U E
DE
TA
IL
T
IT
LE
C O N S T R U C T I O N
S I G N
S D D W G
D E C E M B E R
N O N
V A R I E S
CONTRACTOR'S NAME
THE LIFE YOU SAVE MAY BE YOUR OWN
WITHOUT A LOST TIME ACCIDENT
0 0 0 DAYSHAS WORKED
THIS PROJECT
ON SAFETYin
ZERO
Department of Veterans Affairs
4'-0"
[1219mm] m m m m
BLUE
BLUE OUTLINE
WITH WHITE
INTERIOR
JOINT BRACING
RED
WHITE
BLUE
BRACING SEE
CONSTRUCTION
SIGN DETAIL
01010-1 m m m m m m m m m m
4"x4" [102x102mm]
POST IF SIGN IS
INSTALLED ON GRADE
FIN. GRADE
WOOD STRIPS
NTS
SAFETY SIGN
ELEVATION
S C A L
C
D
D E T A I L
N O
T E
I S S U E
DE
TA
IL
T
IT
LE
S A F E T Y
S I G N
S D D W G
D E C E M B E R
N O N
01 33 23 - 1
SECTION 01 33 23
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
1-1. For the purposes of this contract, samples, test reports, certificates, and manufacturers' literature and data shall also be subject to the previously referenced requirements. The following text refers to all items collectively as SUBMITTALS.
1-3. Submit for approval, all of the items specifically mentioned under the separate sections of the specification, with information sufficient to evidence full compliance with contract requirements. Materials, fabricated articles and the like to be installed in permanent work shall equal those of approved submittals. After an item has been approved, no change in brand or make will be permitted unless:
A. Satisfactory written evidence is presented to, and approved by
Contracting Officer, that manufacturer cannot make scheduled delivery of approved item or;
B. Item delivered has been rejected and substitution of a suitable item is an urgent necessity or;
C. Other conditions become apparent which indicates approval of such substitute item to be in best interest of the Government.
1-4. Forward submittals in sufficient time to permit proper consideration and approval action by Government. Time submission to assure adequate lead time for procurement of contract - required items. Delays attributable to untimely and rejected submittals will not serve as a basis for extending contract time for completion.
1-5. Submittals will be reviewed for compliance with contract requirements by Architect-Engineer, and action thereon will be taken by COR on behalf of the Contracting Officer.
1-6. Upon receipt of submittals, Architect-Engineer will assign a file number thereto. Contractor, in any subsequent correspondence, shall refer to this file and identification number to expedite replies relative to previously approved or disapproved submittals.
1-7. The Government reserves the right to require additional submittals, whether or not particularly mentioned in this contract. If additional submittals beyond those required by the contract are furnished pursuant to request therefore by Contracting Officer, adjustment in contract price and time will be made in accordance with Articles titled CHANGES
01 33 23 - 2
(FAR 52.243-4) and CHANGES - SUPPLEMENT (VAAR 852.236-88) of the
GENERAL CONDITIONS.
1-8. Schedules called for in specifications and shown on shop drawings shall be submitted for use and information of Department of Veterans Affairs and Architect-Engineer. However, the Contractor shall assume responsibility for coordinating and verifying schedules. The
Contracting Officer and Architect- Engineer assumes no responsibility for checking schedules or layout drawings for exact sizes, exact numbers and detailed positioning of items.
1-9. Submittals must be submitted by Contractor only and shipped prepaid.
Contracting Officer assumes no responsibility for checking quantities or exact numbers included in such submittals.
A. Submit samples required in single units unless otherwise specified.
Submit shop drawings, schedules, manufacturers' literature and data, and certificates in quadruplicate, except where a greater number is specified.
B. Submittals will receive consideration only when covered by a transmittal letter signed by Contractor. Letter shall be sent via first class mail and shall contain the list of items, name of Medical Center, name of Contractor, contract number, applicable specification paragraph numbers, applicable drawing numbers (and other information required for exact identification of location for each item), manufacturer and brand, ASTM or Federal Specification Number (if any) and such additional information as may be required by specifications for particular item being furnished. In addition, catalogs shall be marked to indicate specific items submitted for approval.
1. A copy of letter must be enclosed with items, and any items received without identification letter will be considered "unclaimed goods" and held for a limited time only.
2. Each sample, certificate, manufacturers' literature and data shall be labeled to indicate the name and location of the Medical Center, name of Contractor, manufacturer, brand, contract number and ASTM or
Federal Specification Number as applicable and location(s) on project.
3. Required certificates shall be signed by an authorized representative of manufacturer or supplier of material, and by
Contractor.
01 33 23 - 3
C. If submittal samples have been disapproved, resubmit new samples as soon as possible after notification of disapproval. Such new samples shall be marked "Resubmitted Sample" in addition to containing other previously specified information required on label and in transmittal letter.
D. Approved samples will be kept on file by the COR at the site until completion of contract, at which time such samples will be delivered to
Contractor as Contractor's property. Where noted in technical sections of specifications, approved samples in good condition may be used in their proper locations in contract work. At completion of contract, samples that are not approved will be returned to Contractor only upon request and at Contractor's expense. Such request should be made prior to completion of the contract. Disapproved samples that are not requested for return by Contractor will be discarded after completion of contract.
E. Submittal drawings (shop, erection or setting drawings) and schedules, required for work of various trades, shall be checked before submission by technically qualified employees of Contractor for accuracy,…