5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2.

AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF

CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV.

11/2016) is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR

43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS

ENTERED INTO

PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14.

DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME

AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS

OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 07-17-2018 na/ Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders

36C24618R0818 07-17-2018

X X X X This amendment is to answer solicitation questions and to add FAR Clause 52.219-14 as a referenced clause under FAR Clause 52.212-5.

See attached document for answers to solicitation questions.

Marchelle Peyton Contracting Officer Attachment 1- Solicitation 36C24618R0818 Questions and Answers Mobile PET/CT Scan Services for Hampton VAMC and Salem VAMC

1. Question: Do you want two review stations with one at each location or do you want two at each location?

Answer: Two at each location.

2. Question: Do you want two monitors for each station or one monitor for each station?

Answer: Two at each location.

3. Question: Would you consider 1 review station with appropriate software installed on facility desk tops? That option is much less expensive.

Answer: VA IT requires all software to be evaluated by them before they would install it on a VA Desktop or Laptop System. This would be required after award and would take some time to do. Therefore, the contracting officer has decided that it would be in the best interest of the Government to require the Contractor to supply both review stations with the appropriate software.

4. Question: Hampton VA patient numbers appear lower than anticipated. Does this location have an in-house PET/CT and the mobile is used to lower backlog?

Answer: No, Hampton VA does not have an in-house PET/CT. There number are the same as last year and they do not anticipate an increase or decrease, however we did experience upward and downward fluctuation in quantities from Facilities on that contract.

5. Question: I know this is a speculation question but the start date is Apr. 2019. Do you anticipate other locations being added to this contract before Apr? 2019?

Answer: No.

6. Question: Under the title “Instructions for proposal submission” is the following language:

Offerors shall provide one copy of their proposal via email to larry.lapp@va.gov (PDF or MS Word only) which includes separate volume sections addressing 1) Past Performance volume, 2) Technical volume and 3) Pricing volume. Each Volume shall be clearly marked with the Offerors Name, RFP Number, RFP Title, Officers DUNs Number and Socio-Economic Status.

Do you prefer one document with the volumes in 3 sections or three separate documents?

Answer: One submittal with 3 separate sections. One addressing Past Performance, one addressing Technical and one addressing Price.

7. Question: The volume of technical information required to satisfy the RFP is large (copies of all licenses and certifications for company and techs). If the VA email system is limited to a size of 5 MB or less, do you prefer all copies submitted with RFP (multiple follow up emails/attachments) or only upon award?

Answer: Great point, we have had this problem in the past. All required documents are required to be submitted with your proposal. Please forward your email proposal in a series of numbered emails if necessary.

8. Question: Under 2 – Factor 2 – Technical is this language:

The technical proposal shall be type printed on standard size white paper in 11 pitch New Times Roman font, on a single side. No notebooks and special binding methods are required. Clips or a single staple on the upper left corner is sufficient. Technical proposals are limited to no more than 50 pages and shall include the Offer Form, offerors experience, personnel, technical approach and product description as a minimum.

I assume the above language is from an old template and should be omitted, please confirm?

Answer: Ref: In the “Instructions for Proposal Submission”; Factor 2 – Technical, second paragraph is replaced by the below wording:

“The technical submittal shall be type printed on standard size white paper in 11 pitch New Times Roman font, on a single side. Technical submittals are limited to 50 pages and shall include the Offer Form, offerors experience, personnel, technical approach and product description as a minimum.”

9. Question: Are the telephone receptacles provided by each facility at the mobile pad waterproof outlets (Hubbell PH6495) mounted in weatherproof boxes (Hubbell Ph6619) and mounted within 50 feet of the mobile pad? If not, what type of telephone receptacles are provided at each facility?

Answer: Standard Telephone receptacles, mounted near mobile pad. Currently NON-Waterproof type.

10. Question: Are the data line receptacles provided by each facility at the mobile pad standard RJ45 connections with weatherproof covers and within 50 feet of the mobile pad? If not, what type of data receptacles are provided at each facility?

Answer: Standard RJ45 receptacles, mounted near mobile pad. Currently NON-Waterproof type.

11. Question: Is the electrical power provided by each facility 60Hz, configured in three-phase “wye” and within 50 feet of the mobile pad? If not, what type of electrical power is provided?

Answer: 60Hz, Three-phase in waterproof receptacle, near mobile pad.

12. Question: What are the anticipated work hours at each facility? The S.O.W. states 0800-1830 on page 17, while pages 29 and 78 state 0800-1630.

Answer: During the days the contractor is on station the hours of operation shall be 0800-1830.

13. Question: What is the required year of manufacture of the camera? The Pre-solicitation Notice states 2007 while page 11 of the S.O.W. states 2004.

Answer: Paragraph 3 of B.4 Performance Work Statement, first sentence is corrected as listed below.

“3. CONTRACTOR’S FURNISHED EQUIPMENT: Equipment shall include but not be limited to a Contractor furnished fully equipped PET/CT Mobile Trailer where studies will be performed on a PET/CT scanner manufactured after January 2007 and a PET/CT review station and fusion software to be placed within each medical center obtaining service under this contract.”

14. Question: How many workstations with software for the interpretation of PET/CT images are required to satisfy this bid? (The wording on page 13, item K is confusing. One at each facility for a total of two for the bid, or two at each facility for a total of four for the bid?)

Answer: Two at Hampton VAMC and two at Salem VAMC for a total of four.

15. Question: What is the anticipated award date?

Answer: Before 1 April 2019 with a performance period to start 1 April 2019.

16. Question: This is a 100% SDVOSB set-aside. Can the prime contract take on a sub-contract as long as at least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.

Answer: Yes, however please refer to the below FAR Clause 52.219-14 “Limitations on Subcontracting (Jan 2017)” which was inadvertently omitted from the solicitation by reference under FAR Clause 52.212-5 and which is now included by reference under FAR Clause 52.212-5. This clause will provide proper guidance on the implementation of the 50 percent rule.

52.219-14 -- Limitations on Subcontracting (Jan 2017)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Applicability. This clause applies only to--

(1) Contracts that have been set aside or reserved for small business concerns or 8(a) participants;

(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) participants; and

(3) Orders set aside for small business or 8(a) participants under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).

(c) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for --

(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.

(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.

(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.

(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.

(End of Clause)