Renovate Various Halls and Walls Project# 652-19-102
Solicitation number
36C24619B0035
Issued by

About this file

36C24619B0035 0002 S06 Attachment I Annex A Concept Design Drawings Rev 26 Jul Final for Bid.pdf

View the file

Other files

File Type Posted
36C24619C0106-000.docx DOCX document
36C24619B0035-0002002.docx DOCX document
36C24619B0035-0001000.docx DOCX document
36C24619B0035-0001001.pdf PDF
36C24619B0035-003.pdf PDF
36C24619B0035-005.pdf PDF
36C24619B0035-004.pdf PDF
36C24619B0035-002.pdf PDF
36C24619B0035-007.pdf PDF
36C24619B0035-006.pdf PDF
36C24619B0035-001.docx DOCX document
36C24619B0035-000.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Location Project Director

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

G001

COVER SHEET / DRAWING INDEX

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

RENOVATE VARIOUS HALLS AND

WALLS

Project Location

652-19-102

Project Director

04 MAR 2019Revisions: Date:

RENOVATE VARIOUS HALLS AND WALLS

HH McGUIRE VA MEDICAL CENTER

RICHMOND, VIRGINIA

CONSTRUCTION DOCUMENTS

SIGNATURESSIGNATURES DRAWING INDEX

G001 COVER SHEET / DRAWING INDEX

A101 PHASING PLAN AND NOTES - FIRST FLOOR

A102 PHASING PLAN AND NOTES - SECOND FLOOR

A103 NEW WORK PLAN - FIRST FLOOR

A104 NEW WORK PLAN - 2E AND 2H AREAS

A105 NEW WORK PLAN - 2F AND 2C AREAS

A106 REFLECT CEILING PLAN - FIRST FLOOR

A107 REFLECTED CEILING PLAN - 2E AND 2H AREAS

A108 REFLECTED CEILING PLAN - 2F AND 2C AREAS

A109 MISCELLANEOUS DETAILS AND SCHEDULES

C:\Users\VHARICStileR\Desktop\force Package\sketches\CAD\1st fl.dwg, 3/12/2019 8:47:21 AM, _AutoCAD PDF (General Documentation).pc3

AutoCAD SHX Text

COTR - ILSM & ICRA COMPLETED

AutoCAD SHX Text

APPROVED: INFECTION CONTROL

AutoCAD SHX Text

APPROVED: PROJECT ENGINEER

AutoCAD SHX Text

APPROVED: CHIEF OF HR

AutoCAD SHX Text

APPROVED: CHIEF, ENGINEERING

AutoCAD SHX Text

APPROVED: ASSOCIATE DIRECTOR FOR PATIENT CARE SERVICES

AutoCAD SHX Text

APPROVED: CHIEF OF STAFF

AutoCAD SHX Text

APPROVED: ASSOCIATE DIRECTOR FOR OPERATIONS

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: DIRECTOR, RICHMOND VA MEDICAL CENTER

AutoCAD SHX Text

APPROVED: CHIEF OF EDUCATION

AutoCAD SHX Text

DATE:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A101

PHASING PLAN - FIRST FLOOR

A

F i l e

P a t h

P

M

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

RENOVATE VARIOUS HALLS AND

WALLS

RICHMOND VAMC

652-19-102

Project Director

04 MARCH 2019Revisions: Date:

Scale: 1/8" = 1'

PHASING PLAN VIEW - 1M AREA

LEGEND

SUGGESTED PHASING AREA BOUNDARIES

AREA 1M PHASING NOTES

1. THE CONTRACTOR SHALL DEVELOP AND SUBMIT FOR APPROVAL A

PHASING PLAN INDICATING HOW THE WORK WILL BE ACCOMPLISHED

WITHOUT IMPACTING PATIENT CARE. THE PHASES ARE INDICATED ON

THE DRAWING. THE CONTRACTOR SHALL EXECUTE THE PHASES IN

SEQUENTIAL ORDER INDICATED. PHASES MAY ONLY BE COMBINED AT

THE APPROVAL OF THE VA.

2. THE CONTRACTOR SHALL MEET WITH AFFECTED VA PERSONNEL IN THE

AREA TO BRIEF THE PERSONNEL ON THE PHASING PLAN AND TO ANSWER

QUESTIONS RELATED TO THE WORK. THE MEETING WILL BE SCHEDULED

A MINIMUM OF 2 WEEKS PRIOR TO START OF WORK IN THE AREA. THE

CONTRACTOR SHALL COLLECT AND MAINTAIN VA POINTS OF CONTACT

FOR AFFECTED PERSONNEL IN THE AREA, TO INCLUDE BUT NOT LIMITED

TO SERVICE CHIEFS AND NURSE MANAGERS.

3. PHASES IN THIS AREA WILL BE WORKED ON DURING NON-BUSINESS HOUR

(7:00PM TO 5:00 AM) SHIFTS.

4. ICRA BARRIERS ARE TO BE ERECTED AT THE BEGINNING OF EACH SHIFT

AND NEGATIVE PRESSURE ESTABLISHED. IN THE EVENT OF AN

EMERGENCY, BARRIERS SHALL BE CAPABLE OF BEING QUICKLY REMOVED

BY VA PERSONNEL. SIGNAGE SHALL BE PLACED ON THE BARRIERS

PROVIDING INSTRUCTIONS ON HOW TO REMOVE THE BARRIERS QUICKLY

TO PROVIDE EGRESS.

5. THE ACTIVE CONSTRUCTION AREAS SHALL BE CLEANED EACH MORNING

TO PREVENT TRACKING OF DUST AND SHALL BE SECURED IN A MANNER

TO ALLOW FOOT TRAFFIC TO PASS THROUGH THE INACTIVE

CONSTRUCTION ZONE DURING THE DAY. BARE CONCRETE SHALL HAVE A

PATH COVERED WITH FLOOR PROTECTION BOARD (RAM BOARD) WITH

SEAMS AND EDGES TAPED TO PREVENT MOVEMENT. PATH SHALL BE

DELINEATED WITH PEDESTRIAN CONTROL BARRIERS (REMOVABLE TAPE

TYPE WITH POSTS) TO GUIDE PEDESTRIANS ON THE PATH THROUGH THE

CONSTRUCTION ZONE. WHILE CEILING IS NOT IN PLACE, A TEMPORARY

CEILING (OR COVERS) SHALL BE ERECTED OVER THE PATH HAVING A

MINIMUM OF 7' CLEARANCE.

6. IN A GIVEN PHASE, DEMOLITION OF THE FLOORING (WHICH HAS MASTIC

CONTAINING ASBESTOS) MUST BE ABATED IN A SINGLE NIGHT SHIFT. NO

EXPOSED ASBESTOS OR WASTE SHALL BE LEFT ON THE SIGHT AFTER THE

FIRST NIGHT SHIFT.

PHASE 1M-1

PHASE 1M-3

P H

A S

E

M

PHASE 1M-5

P H

A S

E

M

C:\Users\VHARICStileR\Desktop\force Package\sketches\CAD\1st fl.dwg, 3/12/2019 8:47:27 AM, _AutoCAD PDF (General Documentation).pc3

AutoCAD SHX Text

48" HIGH WALL

AutoCAD SHX Text

FC

AutoCAD SHX Text

FC

AutoCAD SHX Text

COVER

AutoCAD SHX Text

E.J. PLATE

AutoCAD SHX Text E.J.

AutoCAD SHX Text

CARE

AutoCAD SHX Text

COMMUNITY

AutoCAD SHX Text

CARE

AutoCAD SHX Text

COMMUNITY

AutoCAD SHX Text

FC

AutoCAD SHX Text

BLINDED VET ASSOC 1M-118

AutoCAD SHX Text

VOLUNTEER STORAGE 1M-117

AutoCAD SHX Text

PATIENT LAUNDRY 1M-122

AutoCAD SHX Text

PRESIDENT OFFICE 1M-121B

AutoCAD SHX Text

VICE PRESIDENT 1M-121A

AutoCAD SHX Text

EMS EQUIP STORAGE 1M-123

AutoCAD SHX Text

CHIEF STEWARD 1M-121C

AutoCAD SHX Text

DIETARY 1M-125

AutoCAD SHX Text

UNION OFFICE 1M-121

AutoCAD SHX Text

CORRIDOR C1M-4

AutoCAD SHX Text

COOK/CHILL 1M-124

AutoCAD SHX Text

STAIR 13

AutoCAD SHX Text

NURSING 1M-149

AutoCAD SHX Text

COPY RM 1M-150

AutoCAD SHX Text

MALE VISITORS TOILET 1M-148

AutoCAD SHX Text

CORRIDOR C1M-5

AutoCAD SHX Text

CLINICAL DIETICIAN 1M-146

AutoCAD SHX Text

SOCIAL WORK OFFICE 1M-145

AutoCAD SHX Text

CORRIDOR C1M-10

AutoCAD SHX Text

WARD PHYSICIAN 1M-144

AutoCAD SHX Text

MULTI-USE OFFICE 1M-143

AutoCAD SHX Text

CORRIDOR C1M-7

AutoCAD SHX Text

OFFICE 1M-147

AutoCAD SHX Text

OFFICE 1M-147A

AutoCAD SHX Text

DIRECTOR GERIATRICS FELLOWSHIP TRAINING PROGRAM 1M-134

AutoCAD SHX Text

DIETICIAN OFFICE 1M-126

AutoCAD SHX Text

SOCIAL WORKER 1M-126A

AutoCAD SHX Text

FEMALE PATIENT TIOLET 1M-127

AutoCAD SHX Text

ELECTRICAL CLOSET 1M-128

AutoCAD SHX Text

CORRIDOR C1M-6

AutoCAD SHX Text

STORAGE 1M-132

AutoCAD SHX Text

OFFICE 1M-133

AutoCAD SHX Text

STORAGE 1M-136

AutoCAD SHX Text

OFFICE 1M-137

AutoCAD SHX Text

KINISEOTHERAPY 1M-135

AutoCAD SHX Text

OCCUPATIONAL THERAPY 1M-131

AutoCAD SHX Text

RECREATION THERAPY 1M-130

AutoCAD SHX Text

DINING RM 1M-129

AutoCAD SHX Text

ELECTRICAL SVC BAY 1M-152

AutoCAD SHX Text

MECHANICAL SVC BAY-L 1M-151

AutoCAD SHX Text ? 1M-120

AutoCAD SHX Text

BEVERAGE STOCK RM 1M-154

AutoCAD SHX Text

CORRIDOR C1M-13

AutoCAD SHX Text

VENDING CLOSET ?

