36C24619B0010-0003011.pdf
PDF 263 KB Posted
- Attached to
- Roof Replacement Bldg. 5 Federal contract opportunity
- Solicitation number
- 36C24619B0010
About this file
36C24619B0010 0003 S06. SF30 36C24619B0010 P0003.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24619C0089-000.docx | DOCX document | |
| 36C24619B0010-0002000.docx | DOCX document | |
| 36C24619B0010-0002001.pdf | ||
| 36C24619B0010-0001000.pdf | ||
| 36C24619B0010-0001001.pdf | ||
| 36C24619B0010-0001002.pdf | ||
| 36C24619B0010-0001003.pdf | ||
| 36C24619B0010-004.pdf | ||
| 36C24619B0010-001.pdf | ||
| 36C24619B0010-003.pdf | ||
| 36C24619B0010-002.pdf | ||
| 36C24619B0010-000.docx | DOCX document | |
| 36C24619B0010-000.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
659-19-101
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
To all Offerors/Bidders
36C24619B0010
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: Tuesday, August 6, 2019 10 AM EST
See CONTINUATION Page
The purpose of this modification:
1. Answer the questions received.
2. Announce location and time of the bid opening.
All other terms and conditions remain in effect
All bids will be opened on: Tuesday, August 6, 2019 10AM Location: W.G. Bill Hefner VA Medical Center Bldg 21 B Conference Room 1601 Brenner Avenue Salisbury N.C.
QUESTIONS AND ANSWERS
1. Question: The drawings indicate a full tear off whereas the addendum indicates removal of roof surface and leaving existing insulation in place. Please clarify intentions.
Answer: Remove roof surface to include coverboard/facer/perlite so as to expose existing insulation (iso) board. Existing Insulation is to be tested and removed as specified.
2. Question: % of Bid for bid bond amount?
Answer: 20% as stated in FAR 28.101-2(b)
3. Question: Acceptable bid bond forms (Bid bond, postal money order, certified check, cashier's check or irrevocable letter of credit)?
Answer: Bid Bonds, and Irrevocable Letter of Credit
4. Question: Sealed Bid’s due date and time?
Answer: Please review this Amendment.
5. Question: Please advise on the basis for excluding competition with this proprietary spec. FiberTite is only one manufacturer that provides the ASTM D6754 material, making it a proprietary item and therefore, typically not permitted on a government job.
Answer: This is not a proprietary spec. FiberTite, Tremco, and Ecology meet ASTM D6754.
6. Question: The bid sheet calls for the roof surface only to be removed. If you tear off any membrane, the ISO will have to be removed as well due to the nature of the original install. The facer will come off of the ISO board on the roof surface removal since the roof surface is hot mopped to the insulation; there is no way of avoiding this. This work would require 100% of the insulation to be as well. If we bid this project as is, we'll undoubtably hit a change order situation given only 50% of the insulation is covered in the other two bid options. Recovering after removing the roof surface is not an option.
From the VA's position, is this acceptable?
Answer: Remove roof surface to include coverboard/facer/perlite to expose existing insulation board. Insulation board is to be tested and removed as specified.
7. Question: As we are working through the documents, it isn't clear what the warranty of construction is on this project for bonding purposes. It refers to FAR clause 52.246-21 and that points to a 1-year warranty of construction. Can you provide clarification on this?
Answer: As stated in FAR 52.246-12, the warranty of construction is 1 year from the date of final acceptance. Warranty of construction covers the work performed under the contract is free of defects in equipment, material, or design furnished, or workmanship performed. Obtain all warranties that would be given in normal commercial practice, require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.
QUESTIONS AND ANSWERS