AutoCAD SHX Text

CANTEEN 1M-155

AutoCAD SHX Text

OFFICE 1M-156

AutoCAD SHX Text

DISH RM 1M-158

AutoCAD SHX Text

OFFICE 1M-119

AutoCAD SHX Text

OFFICE 1M-141B

AutoCAD SHX Text

LOBBY C1M-11

AutoCAD SHX Text

PGMME ASST GERIATRICS EXTENDED CARE OFFICE 1M-141A

AutoCAD SHX Text

COMMUNITY LIVING CENTER ROS COORDINATOR 1M-141

AutoCAD SHX Text

ADMIN OFFICER 1M-139

AutoCAD SHX Text

BARBER SHOP 1M-142

AutoCAD SHX Text

SVC LINE CHIEF GERIATRICS EXTENDED CARE 1M-140

AutoCAD SHX Text

CORRIDOR C1M-8

AutoCAD SHX Text

FEMALE VISITORS TOILET 1M-138

AutoCAD SHX Text

VESTIBULE C1M-12

AutoCAD SHX Text

OFFICE 1N-101

AutoCAD SHX Text

OFFICE 1N-100

AutoCAD SHX Text

2 BED RM 1N-102

AutoCAD SHX Text

PATIENT TOILET 1N-103

AutoCAD SHX Text

2 BED RM 1N-106

AutoCAD SHX Text

PATIENT TOILET 1N-107

AutoCAD SHX Text

2 BED RM 1N-110

AutoCAD SHX Text

TOILET 1N-111

AutoCAD SHX Text

TOILET 1N-169

AutoCAD SHX Text

CORRIDOR C1N-7

AutoCAD SHX Text

PATIENT TOILET 1N-171

AutoCAD SHX Text

PATIENT TOILET 1N-173

AutoCAD SHX Text

PATIENT TOILET 1N-175

AutoCAD SHX Text

NURSE OFFICE 1N-177

AutoCAD SHX Text

LAUNDRY 1N-178

AutoCAD SHX Text

2 BED RM 1N-104

AutoCAD SHX Text

PATIENT TOILET 1N-105

AutoCAD SHX Text

CORRIDOR C1N-8

AutoCAD SHX Text

TOILET 1N-109

AutoCAD SHX Text

CORRIDOR C1P-2

AutoCAD SHX Text

CORRIDOR C1P-1

AutoCAD SHX Text

CORRIDOR C1P-9

AutoCAD SHX Text

COMM CARE MEDICINE SUPPORT OFFICE 1P-100

AutoCAD SHX Text

COMM CARE CO-ORDR OFFICE 1P-100A

AutoCAD SHX Text

OFFICE 1P-105

AutoCAD SHX Text

OFFICE 1P-105A

AutoCAD SHX Text

2 BED RM 1P-106

AutoCAD SHX Text

TOILET 1P-107

AutoCAD SHX Text

2 BED RM 1P-109

AutoCAD SHX Text

PATIENT TOILET 1P-110

AutoCAD SHX Text

2 BED RM 1P-112

AutoCAD SHX Text

TOILET 1P-113

AutoCAD SHX Text

2 BED RM 1P-114

AutoCAD SHX Text

PATIENT TOILET 1P-115

AutoCAD SHX Text

STAFF TOILET 1P-170

AutoCAD SHX Text

PATIENT TOILET 1P-173

AutoCAD SHX Text

2 BED RM 1P-172

AutoCAD SHX Text

TOILET 1P-175

AutoCAD SHX Text

2 BED RM 1P-174

AutoCAD SHX Text

PATIENT TOILET 1P-178

AutoCAD SHX Text

2 BED RM 1P-177

AutoCAD SHX Text

TOILET 1P-180

AutoCAD SHX Text

2 BED RM 1P-179

AutoCAD SHX Text

STAFF TOILET 1P-182

AutoCAD SHX Text

LOUNGE 1P-181

AutoCAD SHX Text

COMM CONTRACT OFFICE 1P-183

AutoCAD SHX Text

HAC 1P-184

AutoCAD SHX Text

TOILET 1P-103

AutoCAD SHX Text

TOILET 1P-101

AutoCAD SHX Text

FEMALE LOCKERS 1P-102

AutoCAD SHX Text

HAC 1P-104

AutoCAD SHX Text

CONFERENCE RM 1P-108

AutoCAD SHX Text

EXAM RM 1P-111

AutoCAD SHX Text

NURSE MANAGER 1P-176

AutoCAD SHX Text

PATIENT TOILET 1P-117

AutoCAD SHX Text

CONGREGATE BATH 1P-116

OFFICE 1M-142A

FOR CONSTRUCTION

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A103

NEW WORK PLAN - FIRST FLOOR

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

RENOVATE VARIOUS HALLS AND

WALLS

RICHMOND VAMC

652-19-102

Project Director

04 MARCH 2019Revisions: Date:

Scale: 1/8" = 1'

PLAN VIEW - 1M AREA

LEGEND

FINISH REPLACEMENT, WHICH INCLUDES FLOORING, PAINT, WALL BASE,

HAND RAILS, UPPER AND LOWER CRASH GUARDS, AND CORNER

GUARDS. USE MATERIALS IN FINISH SCHEDULE "SCHEME A". SEE

SHEET A109

AREA TO RECEIVE ONLY PAINT, UPPER AND LOWER CRASH GUARDS,

AND CORNER GUARDS. USE MATERIAL LISTED IN FINISH SCHEDULE

"SCHEME A". SEE SHEET A109

SCOPE OF WORK

PREPARATORY WORK

1. THE CONTRACTOR SHALL SUBMIT A VINYL TILE PATTERN APPLICATION PLAN

FOR VA APPROVAL. THE PLAN MUST BE SUBMITTED AND APPROVED PRIOR TO

THE START OF ANY WORK IN THE 1M AREA. THE PLAN SHALL SHOW HOW THE

VINYL TILE SHALL BE PATTERNED ON THE FLOOR AND HOW INTERSECTIONS

AND CORNERS SHALL BE LAID OUT. THE PLAN SHALL ALSO ILLUSTRATE HOW

INTERFACES BETWEEN EXISTING AND NEW TILE SHALL OCCUR.

DEMOLITION

1. THE CONTRACTOR SHALL DEMOLISH EXISTING FLOORING (SEE ASBESTOS

ABATEMENT BELOW), HANDRAILS, CRASH GUARDS (UPPER AND LOWER), WALL

PAPER AS NECESSARY, AND CORNER GUARDS.

2. THE CONTRACTOR SHALL SAVE IN PLACE OR REMOVE AND REINSTALL ALL

ITEMS ATTACHED TO THE WALL NOT DESIGNATED ABOVE FOR DEMOLITION.

CARE SHALL BE TAKEN TO NOT DAMAGE ANY EXISTING WALL MOUNTED ITEMS.

THE CONTRACTOR IS RESPONSIBLE TO REPLACE IN KIND, AT NO COST TO THE

GOVERNMENT, ANY ATTACHED WALL MOUNTED ITEMS TO REMAIN THAT ARE

DAMAGED DURING THE EXECUTION OF THE WORK.

3. EXCLUSIONS:

3.1. CERAMIC WALL TILE AROUND WATER FOUNTAINS.

3.2. CERAMIC FLOOR TILE UNDER WATER FOUNTAINS, AND IN THE ENTRANCE

TO THE CANTEEN AREA (SEE SPECIAL NOTE A)

ASBESTOS ABATEMENT

1. ORIGINAL VINYL TILE TO BE DEMOLISHED IS GLUED DOWN USING A MASTIC THAT

CONTAINS TRACES OF ASBESTOS.

2. DEMOLITION OF THE VINYL TILE SHALL BE CARRIED OUT WITH A LICENSED

ASBESTOS ABATEMENT CONTRACTOR IN ACCORDANCE WITH ALL FEDERAL

REGULATIONS AND THE CONTRACT SPECIFICATIONS.

3. ASBESTOS ABATEMENT SHALL OCCUR PRIOR TO ANY OTHER DEMOLITION OR

WORK IN THE DESIGNATED SPACE.

NEW WORK

1. THE CONTRACTOR SHALL PREPARE DRYWALL TO RECEIVE PAINT. ALL DEFECTS

SHALL BE REPAIRED AND THE SURFACE SMOOTHED (SKIM-COATED) AS

NECESSARY TO PROVIDE A CLEAN AND NEAT FINISHED PRODUCT.

2. APPLY PRIMER AND TWO COATS OF PAINT COLOR AS INDICATED IN THE FINISH

SCHEDULE. PAINT COATS SHALL BE FREE OF DEFECT AND HOLIDAYS AND BE

SMOOTH IN APPEARANCE AND CONTINUOUS IN COLOR.

3. INSTALL FLOORING IN LOCATIONS INDICATED AND IN ACCORDANCE WITH THE

APPROVED PATTERN APPLICATION PLAN. INTERFACES WITH EXISTING TILE IN

CORRIDORS SHALL BE INTEGRATED TO MINIMIZE THE DIFFERENCE BETWEEN

THE NEW AND EXISTING. IN AREAS WHERE THERE IS SIGNIFICANT DIFFERENCES

(SUCH AS IN A DOORWAY TO AN OFFICE WITH CARPET OR OTHER MATERIAL) A

TRANSITION STRIP SHALL BE UTILIZED.

4. INSTALL WALL BASE, HANDRAILS, UPPER AND LOWER CRASH RAILS, AND

CORNER GUARDS AS SPECIFIED IN FINISH SCHEDULE

SPECIAL NOTES

AREA SHALL ONLY RECEIVE PAINT, HAND RAILS, UPPER AND LOWER CRASH

GUARDS, AND CORNER GUARDS. CERAMIC FLOOR TILE TO REMAIN IN PLACE.

A

A

C:\Users\VHARICStileR\Desktop\force Package\sketches\CAD\1st fl.dwg, 3/12/2019 8:47:33 AM, _AutoCAD PDF (General Documentation).pc3

AutoCAD SHX Text

48" HIGH WALL

AutoCAD SHX Text

FC

AutoCAD SHX Text

FC

AutoCAD SHX Text

COVER

AutoCAD SHX Text

E.J. PLATE

AutoCAD SHX Text E.J.

AutoCAD SHX Text

CARE

AutoCAD SHX Text

COMMUNITY

AutoCAD SHX Text

CARE

AutoCAD SHX Text

COMMUNITY

AutoCAD SHX Text

FC

AutoCAD SHX Text

BLINDED VET ASSOC 1M-118

AutoCAD SHX Text

VOLUNTEER STORAGE 1M-117

AutoCAD SHX Text

PATIENT LAUNDRY 1M-122

AutoCAD SHX Text

PRESIDENT OFFICE 1M-121B

AutoCAD SHX Text

VICE PRESIDENT 1M-121A

AutoCAD SHX Text

EMS EQUIP STORAGE 1M-123

AutoCAD SHX Text

CHIEF STEWARD 1M-121C

AutoCAD SHX Text

DIETARY 1M-125

AutoCAD SHX Text

UNION OFFICE 1M-121

AutoCAD SHX Text

CORRIDOR C1M-4

AutoCAD SHX Text

COOK/CHILL 1M-124

AutoCAD SHX Text

STAIR 13

AutoCAD SHX Text

NURSING 1M-149

AutoCAD SHX Text

COPY RM 1M-150

AutoCAD SHX Text

MALE VISITORS TOILET 1M-148

AutoCAD SHX Text

CORRIDOR C1M-5

AutoCAD SHX Text

CLINICAL DIETICIAN 1M-146

AutoCAD SHX Text

SOCIAL WORK OFFICE 1M-145

AutoCAD SHX Text

CORRIDOR C1M-10

AutoCAD SHX Text

WARD PHYSICIAN 1M-144

AutoCAD SHX Text

MULTI-USE OFFICE 1M-143

AutoCAD SHX Text

CORRIDOR C1M-7

AutoCAD SHX Text

OFFICE 1M-147

AutoCAD SHX Text

OFFICE 1M-147A

AutoCAD SHX Text

DIRECTOR GERIATRICS FELLOWSHIP TRAINING PROGRAM 1M-134

AutoCAD SHX Text

DIETICIAN OFFICE 1M-126

AutoCAD SHX Text

SOCIAL WORKER 1M-126A

AutoCAD SHX Text

FEMALE PATIENT TIOLET 1M-127

AutoCAD SHX Text

ELECTRICAL CLOSET 1M-128

AutoCAD SHX Text

CORRIDOR C1M-6

AutoCAD SHX Text

STORAGE 1M-132

AutoCAD SHX Text

OFFICE 1M-133

AutoCAD SHX Text

STORAGE 1M-136

AutoCAD SHX Text

OFFICE 1M-137

AutoCAD SHX Text

KINISEOTHERAPY 1M-135

AutoCAD SHX Text

OCCUPATIONAL THERAPY 1M-131

AutoCAD SHX Text

RECREATION THERAPY 1M-130

AutoCAD SHX Text

DINING RM 1M-129

AutoCAD SHX Text

ELECTRICAL SVC BAY 1M-152

AutoCAD SHX Text

MECHANICAL SVC BAY-L 1M-151

AutoCAD SHX Text ? 1M-120

AutoCAD SHX Text

BEVERAGE STOCK RM 1M-154

AutoCAD SHX Text

CORRIDOR C1M-13

AutoCAD SHX Text

VENDING CLOSET ?

AutoCAD SHX Text

CANTEEN 1M-155

AutoCAD SHX Text

OFFICE 1M-156

AutoCAD SHX Text

DISH RM 1M-158

AutoCAD SHX Text

OFFICE 1M-119

AutoCAD SHX Text

OFFICE 1M-141B

AutoCAD SHX Text

LOBBY C1M-11

AutoCAD SHX Text

PGMME ASST GERIATRICS EXTENDED CARE OFFICE 1M-141A

AutoCAD SHX Text

COMMUNITY LIVING CENTER ROS COORDINATOR 1M-141

AutoCAD SHX Text

ADMIN OFFICER 1M-139

AutoCAD SHX Text

BARBER SHOP 1M-142

AutoCAD SHX Text

SVC LINE CHIEF GERIATRICS EXTENDED CARE 1M-140

AutoCAD SHX Text

CORRIDOR C1M-8

AutoCAD SHX Text

FEMALE VISITORS TOILET 1M-138

AutoCAD SHX Text

VESTIBULE C1M-12

AutoCAD SHX Text

OFFICE 1N-101

AutoCAD SHX Text

OFFICE 1N-100

AutoCAD SHX Text

2 BED RM 1N-102

AutoCAD SHX Text

PATIENT TOILET 1N-103

AutoCAD SHX Text

2 BED RM 1N-106

AutoCAD SHX Text

PATIENT TOILET 1N-107

AutoCAD SHX Text

2 BED RM 1N-110

AutoCAD SHX Text

TOILET 1N-111

AutoCAD SHX Text

TOILET 1N-169

AutoCAD SHX Text

CORRIDOR C1N-7

AutoCAD SHX Text

PATIENT TOILET 1N-171

AutoCAD SHX Text

PATIENT TOILET 1N-173

AutoCAD SHX Text

PATIENT TOILET 1N-175

AutoCAD SHX Text

NURSE OFFICE 1N-177

AutoCAD SHX Text

LAUNDRY 1N-178

AutoCAD SHX Text

2 BED RM 1N-104

AutoCAD SHX Text

PATIENT TOILET 1N-105

AutoCAD SHX Text

CORRIDOR C1N-8

AutoCAD SHX Text

TOILET 1N-109

AutoCAD SHX Text

CORRIDOR C1P-2

AutoCAD SHX Text

CORRIDOR C1P-1

AutoCAD SHX Text

CORRIDOR C1P-9

AutoCAD SHX Text

COMM CARE MEDICINE SUPPORT OFFICE 1P-100

AutoCAD SHX Text

COMM CARE CO-ORDR OFFICE 1P-100A

AutoCAD SHX Text

OFFICE 1P-105

AutoCAD SHX Text

OFFICE 1P-105A

AutoCAD SHX Text

2 BED RM 1P-106

AutoCAD SHX Text

TOILET 1P-107

AutoCAD SHX Text

2 BED RM 1P-109

AutoCAD SHX Text

PATIENT TOILET 1P-110

AutoCAD SHX Text

2 BED RM 1P-112

AutoCAD SHX Text

TOILET 1P-113

AutoCAD SHX Text

2 BED RM 1P-114

AutoCAD SHX Text

PATIENT TOILET 1P-115

AutoCAD SHX Text

STAFF TOILET 1P-170

AutoCAD SHX Text

PATIENT TOILET 1P-173

AutoCAD SHX Text

2 BED RM 1P-172

AutoCAD SHX Text

TOILET 1P-175

AutoCAD SHX Text

2 BED RM 1P-174

AutoCAD SHX Text

PATIENT TOILET 1P-178

AutoCAD SHX Text

2 BED RM 1P-177

AutoCAD SHX Text

TOILET 1P-180

AutoCAD SHX Text

2 BED RM 1P-179

AutoCAD SHX Text

STAFF TOILET 1P-182

AutoCAD SHX Text

LOUNGE 1P-181

AutoCAD SHX Text

COMM CONTRACT OFFICE 1P-183

AutoCAD SHX Text

HAC 1P-184

AutoCAD SHX Text

TOILET 1P-103

AutoCAD SHX Text

TOILET 1P-101

AutoCAD SHX Text

FEMALE LOCKERS 1P-102

AutoCAD SHX Text

HAC 1P-104

AutoCAD SHX Text

CONFERENCE RM 1P-108

AutoCAD SHX Text

EXAM RM 1P-111

AutoCAD SHX Text

NURSE MANAGER 1P-176

AutoCAD SHX Text

PATIENT TOILET 1P-117

AutoCAD SHX Text

CONGREGATE BATH 1P-116

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Location Project Director

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A106

REFLECTED CEILING PLAN -

FIRST FLOOR

A

F i l e

P a t h

P

M

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

RENOVATE VARIOUS HALLS AND

WALLS

Project Location

652-19-102

Project Director

04 MARCH 2019Revisions: Date:

Scale: 1/8" = 1'

REFLECTED CEILING PLAN - 1M AREA

LEGEND

NEW ACOUSTIC CEILING, TYPE AT-1 (SEE SHEET A109)

RECESSED LED LIGHT TROFFER TYPE A (SEE SHEET A109)

EXIT SIGN, EDGE LIT, LED (SEE SHEET A109)

CEILING SCOPE OF WORK

DEMOLITION

1. CONTRACTOR SHALL DEMOLISH CEILING TILES, CEILING GRID AND EXIT SIGNS.

2. ALL OTHER CEILING MOUNTED ITEMS SHALL BE SAVED IN PLACE (SUSPENDED

UNTIL NEW CEILING IS IN INSTALLED), OR REMOVED AND REINSTALLED IN

EXACTLY THE SAME LOCATION. ITEMS TO BE SAVED IN PLACE INCLUDE BUT

ARE NOT LIMITED TO SPEAKERS, WIFI ACCESS POINTS, CAMERAS, CELLULAR

ACCESS POINTS, AND SO FORTH. ITEMS THAT ARE TO BE REMOVED AND

REINSTALLED INCLUDE CEILING MOUNTED MIRRORS, AND SO FORTH.

3. THE CONTRACTOR SHALL PROVIDE TEMPORARY HALLWAY LIGHTING DURING

TIMES THAT WORK REQUIRES THAT THE HALLWAY LIGHTING ELECTRICAL

CIRCUIT HAS TO BE DEACTIVATED.

NEW WORK

1. CONTRACTOR SHALL INSTALL NEW CEILING GRID AT THE SAME ELEVATION AS

THE ORIGINAL GRID. THE NEW GRID SHALL BE ALIGNED SUCH THAT NEW LIGHT

FIXTURES RUN DOWN THE CENTER OF THE HALLWAYS, AS INDICATED ON THE

DRAWING. THE GRID SHALL BE SUPPORTED IN ACCORDANCE WITH SEISMIC

REQUIREMENTS LAID OUT IN THE SPECIFICATIONS.

2. INSTALL TYPE A RECESSED LED LIGHT TROFFERS IN THE LOCATIONS AND

QUANTITIES INDICATED. ALL LIGHTS SHALL BE INDEPENDENTLY SUPPORTED ON

ALL FOUR CORNERS AND ATTACHED TO THE CEILING GRID. REUSE EXISTING

LIGHTING CIRCUITS AND WHIPS. FOR FIXTURE CHARACTERISTICS SEE SHEET

A109

3. INSTALL EXIT SIGNS AS INDICATED. DIRECTIONAL CHEVRONS ON SIGN SHALL

MATCH ORIGINALS SIGNS. EXIT SIGNS SHALL BE INDEPENDENTLY SUPPORTED

AND ATTACHED TO THE CEILING GRID. REUSE EXISTING LIGHTING WIRING AND

WHIPS. FOR FIXTURE CHARACTERISTICS SEE SHEET A109

4. ADJUST EXISTING SPRINKLER HEADS TO NEW CEILING CONFIGURATION.

5. RESET / REINSTALL EXISTING CEILING MOUNTED DEVICES AND EQUIPMENT INTO

THE NEW CEILING, ADJUSTING AS NECESSARY TO MATCH THE NEW CEILING

LAYOUT.

6. REFER TO APPLICABLE SECTIONS OF THE SPECIFICATIONS FOR NEW PRODUCT

AND INSTALLATION REQUIREMENTS.

C:\Users\VHARICStileR\Desktop\force Package\sketches\CAD\1st fl.dwg, 3/12/2019 8:47:37 AM, _AutoCAD PDF (General Documentation).pc3

AutoCAD SHX Text

48" HIGH WALL

AutoCAD SHX Text

FC

AutoCAD SHX Text

FC

AutoCAD SHX Text

COVER

AutoCAD SHX Text

E.J. PLATE

AutoCAD SHX Text E.J.

AutoCAD SHX Text

CARE

AutoCAD SHX Text

COMMUNITY

AutoCAD SHX Text

CARE

AutoCAD SHX Text

COMMUNITY

AutoCAD SHX Text

FC

AutoCAD SHX Text

FEMALE LOCKERS (CANTEEN) 1M-116

AutoCAD SHX Text

FEMALE TOILET 1M-115

AutoCAD SHX Text

BLINDED VET ASSOC 1M-118

AutoCAD SHX Text

VOLUNTEER STORAGE 1M-117

AutoCAD SHX Text

PATIENT LAUNDRY 1M-122

AutoCAD SHX Text

PRESIDENT OFFICE 1M-121B

AutoCAD SHX Text

VICE PRESIDENT 1M-121A

AutoCAD SHX Text

EMS EQUIP STORAGE 1M-123

AutoCAD SHX Text

CHIEF STEWARD 1M-121C

AutoCAD SHX Text

DIETARY 1M-125

AutoCAD SHX Text

UNION OFFICE 1M-121

AutoCAD SHX Text

CORRIDOR C1M-4

AutoCAD SHX Text

COOK/CHILL 1M-124

AutoCAD SHX Text

STAIR 13

AutoCAD SHX Text

NURSING 1M-149

AutoCAD SHX Text

COPY RM 1M-150

AutoCAD SHX Text

MALE VISITORS TOILET 1M-148

AutoCAD SHX Text

CORRIDOR C1M-5

AutoCAD SHX Text

CLINICAL DIETICIAN 1M-146

AutoCAD SHX Text

SOCIAL WORK OFFICE 1M-145

AutoCAD SHX Text

CORRIDOR C1M-10

AutoCAD SHX Text

WARD PHYSICIAN 1M-144

AutoCAD SHX Text

MULTI-USE OFFICE 1M-143

AutoCAD SHX Text

CORRIDOR C1M-7

AutoCAD SHX Text

OFFICE 1M-147

AutoCAD SHX Text

OFFICE 1M-147A

AutoCAD SHX Text

DIRECTOR GERIATRICS FELLOWSHIP TRAINING PROGRAM 1M-134

AutoCAD SHX Text

DIETICIAN OFFICE 1M-126

AutoCAD SHX Text

SOCIAL WORKER 1M-126A

AutoCAD SHX Text

FEMALE PATIENT TIOLET 1M-127

AutoCAD SHX Text

ELECTRICAL CLOSET 1M-128

AutoCAD SHX Text

CORRIDOR C1M-6

AutoCAD SHX Text

STORAGE 1M-132

AutoCAD SHX Text

OFFICE 1M-133

AutoCAD SHX Text

STORAGE 1M-136

AutoCAD SHX Text

OFFICE 1M-137

AutoCAD SHX Text

KINISEOTHERAPY 1M-135

AutoCAD SHX Text

OCCUPATIONAL THERAPY 1M-131

AutoCAD SHX Text

RECREATION THERAPY 1M-130

AutoCAD SHX Text

DINING RM 1M-129

AutoCAD SHX Text

ELECTRICAL SVC BAY 1M-152

AutoCAD SHX Text

MECHANICAL SVC BAY-L 1M-151

AutoCAD SHX Text ? 1M-120

AutoCAD SHX Text

BEVERAGE STOCK RM 1M-154

AutoCAD SHX Text

CORRIDOR C1M-13

AutoCAD SHX Text

VENDING CLOSET ?

AutoCAD SHX Text

CANTEEN 1M-155

AutoCAD SHX Text

OFFICE 1M-156

AutoCAD SHX Text

DISH RM 1M-158

AutoCAD SHX Text

CANTEEN KITCHEN 1M-157

AutoCAD SHX Text

OFFICE 1M-119

AutoCAD SHX Text

MALE LOCKER 1M-114

AutoCAD SHX Text

MALE TOILET 1M-113

AutoCAD SHX Text

OFFICE 1M-141B

AutoCAD SHX Text

LOBBY C1M-11

AutoCAD SHX Text

PGMME ASST GERIATRICS EXTENDED CARE OFFICE 1M-141A

AutoCAD SHX Text

COMMUNITY LIVING CENTER ROS COORDINATOR 1M-141

AutoCAD SHX Text

ADMIN OFFICER 1M-139

AutoCAD SHX Text

BARBER SHOP 1M-142

AutoCAD SHX Text

SVC LINE CHIEF GERIATRICS EXTENDED CARE 1M-140

AutoCAD SHX Text

CORRIDOR C1M-8

AutoCAD SHX Text

FEMALE VISITORS TOILET 1M-138

AutoCAD SHX Text

VESTIBULE C1M-12

AutoCAD SHX Text

OFFICE 1N-101

AutoCAD SHX Text

OFFICE 1N-100

AutoCAD SHX Text

2 BED RM 1N-102

AutoCAD SHX Text

PATIENT TOILET 1N-103

AutoCAD SHX Text

2 BED RM 1N-106

AutoCAD SHX Text

PATIENT TOILET 1N-107

AutoCAD SHX Text

2 BED RM 1N-110

AutoCAD SHX Text

TOILET 1N-111

AutoCAD SHX Text

NURSE OFFICE 1N-177

AutoCAD SHX Text

LAUNDRY 1N-178

AutoCAD SHX Text

2 BED RM 1N-104

AutoCAD SHX Text

PATIENT TOILET 1N-105

AutoCAD SHX Text

CORRIDOR C1N-8

AutoCAD SHX Text

TOILET 1N-109

AutoCAD SHX Text

CORRIDOR C1P-2

AutoCAD SHX Text

CORRIDOR C1P-1

AutoCAD SHX Text

CORRIDOR C1P-9

AutoCAD SHX Text

COMM CARE MEDICINE SUPPORT OFFICE 1P-100

AutoCAD SHX Text

COMM CARE CO-ORDR OFFICE 1P-100A

AutoCAD SHX Text

OFFICE 1P-105

AutoCAD SHX Text

OFFICE 1P-105A

AutoCAD SHX Text

2 BED RM 1P-106

AutoCAD SHX Text

TOILET 1P-107

AutoCAD SHX Text

2 BED RM 1P-109

AutoCAD SHX Text

PATIENT TOILET 1P-110

AutoCAD SHX Text

2 BED RM 1P-112

AutoCAD SHX Text

TOILET 1P-113

AutoCAD SHX Text

PATIENT TOILET 1P-173

AutoCAD SHX Text

TOILET 1P-175

AutoCAD SHX Text

2 BED RM 1P-174

AutoCAD SHX Text

PATIENT TOILET 1P-178

AutoCAD SHX Text

2 BED RM 1P-177

AutoCAD SHX Text

TOILET 1P-180

AutoCAD SHX Text

2 BED RM 1P-179

AutoCAD SHX Text

STAFF TOILET 1P-182

AutoCAD SHX Text

LOUNGE 1P-181

AutoCAD SHX Text

COMM CONTRACT OFFICE 1P-183

AutoCAD SHX Text

HAC 1P-184

AutoCAD SHX Text

TOILET 1P-103

AutoCAD SHX Text

TOILET 1P-101

AutoCAD SHX Text

FEMALE LOCKERS 1P-102

AutoCAD SHX Text

HAC 1P-104

AutoCAD SHX Text

CONFERENCE RM 1P-108

AutoCAD SHX Text

EXAM RM 1P-111

AutoCAD SHX Text

NURSE MANAGER 1P-176

AutoCAD SHX Text

PATIENT TOILET 1P-117

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A109

MISCELLANEOUS DETAILS AND

SCHEDULES

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

RENOVATE VARIOUS HALLS AND

WALLS

RICHMOND VAMC

652-19-102

Project Director

04 MARCH 2019Revisions: Date:

HIGH EFFICIENCY INTEGRAL DRIVER. DRIVER AND LEDS EASILY ACCESSIBLE FROM BELOW.

SOFT OPAL DIFFUSERS

HOUSING SHALL BE 20 GAUGE STEEL WITH WHITE POLYESTER POWDER COAT FINISH

LUMINAIRE REQUIREMENTS

1.

2.

3.

2 x 2 RECESSED LED TROFFER

23.7"

35OOK COLOR TEMPERATURE LEDS WITH A MINIMUM CRI OF 80. 4.

UL LISTED FOR DAMP LOCATION AND TESTED IN ACCORDANCE WITH IESNA LM-79 AND LM-80

STANDARDS.

5.

23.7"

ALUMINUM HOUSING WITH HIGH-POLISH,

INJECTION-MOLDED VIRGIN ACRYLIC EDGE-LIT

PANEL. GRADUATED DEPTH OF MOLDED

LETTERS PROVIDES UNIFORM LIGHT

DISTRIBUTION ON GRAPHICS.

1.

EDGE-LIT EXIT LIGHT

7.

5.

6.

3.

4.

2. 6 INCH TALL LETTERS.

GREEN ILLUMINATION PROVIDED BY LIGHT

EMITTING DIODES (LED).

POWER FAILURE PROTECTION, BROWN OUT

PROTECTION AND SURGE PROTECTION.

DIRECTIONAL ARROWS AS INDICATED.

INDICATES CEILING MOUNT

INDICATES WALL MOUNT 6" ABOVE DOOR TO BOTTOM OF FIXTURE

14"

7-1/2"

LUMINAIRE REQUIREMENTS

UNIVERSAL MOUNTING.

BRUSHED ALUMINUM AND CLEAR ACRYLIC

FINISH.

LIGHTING FIXTURE SCHEDULE

SYMBOL DESCRIPTION

FIXTURE WATTAGE/

LUMEN OUTPUT

VOLTAGE MOUNTING NOTES

2x2 RECESSED

LED TROFFER

32W / 3200 LUMEN 120 / 277 RECESSED CEILING

CREE MODEL ZR22MT SERIES OR FUNCTIONAL

EQUIVALENT

EXIT SIGN LED 120 / 277 SURFACE CEILING

EMERGI-LITE MODEL PAG6 OR

FUNCTIONAL EQUIVALENT

FINISH SCHEDULE

USE SYMBOL MANUFACTURER SERIES / PATTERN NUMBER COLOR REMARKS

SCHEME A (HALLS AND WALLS)

ACOUSTIC CEILING AT-1 ARMSTRONG MESA 686 WHITE

2x2 TEGULAR, 15/16" THICK, 15/16" WHITE CEILING GRID

SOLID VINYL TILE SVT-1 AMTICO WOOD COLLECTION N/A

CUSTOM COLOR TO MATCH MANNINGTON

NATURE'S PATH COLOR # 12105, HERITAGE

CHERRY / NATURAL

3" x 36" (MAIN FLOORING)

PAINT P-1 SHERWIN WILLIAMS SW6141 SOFTER TAN

FIELD PAINT (WALL ABOVE HANDRAIL)

PAINT P-2 SHERWIN WILLIAMS SW6125 CRAFT PAPER

FIELD PAINT (WALL BELOW HANDRAIL)

PAINT P-3 SHERWIN WILLIAMS SW6107 NOMADIC DESERT DOOR TRIM PAINT AND METAL DOORS

WALL BASE RB-1 JOHNSONITE MW-XX-J 167 FUDGE WALL BASE

TRANSITION STRIP RB-2 JOHNSONITE SSR-XX-B 49 BEIGE TRANSITION STRIP

WALL PROTECTION -

HAND RAIL/CRASH RAIL

HR-1 C/S GROUP ACROVYN HRB-10CN 102 DESERT SAND

HAND RAIL, ACCENT REVEAL AND 6" UPPER CRASH RAIL

WALL PROTECTION -

LOWER CRASH RAIL

CR-1 C/S GROUP ACROVYN SCR-48N 102 DESERT SAND 6" CRASH RAIL INSTALLED 2" ABOVE WALL BASE

WALL PROTECTION CG-1 C/S GROUP ACROVYN SM-20n 997 ICE CREAM

4' HEIGHT, 3" WINGS, 1/4" RADIUS

SCHEME B (GOING FORWARD)

ACOUSTIC CEILING AT-1 ARMSTRONG MESA 686 WHITE

2x2 TEGULAR, 15/16" THICK, 15/16" WHITE CEILING GRID

SHEET FLOORING WSF-1 MANNINGTON REALITIES II TBD TBD 12' WIDTHS. COLOR AND NUMBER TO BE SELECTED BY THE VA

SHEET FLOORING WSF-2 MANNINGTON REALITIES II TBD TBD 12' WIDTHS. COLOR AND NUMBER TO BE SELECTED BY THE VA

PAINT P-1 SHERWIN WILLIAMS SW6106 KILIM BEIGE WALL FIELD PAINT

PAINT P-2 SHERWIN WILLIAMS SW6107 NOMADIC DESERT DOOR TRIM PAINT AND METAL DOORS

WALL BASE RB-1 ROPPE

PINNACLE PLUS PROFILE

#90

632 FLAX CORRIDOR WALL BASE

TRANSITION STRIP RB-2 JOHNSONITE SSR-XX-B 49 BEIGE TRANSITION STRIP

WALL PROTECTION -

HAND RAIL/CRASH RAIL

HR-1 C/S GROUP ACROVYN HRB-10CN 372 CLASSIC MAPLE TOP HAND RAIL

997 IRISH CREAM ACCENT REVEAL

704 BRAZILIAN NUT 6" UPPER CRASH RAIL

WALL PROTECTION -

LOWER CRASH RAIL

CR-1 C/S GROUP ACROVYN SCR-48N 704 BRAZILIAN NUT

LOWER CRASH RAIL (6" WIDE) INSTALLED 2" ABOVE WALL BASE

CORNER GUARD CG-1 C/S GROUP ACROVYN SM-20N 997 IRISH CREAM

4' HEIGHT, 3" WINGS, 1/4" RADIUS

SCHEME C (HYBRID)

ACOUSTIC CEILING AT-1 ARMSTRONG MESA 686 WHITE

2x2 TEGULAR, 15/16" THICK, 15/16" WHITE CEILING GRID

SOLID VINYL TILE SVT-1 AMTICO WOOD COLLECTION N/A

CUSTOM COLOR TO MATCH MANNINGTON

NATURE'S PATH, COLOR #12105, HERITAGE

CHERRY / NATURAL

3"x36" TILE

PAINT P-1 SHERWIN WILLIAMS SW6106 KILIM BEIGE WALL FIELD PAINT

PAINT P-2 SHERWIN WILLIAMS SW6107 NOMADIC DESERT DOOR TRIM PAINT AND METAL DOORS

WALL BASE RB-1 ROPPE

PINNACLE PLUS PROFILE

#90

632 FLAX CORRIDOR WALL BASE

TRANSITION STRIP RB-2 JOHNSONITE SSR-XX-B 49 BEIGE TRANSITION STRIP

WALL PROTECTION -

HAND RAIL/CRASH RAIL

HR-1 C/S GROUP ACROVYN HRB-10CN 372 CLASSIC MAPLE TOP HAND RAIL

997 IRISH CREAM ACCENT REVEAL

704 BRAZILIAN NUT 6" UPPER CRASH RAIL

WALL PROTECTION -

LOWER CRASH RAIL

CR-1 C/S GROUP ACROVYN SCR-48N 704 BRAZILIAN NUT

LOWER CRASH RAIL (6" WIDE) INSTALLED 2" ABOVE WALL BASE

CORNER GUARD CG-1 C/S GROUP ACROVYN SM-20N 997 IRISH CREAM

4' HEIGHT, 3" WINGS, 1/4" RADIUS

ALL VINYL OR RUBBER BASE SHALL BE IN 8'-0" LENGTHS

DIRECTION OF FLOORING SHALL BE NOTED ON DRAWINGS AND MATCH WITH EXISTING

PAINT SHEEN: DOOR FRAMES, METAL DOORS AND CORRIDOR WALLS SHALL BE SEMI-GLOSS

CRASH RAIL SHALL BE INSTALLED 2" ABOVE VINYL WALL BASE.

ALL CEILING TILE GRID SHALL BE 15/16"

WSF-2 ON CROSS

COORIDORS

WSF-1

(2/3rd WIDTH)

WSF-2

(1/3rd WIDTH)

N.T.S.

WELD SHEET FLOORING DETAIL

C:\Users\VHARICStileR\Desktop\force Package\sketches\CAD\1st fl.dwg, 3/12/2019 8:47:41 AM, _AutoCAD PDF (General Documentation).pc3 http://www.gothamlighting.com/products/ProductLine.asp?brand=GAL&family=AFV&producttype=Downlighting&category=Compact%20Fluorescent&subcategory=Downlight AutoCAD SHX Text A http://www.lithonia.com/products/family2.asp?Brand=LL&family=LRP&ProductType=Emergency%20Lighting&Category=Exit%20Signs&SubCategory=Precise%20Edge-Lit%20Exit%20Signs http://www.lithonia.com/products/family2.asp?Brand=LL&family=LRP&ProductType=Emergency%20Lighting&Category=Exit%20Signs&SubCategory=Precise%20Edge-Lit%20Exit%20Signs AutoCAD SHX Text A

EEG 2C-113

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A101

PHASING PLAN - SECOND FLOOR

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

652-19-102

Project Director

1 March 2019Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A102

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

RENOVATE VARIOUS HALLS AND

WALLS

Richmond VAMC

Project Director

Revisions: Date:

Scale: 1/16" = 1'

PLAN VIEW - 2F AND 2E AREAS

Scale: 1/16" = 1'

PLAN VIEW - 2C AREA

Scale: 1/16" = 1'

PLAN VIEW - 2H AREA

PHASE 2C-1

P H

A S

E

C

P H

A S

E

C

P H

A S

E

C

P H

A S

E

C

P H

A S

E

F

P H

A S

E

F

P H

A S

E

F

P H

A S

E

F

P H

A S

E

F

PHASE 2E-2

PHASE 2E-1

PHASE 2E-3 PHASE 2E-4

PHASE 2H-1

LEGEND

PHASING AREA BOUNDARIES

AREA 2H AND 2C PHASING NOTES

1. THE CONTRACTOR SHALL DEVELOP AND SUBMIT FOR APPROVAL A

PHASING PLAN INDICATING HOW THE WORK WILL BE ACCOMPLISHED

WITHOUT IMPACTING PATIENT CARE. THE PHASES ARE INDICATED ON

THE DRAWING. THE CONTRACTOR SHALL EXECUTE THE PHASES IN

SEQUENTIAL ORDER INDICATED. PHASES MAY ONLY BE COMBINED AT

THE APPROVAL OF THE VA.

2. THE CONTRACTOR SHALL MEET WITH AFFECTED VA PERSONNEL IN THE

AREA TO BRIEF THE PERSONNEL ON THE PHASING PLAN AND TO ANSWER

QUESTIONS RELATED TO THE WORK. THE MEETING WILL BE SCHEDULED

A MINIMUM OF 2 WEEKS PRIOR TO START OF WORK IN THE AREA. THE

CONTRACTOR SHALL COLLECT AND MAINTAIN VA POINTS OF CONTACT

FOR AFFECTED PERSONNEL IN THE AREA, TO INCLUDE BUT NOT LIMITED

TO SERVICE CHIEFS AND NURSE MANAGERS.

3. PHASES IN THIS AREA WILL BE WORKED ON DURING NON-BUSINESS HOUR

(7:00PM TO 5:00 AM) SHIFTS.

4. ICRA BARRIERS ARE TO BE ERECTED AT THE BEGINNING OF EACH SHIFT

AND NEGATIVE PRESSURE ESTABLISHED. IN THE EVENT OF AN

EMERGENCY, BARRIERS SHALL BE CAPABLE OF BEING QUICKLY REMOVED

BY VA PERSONNEL. SIGNAGE SHALL BE PLACED ON THE BARRIERS

PROVIDING INSTRUCTIONS ON HOW TO REMOVE THE BARRIERS QUICKLY

TO PROVIDE EGRESS.

5. DETOUR SIGNAGE SHALL BE ERECTED AS NECESSARY.

6. THE ACTIVE CONSTRUCTION AREAS SHALL BE CLEANED EACH MORNING

TO PREVENT TRACKING OF DUST AND SHALL BE SECURED IN A MANNER

TO ALLOW FOOT TRAFFIC TO PASS THROUGH THE INACTIVE

CONSTRUCTION ZONE DURING THE DAY. BARE CONCRETE SHALL HAVE A

PATH COVERED WITH FLOOR PROTECTION BOARD (RAM BOARD) WITH

SEAMS AND EDGES TAPED TO PREVENT MOVEMENT. PATH SHALL BE

DELINEATED WITH PEDESTRIAN CONTROL BARRIERS (REMOVABLE TAPE

TYPE WITH POSTS) TO GUIDE PEDESTRIANS ON THE PATH THROUGH THE

CONSTRUCTION ZONE. WHILE CEILING IS NOT IN PLACE, A TEMPORARY

CEILING (OR COVERS) SHALL BE ERECTED OVER THE PATH HAVING A

MINIMUM OF 7' CLEARANCE.

7. IN A GIVEN PHASE, DEMOLITION OF THE FLOORING (WHICH HAS MASTIC

CONTAINING ASBESTOS) MUST BE ABATED IN A SINGLE NIGHT SHIFT. NO

EXPOSED ASBESTOS OR WASTE SHALL BE LEFT ON THE SITE AFTER THE

FIRST NIGHT SHIFT.

8. REFER TO NEW WORK FLOOR PLANS AND REFLECTED CEILING PLANS FOR

SPECIFICS ON CONDUCTING WORK.

AREA 2F AND 2E PHASING NOTES

1. THE CONTRACTOR SHALL WORK BOTH AREAS CONCURRENTLY.

2. THE CONTRACTOR SHALL DEVELOP AND SUBMIT FOR APPROVAL A PHASING PLAN WITH

SCHEDULE FOR EACH AREA OF WORK INDICATING HOW THE WORK WILL BE ACCOMPLISHED

WITHOUT IMPACTING PATIENT CARE. THE PHASING PLAN SHALL LAYOUT THE INSTALLATION

OF ICRA BARRIERS FOR EACH OF THE PHASES. THE PHASES ARE INDICATED ON THE

DRAWING. THE CONTRACTOR SHALL EXECUTE THE PHASES IN SEQUENTIAL ORDER

INDICATED. PHASES MAY ONLY BE COMBINED AT THE APPROVAL OF THE VA.

3. IN PREPARING THE PHASING PLAN, THE CONTRACTOR SHALL WALK EACH OF THE

PHASES WITH THE COR AND OTHER VA PERSONNEL TO IDENTIFY POTENTIAL

QUESTIONS/ISSUES AND DOCUMENT SOLUTIONS TO THOSE QUESTIONS/ISSUES ON THE

PHASING PLAN.

4. THE CONTRACTOR SHALL MEET WITH AFFECTED VA PERSONNEL IN THE AREA, AND THE

COR, TO BRIEF THE PERSONNEL ON THE PHASING PLAN AND CONSTRUCTION SCHEDULE AND

TO ANSWER QUESTIONS RELATED TO THE WORK. THE MEETING WILL BE SCHEDULED A

MINIMUM OF 2 WEEKS PRIOR TO START OF WORK IN THE AREA. THE CONTRACTOR SHALL

COLLECT AND MAINTAIN VA POINTS OF CONTACT FOR AFFECTED PERSONNEL IN THE AREA,

TO INCLUDE BUT NOT LIMITED TO SERVICE CHIEFS AND NURSE MANAGERS.

5. EACH PHASE IN THESE AREAS WILL BE TURNED OVER TO THE CONTRACTOR TO

PERFORM WORK CONTINUOUSLY UNTIL ALL WORK IN THE PHASE IS COMPLETE. THE

CONTRACTOR WILL HAVE SEVEN (7) CALENDAR DAYS TO COMPLETE ALL WORK IN THE

PHASE. WORK MAY BE CONDUCTED 24 HOURS PER DAY. NOISE GENERATING ACTIVITIES

SHALL BE CONDUCTED FROM 7:00AM TO 9:00PM EACH DAY. QUIET CONSTRUCTION

ACTIVITIES CAN BE CONDUCTED OVER NIGHT FROM 9:00PM TO 7:00AM. PLAYING OF MUSIC IN

THE CONSTRUCTION ZONE IS EXPRESSLY FORBIDDEN.

6. ICRA BARRIERS ARE TO BE ERECTED FIRST AND NEGATIVE PRESSURE ESTABLISHED.

IN THE EVENT OF AN EMERGENCY, BARRIERS SHALL BE CAPABLE OF BEING QUICKLY

REMOVED BY VA PERSONNEL. SIGNAGE SHALL BE PLACED ON THE BARRIERS PROVIDING

INSTRUCTIONS ON HOW TO REMOVE THE BARRIERS QUICKLY TO PROVIDE EGRESS.

4. UPON COMPLETION OF A PHASE, THE CONTRACTOR WILL ALLOW MINIMUM OF 7 DAYS

FOR THE VA TO TURN OVER THE NEXT PHASE FOR WORK.

5. REFER TO NEW WORK FLOOR PLANS AND REFLECTED CEILING PLANS FOR SPECIFICS

OF CONDUCTING WORK.

AutoCAD SHX Text

FC

AutoCAD SHX Text

FC

AutoCAD SHX Text

FC

AutoCAD SHX Text

FC

AutoCAD SHX Text

FC

AutoCAD SHX Text

FC

AutoCAD SHX Text

FC

AutoCAD SHX Text

FC

AutoCAD SHX Text

KITCHEN 2E-141

AutoCAD SHX Text

HAC 2E-139

AutoCAD SHX Text

PATIENT TOILET 2E-133

AutoCAD SHX Text

2 BED RM 2E-132

AutoCAD SHX Text

2 BED RM 2E-130

AutoCAD SHX Text

PATIENT TOILET 2E-131

AutoCAD SHX Text

PATIENT TOILET 2E-135

AutoCAD SHX Text

4 BED RM 2E-134

AutoCAD SHX Text

PATIENT TOILET 2E-137

AutoCAD SHX Text

SHOWER 2E-138

AutoCAD SHX Text

PATIENT TOILET 2E-143

AutoCAD SHX Text

1 BED RM 2E-136

AutoCAD SHX Text

WORK RM 2E-142

AutoCAD SHX Text

WORK RM 2E-144

AutoCAD SHX Text

TOILET 2E-147

AutoCAD SHX Text

TOILET 2E-145

AutoCAD SHX Text

WORK RM 2E-146

AutoCAD SHX Text

WORK RM 2E-151

AutoCAD SHX Text

TOILET 2E-152

AutoCAD SHX Text

TOILET 2E-154

AutoCAD SHX Text

WORK RM 2E-153

AutoCAD SHX Text

SHOWER 2E-155

AutoCAD SHX Text

WORK RM 2E-156

AutoCAD SHX Text

TOILET 2E-157

AutoCAD SHX Text

CONFERENCE RM 2E-163

AutoCAD SHX Text

VISITORS C2E-1

AutoCAD SHX Text

EQUIP STORAGE 2E-164

AutoCAD SHX Text

4 BED RM 2E-128

AutoCAD SHX Text

PATIENT TOILET 2E-129

AutoCAD SHX Text

STORAGE 2E-127

AutoCAD SHX Text

STAIR 2

AutoCAD SHX Text

OFFICE 2E-120

AutoCAD SHX Text

FEMALE TOILET 2E-192

AutoCAD SHX Text

MALE LOCKER 2E-102

AutoCAD SHX Text

MALE TOILET 2E-103

AutoCAD SHX Text

CONFERENCE RM 2E-101

AutoCAD SHX Text

STORAGE 2E-106

AutoCAD SHX Text

EXAM RM 2E-107

AutoCAD SHX Text

STORAGE 2E-108

AutoCAD SHX Text

STAFF LOUNGE 2E-111

AutoCAD SHX Text

CLEAN UTILITY 2E-116

AutoCAD SHX Text

SOILED UTILITY 2E-115

AutoCAD SHX Text

PATIENT TOILET 2E-149

AutoCAD SHX Text

NURSE TOILET 2E-148

AutoCAD SHX Text

NURSE STATION C2E-5

AutoCAD SHX Text

HEAD NURSE 2E-123

AutoCAD SHX Text

ELEC CLOSET 2E-122

AutoCAD SHX Text

MEDICATION 2E-140

AutoCAD SHX Text

CONGREGATE BATH 2E-150

AutoCAD SHX Text

NURSE MGR 2E-158

AutoCAD SHX Text

SOCIAL WORKER TRAINEE 2E-159

AutoCAD SHX Text

PSYCHICAL 2E-160

AutoCAD SHX Text

PSYCHICAL 2E-161

AutoCAD SHX Text

NURSE INSTRUCTOR 2E-162

AutoCAD SHX Text

NURSING COORD. CUBICLES 2E-100

AutoCAD SHX Text

CORRIDOR C2E-2

AutoCAD SHX Text

CORRIDOR C2E-4

AutoCAD SHX Text

CORRIDOR C2E-6

AutoCAD SHX Text

CORRIDOR C2E-7

AutoCAD SHX Text

CORRIDOR C2E-8

AutoCAD SHX Text

CORRIDOR C2F-2

AutoCAD SHX Text

CONFERENCE RM 2A-100

AutoCAD SHX Text

CORRIDOR C2A-26

AutoCAD SHX Text

CORRIDOR C2A-29

AutoCAD SHX Text

RECOVERY AREA 2A-197

AutoCAD SHX Text

NURSES STATION C2A-28

AutoCAD SHX Text

ANTE RM 2A-200

AutoCAD SHX Text

ISOLATION RM 2A-201

AutoCAD SHX Text

CORRIDOR C2A-30

AutoCAD SHX Text

ISOLATION RM 2A-202

AutoCAD SHX Text

ANTE RM 2A-203

AutoCAD SHX Text

RECOVERY AREA 2A-199

AutoCAD SHX Text

CORRIDOR C2A-27

AutoCAD SHX Text

HAC 2A-204

AutoCAD SHX Text

NURSE OFFICE 2A-198

AutoCAD SHX Text

MEDIC 2A-205

AutoCAD SHX Text

STAIR 6

AutoCAD SHX Text

CLEAN UTILITY 2A-206

AutoCAD SHX Text

SOILED UTILITY 2A-209

AutoCAD SHX Text

TOILET 2A-210

AutoCAD SHX Text

CORRIDOR C2A-31

AutoCAD SHX Text

ANTE RM 2A-212

AutoCAD SHX Text

LOUNGE 2A-211

AutoCAD SHX Text

STAIR 7

AutoCAD SHX Text

STORAGE 2A-215

AutoCAD SHX Text

CORRIDOR C2A-32

AutoCAD SHX Text

HAC 2A-214

AutoCAD SHX Text

HOUSE KEEPING STORAGE 2A-213

AutoCAD SHX Text

MECHANICAL SERVICE BAY-A 2A-208

AutoCAD SHX Text

ELEC SVC BAY 2A-207

AutoCAD SHX Text

ELEC SVC BAY 2F-186

AutoCAD SHX Text

MECHANICAL SERVICE BAY-B 2F-185

AutoCAD SHX Text

STRETCHER STORAGE C2G-2

AutoCAD SHX Text

CORRIDOR C2G-1

AutoCAD SHX Text

ANTE RM 2G-112

AutoCAD SHX Text

ISOLATION BED RM 2G-110

AutoCAD SHX Text

TOILET 2G-111

AutoCAD SHX Text

CONTROL CENTER C2G-5

AutoCAD SHX Text

1 BED RM 2G-115

AutoCAD SHX Text

1 BED RM 2G-114

AutoCAD SHX Text

CLEAN LINEN 2G-113

AutoCAD SHX Text

SOILED UTILITY 2G-113A

AutoCAD SHX Text

LINEN PHYSICIAN C2G-3

AutoCAD SHX Text

CORRIDOR C2F-1

AutoCAD SHX Text

PHYSICIAN OFFICE 2F-183

AutoCAD SHX Text

PHYSICIAN 2F-182

AutoCAD SHX Text

PHYSICIAN 2F-184

AutoCAD SHX Text

CORRIDOR C2F-12

AutoCAD SHX Text

PHYSICIAN 2F-178

AutoCAD SHX Text

STORAGE 2F-179

AutoCAD SHX Text

PHYSICIAN 2F-175

AutoCAD SHX Text

OFFICE 2F-176

AutoCAD SHX Text

CORRIDOR C2F-10

AutoCAD SHX Text

CORRIDOR C2F-11

AutoCAD SHX Text

PHYSICIAN 2F-181

AutoCAD SHX Text

CASE MANAGER 2F-103

AutoCAD SHX Text

SOCIAL WORKER 2F-104

AutoCAD SHX Text

PHYSICIAN 2F-180

AutoCAD SHX Text

WAITING RM 2F-105

AutoCAD SHX Text

PHYSICIAN 2F-177

AutoCAD SHX Text

PRIVATE MEETING RM 2F-109

AutoCAD SHX Text

PHYSICIAN 2F-174

AutoCAD SHX Text

HEAD NURSE 2F-112

AutoCAD SHX Text

NURSE 2F-171

AutoCAD SHX Text

SOILED UTILITY 2F-169

AutoCAD SHX Text

CLEAN UTILITY 2F-113

AutoCAD SHX Text

KITCHEN 2F-114

AutoCAD SHX Text

4 BED RM 2F-110

AutoCAD SHX Text

TOILET 2F-111

AutoCAD SHX Text

TOILET 2F-108

AutoCAD SHX Text

4 BED RM 2F-107

AutoCAD SHX Text

CLEAN LINEN 2F-106

AutoCAD SHX Text

TOILET 2F-102

AutoCAD SHX Text

4 BED RM 2F-101

AutoCAD SHX Text

PHYSICAL THERAPY 2F-100

AutoCAD SHX Text

STORAGE 2F-173

AutoCAD SHX Text

PHYSICIAN 2F-172

AutoCAD SHX Text

SURGICAL OFFICE 2F-170

AutoCAD SHX Text

1 BED RM 2F-115

AutoCAD SHX Text

TOILET 2F-116

AutoCAD SHX Text

SHOWER 2F-117

AutoCAD SHX Text

TOILET 2F-119

AutoCAD SHX Text

1 BED RM 2F-118

AutoCAD SHX Text

EQUIPMENT RM 2F-120

AutoCAD SHX Text

TOILET 2F-121

AutoCAD SHX Text

1 BED RM 2F-126

AutoCAD SHX Text

TOILET 2F-127

AutoCAD SHX Text

2 BED RM 2F-128

AutoCAD SHX Text

TOILET 2F-129

AutoCAD SHX Text

STAIR 1

AutoCAD SHX Text

4 BED RM 2F-131

AutoCAD SHX Text

TOILET 2F-132

AutoCAD SHX Text

STORAGE 2F-133

AutoCAD SHX Text

CORRIDOR C2F-5

AutoCAD SHX Text

CORRIDOR C2F-6

AutoCAD SHX Text

2 BED RM 2F-134

AutoCAD SHX Text

TOILET 2F-135

AutoCAD SHX Text

CORRIDOR C2F-7

AutoCAD SHX Text

1 BED RM 2F-136

AutoCAD SHX Text

TOILET 2F-137

AutoCAD SHX Text

CORRIDOR C2F-8

AutoCAD SHX Text

4 BED RM 2F-139

AutoCAD SHX Text

TOILET 2F-140

AutoCAD SHX Text

STORAGE 2F-138

AutoCAD SHX Text

SHOWER 2F-143

AutoCAD SHX Text

TOILET 2F-142

AutoCAD SHX Text

1 BED RM 2F-141

AutoCAD SHX Text

ANTE RM 2F-144

AutoCAD SHX Text

1 BED RM 2F-146

AutoCAD SHX Text

TOILET 2F-147

AutoCAD SHX Text

SHOWER 2F-148

AutoCAD SHX Text

ANTE RM 2F-149

AutoCAD SHX Text

CORRIDOR C2F-9

AutoCAD SHX Text

1 BED RM 2F-151

AutoCAD SHX Text

TOILET 2F-152

AutoCAD SHX Text

SHOWER 2F-153

AutoCAD SHX Text

ANTE RM 2F-154

AutoCAD SHX Text

1 BED RM 2F-157

AutoCAD SHX Text

TOILET 2F-158

AutoCAD SHX Text

SHOWER 2F-159

AutoCAD SHX Text

ANTE RM 2F-160

AutoCAD SHX Text

1 BED RM 2F-161

AutoCAD SHX Text

TOILET 2F-162

AutoCAD SHX Text

SHOWER 2F-163

AutoCAD SHX Text

ANTE RM 2F-164

AutoCAD SHX Text

1 BED RM 2F-165

AutoCAD SHX Text

TOILET 2F-166

AutoCAD SHX Text

ANTE RM 2F-168

AutoCAD SHX Text ? C2F-3

AutoCAD SHX Text

NURSES STATION & CLERK C2F-4

AutoCAD SHX Text

TOILET 2F-122

AutoCAD SHX Text

MED 2F-156

AutoCAD SHX Text

HAC 2F-155

AutoCAD SHX Text

PATIENT TOILET 2F-124

AutoCAD SHX Text

CONGREGATE BATH 2F-123

AutoCAD SHX Text

CASE MANAGER OFFICE 2F-150

AutoCAD SHX Text

ELECTRICAL CLOSET 2F-125

AutoCAD SHX Text

CLEAN UTILITY 2F-130

AutoCAD SHX Text

2 RESIDENTS 2F-145

AutoCAD SHX Text

TOILET 2E-125

AutoCAD SHX Text

PACU 2E-124

AutoCAD SHX Text

STORAGE 2E-121

AutoCAD SHX Text

(DOOR) 2E-114

AutoCAD SHX Text

FC

AutoCAD SHX Text

PATIENT TOILET 2A-109

AutoCAD SHX Text

WAITING C2A-5

AutoCAD SHX Text

NURSE 2A-108

AutoCAD SHX Text

CORRIDOR C2B-6

AutoCAD SHX Text

CORRIDOR C2H-8

AutoCAD SHX Text

ANESTH RESIDENTS 2A-107

AutoCAD SHX Text

SECRETARY/WAITING CLERK 2A-106

AutoCAD SHX Text

CORRIDOR C2A-3

AutoCAD SHX Text

CHIEF ANESTH 2A-104

AutoCAD SHX Text

CORRIDOR C2A-4

AutoCAD SHX Text

CONFERENCE RM 2A-100

AutoCAD SHX Text

STAIR 7

AutoCAD SHX Text

STORAGE 2A-215

AutoCAD SHX Text

ELEVATOR LOBBY C2A-2

AutoCAD SHX Text

ELEV P1

AutoCAD SHX Text

ELEV P3

AutoCAD SHX Text

ELEV P2

AutoCAD SHX Text

CONVEYOR RECEIVING 2A-219

AutoCAD SHX Text

CONVEYOR 2A-220

AutoCAD SHX Text

TSC-2

AutoCAD SHX Text

ELEV DT-1

AutoCAD SHX Text

ELEV P-4

AutoCAD SHX Text

BIOMED 2A-219A

AutoCAD SHX Text

HEMO DIALYSIS SUPPLY 2A-221

AutoCAD SHX Text

CORRIDOR C2H-1

AutoCAD SHX Text

MALE TOILET 2G-134

AutoCAD SHX Text

FEMALE TOILET 2G-135

AutoCAD SHX Text

HAC 2G-133

AutoCAD SHX Text

FAMILY WAITING 2G-132

AutoCAD SHX Text

CORRIDOR CTG-12

AutoCAD SHX Text

CORRIDOR C2A-1

AutoCAD SHX Text

ELEC SVC BAY 2A-218

AutoCAD SHX Text

ELEC SVC BAY 2G-101

AutoCAD SHX Text

NURSE MANAGER 2G-131

AutoCAD SHX Text

CORRIDOR C2G-11

AutoCAD SHX Text

ON CALL RM 2G-130

AutoCAD SHX Text

TOILET 2G-128

AutoCAD SHX Text

SHOWER 2G-129

AutoCAD SHX Text

MECHANICAL SERVICE BAY-F 2G-100

AutoCAD SHX Text

MECHANICAL SERVICE BAY-G 2A-217

AutoCAD SHX Text

UNISEX TOILET 2G-127

AutoCAD SHX Text

CORRIDOR C2H-7

AutoCAD SHX Text

ANTE RM 2H-108

AutoCAD SHX Text

PATIENT TOILET 2H-104

AutoCAD SHX Text

WAITING 2H-103

AutoCAD SHX Text

SHOWER 2H-105

AutoCAD SHX Text

SHOWER 2H-106

AutoCAD SHX Text

OFFICE 2H-140

AutoCAD SHX Text

PHARMACY SATELLITE 2H-141

AutoCAD SHX Text

EXAM RM 2H-139

AutoCAD SHX Text

FELLOWS 2H-138

AutoCAD SHX Text

EXAM 2H-140A

AutoCAD SHX Text

STORAGE 2H-137

AutoCAD SHX Text

NURSE MANAGER 2H-136

AutoCAD SHX Text

KITCHEN 2H-107

AutoCAD SHX Text R

AutoCAD SHX Text

WAITING 2H-207

AutoCAD SHX Text

SECRETARY 2H-208

AutoCAD SHX Text

NOURISHMENT 2H-209

AutoCAD SHX Text

TOILET 2H-203

AutoCAD SHX Text

SOCIAL WORKER 2H-202

AutoCAD SHX Text

ELECTRIC 2H-200

AutoCAD SHX Text

WHEEL CHAIR ALCOVE 2H-201

AutoCAD SHX Text

TOILET 2H-260

AutoCAD SHX Text

TOILET 2H-261

AutoCAD SHX Text

CORRIDOR C2H-1

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C2C-6

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C2B-9

AutoCAD SHX Text

AHU 2D-120

AutoCAD SHX Text

KINISEOTHERAPY 2D-100

AutoCAD SHX Text

PHYSICIAN 2C-156

AutoCAD SHX Text

STAFF TOILET 2C-157

AutoCAD SHX Text

STAFF TOILET 2C-154

AutoCAD SHX Text

EMP HEALTH OFFICE 2C-153

AutoCAD SHX Text

PHYSICIAN 2C-151

AutoCAD SHX Text

STAFF TOILET 2C-147

AutoCAD SHX Text

ANTE RM 2C-155

AutoCAD SHX Text

TOILET 2C-152

AutoCAD SHX Text

NURSE COMP & PENSION 2C-146

AutoCAD SHX Text

PHYSICIAN 2C-143

AutoCAD SHX Text

PATIENT TOILET 2C-141

AutoCAD SHX Text

PATIENT TOILET 2C-144

AutoCAD SHX Text

PHYSICIAN 2C-140

AutoCAD SHX Text

SHOWER 2C-142

AutoCAD SHX Text

EXAM RM 2C-138

AutoCAD SHX Text

PATIENT TOILET 2C-139

AutoCAD SHX Text

TOILET 2C-137

AutoCAD SHX Text

PHYSICIAN 2C-136

AutoCAD SHX Text

OFFICE 2C-134

AutoCAD SHX Text

STAFF TOILET 2C-135

AutoCAD SHX Text

OFFICE 2C-132

AutoCAD SHX Text

STAFF TOILET 2C-133

AutoCAD SHX Text

STAFF TOILET 2C-131

AutoCAD SHX Text

OFFICE 2C-130

AutoCAD SHX Text

STAIR 4

AutoCAD SHX Text

OFFICE 2C-126

AutoCAD SHX Text

STAFF TOILET 2C-127

AutoCAD SHX Text

STAFF TOILET 2C-125

AutoCAD SHX Text

OFFICE 2C-124

AutoCAD SHX Text

TOILET 2C-121

AutoCAD SHX Text

OFFICE 2C-119

AutoCAD SHX Text

SHOWER 2C-120

AutoCAD SHX Text

CONFERENCE RM 2C-115B

AutoCAD SHX Text

STAFF TOILET 2C-116

AutoCAD SHX Text

OFFICE 2C-115A

AutoCAD SHX Text

OFFICE 2C-115

AutoCAD SHX Text

NURSE TOILET 2C-118

AutoCAD SHX Text

MED 2C-117

AutoCAD SHX Text

NURSES STATION & CLERK C2C-4

AutoCAD SHX Text

PATIENT TOILET 2C-150

AutoCAD SHX Text

STORAGE 2C-149

AutoCAD SHX Text

KITCHEN 2C-122

AutoCAD SHX Text

STORAGE 2C-123

AutoCAD SHX Text

STORAGE 2C-128

AutoCAD SHX Text

ELECTRICAL CLOSET 2C-148

AutoCAD SHX Text

OFFICE 2C-129

AutoCAD SHX Text

EXAM RM 2C-145

AutoCAD SHX Text

VESTIBULAR LAB 2C-112

AutoCAD SHX Text

EEG 2C-113

AutoCAD SHX Text

EMG LAB 2C-111

AutoCAD SHX Text

STORAGE 2C-109

AutoCAD SHX Text

EMG LAB 2C-108

AutoCAD SHX Text

EEG / EVOKE POTENTIALS 2C-107

AutoCAD SHX Text

EMG OFFICE 2C-106

AutoCAD SHX Text

NEURO OFFICE 2C-103

AutoCAD SHX Text

NEURO PSYCHOLOGY OFFICE 2C-104

AutoCAD SHX Text

HAC 2C-102

AutoCAD SHX Text

NEUROLOGY PHYSICIAN EXAM RM 2C-105

AutoCAD SHX Text

NEUROLOGY SERVICE 2B-177

AutoCAD SHX Text

CHIEF NEUROLOGY SERVICE 2B-175

AutoCAD SHX Text

NEUROLOGY PHYSICIAN 2B-174

AutoCAD SHX Text

PHYSICIAN 2B-176

AutoCAD SHX Text

PHYSICIAN 2B-178

AutoCAD SHX Text

CLERK 2B-172

AutoCAD SHX Text

PHYSICIAN 2B-171

AutoCAD SHX Text

PHYSICIAN 2B-179

AutoCAD SHX Text

PHYSICIAN 2B-180

AutoCAD SHX Text

ENG LAB 2B-181

AutoCAD SHX Text

CLIN RES COOR 2B-168

AutoCAD SHX Text

REGION CARE COOR 2B-164

AutoCAD SHX Text

R EDUC COOR 2B-152

AutoCAD SHX Text

SITE DIR 2B-161

AutoCAD SHX Text

R PROG MGR 2B-158

AutoCAD SHX Text

R PSYCH 2B-151

AutoCAD SHX Text

GRANT WRITER 2B-150

AutoCAD SHX Text

EXT CONS (3) 2B-173

AutoCAD SHX Text

DEMO 2C-110

AutoCAD SHX Text

HEAD NURSE 2C-114

AutoCAD SHX Text

CORRIDOR 2B-253

AutoCAD SHX Text

CORRIDOR C2B-8

AutoCAD SHX Text

CORRIDOR 2B-258A

AutoCAD SHX Text

CORRIDOR C2C-2

AutoCAD SHX Text

CORRIDOR C2C-3

AutoCAD SHX Text

CORRIDOR C2C-5

AutoCAD SHX Text

CORRIDOR C2C-7

AutoCAD SHX Text

PSYCHOLOGY CORRIDOR C2C-8

AutoCAD SHX Text

CORRIDOR C2C-1

AutoCAD SHX Text

CORRIDOR C2D-2

AutoCAD SHX Text

MECHANICAL SVC BAY - Q 2B-186

AutoCAD SHX Text

NURSE OFFICE 2B-102

AutoCAD SHX Text

CORRIDOR C2B-10

AutoCAD SHX Text

MARINE PATIENT ADMIN TRACKING TEAM 2C-100A

AutoCAD SHX Text

MECHANICAL SVC BAY - T 2C-100

AutoCAD SHX Text

ELEC SVC BAY 2C-101

AutoCAD SHX Text

ELEC SVC BAY 2A-153

AutoCAD SHX Text

MECHANICAL SVC BAY - U 2A-152

AutoCAD SHX Text

NEURO WAITING RM 2A-152A

AutoCAD SHX Text

MECHANICAL SVC BAY - P 2A-145

AutoCAD SHX Text

OFFICE 2C-158

AutoCAD SHX Text

CORR

AutoCAD SHX Text 2D-203

AutoCAD SHX Text

TOILET 2C-160A

AutoCAD SHX Text

OFFICE 2C-159

AutoCAD SHX Text

OFFICE 2C-161

AutoCAD SHX Text

OFFICE 2C-160

AutoCAD SHX Text

OFFICE 2C-163

AutoCAD SHX Text

OFFICE 2C-162

AutoCAD SHX Text

RECEPTION 2C-165

AutoCAD SHX Text

OFFICE 2C-164

AutoCAD SHX Text

WAITING 2C-166

AutoCAD SHX Text

TOILET 2C-167

AutoCAD SHX Text

OFFICE 2C-168

AutoCAD SHX Text

OFFICE 2B-169

AutoCAD SHX Text

TOILET 2B-170

AutoCAD SHX Text

SHOWER 2B-167

AutoCAD SHX Text

OFFICE 2B-165

AutoCAD SHX Text

TOILET 2B-166

AutoCAD SHX Text

TOILET 2B-163

AutoCAD SHX Text

OFFICE 2B-162

AutoCAD SHX Text

EEG/PAT TEST/STORAGE 2B-159

TOILET 2B-160

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A101

A

DESIGN DEVELOPMENT

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

A/E firm name A/E firm street address A/E firm city, state, zip code A/E firm phone number A/E firm POC engineering discipline <EDIT TEXT>:

Consultant firm name Consultant firm street address Consultant firm city, state, zip code Consultant firm phone number Consultant POC

Project Location Project Director

Issue date Chkd By Drwn ByRevisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A104

NEW WORK PLAN - 2E AND 2H

AREAS

A

DESIGN DEVELOPMENT

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

A/E firm name A/E firm street address A/E firm city, state, zip code A/E firm phone number A/E firm POC engineering discipline <EDIT TEXT>:

Consultant firm name Consultant firm street address Consultant firm city, state, zip code Consultant firm phone number Consultant POC

RENOVATE VARIOUS HALLS

AND WALLS

Project Location

652-19-102

Project Director

Issue date Chkd By Drwn ByRevisions: Date:

Scale: 1/8" = 1'

PLAN VIEW - 2H AREA

Scale: 1/8" = 1'

PLAN VIEW - 2E AREA

LEGEND

FINISH REPLACEMENT, WHICH INCLUDES FLOORING (WSF-1), PAINT,

WALL BASE, HAND RAILS, UPPER AND LOWER CRASH GUARDS, AND

CORNER GUARDS. USE MATERIALS IN FINISH SCHEDULE "SCHEME B".

SEE SHEET A109

SAME AS ABOVE…