36C24618Q0585-0001000.docx

DOCX document 28 KB Posted

Attached to
Patient Lodging for Eligible Beneficiaries VAMC Durham, NC
Solicitation number
36C24618Q0585
Issued by

About this file

36C24618Q0585 0001 36C24618Q0585 0001.docx

View the file

Other files

File Type Posted
36C24618Q0585-0002000.docx DOCX document
36C24618Q0585-006.docx DOCX document
36C24618Q0585-007.pdf PDF
36C24618Q0585-002.docx DOCX document
36C24618Q0585-005.docx DOCX document
36C24618Q0585-003.docx DOCX document
36C24618Q0585-004.docx DOCX document
36C24618Q0585-001.docx DOCX document
36C24618Q0585-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2.

AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF

CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV.

11/2016) is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR

43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS

ENTERED INTO

PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14.

DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME

AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS

OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 07-09-2018 558-19-1-117-0001

NONE

Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders

36C24618Q0585 07-06-2018

X X X X The purpose of this Amendment is to answer questions that were received as of July 9, 2018.

Please see Page 2 for Questions and Answers.

Offers must still be received NLT Friday, July 20, 2018 at 2:00 PM.

LEAH A. TROSSEN

CONTRACTING OFFICER

VA-VHA-SAOE-2017-C35F3286

1. Q. a. Please clarify: Section 2.1 states, “VA personnel will call or email hotel by 5:00 p.m. to reserve rooms for that night.” Section 2.2 states “A Veteran Lodging List will be emailed over by 5:00 pm the prior business day.”

A. Section 2.2 “A Veteran Lodging List will be emailed over by 5:00 pm to the prior business day” will be removed from Performance Work Statement.

Q b. Section 2.4 states, “The Contractor will utilize the reservation list (order) to reserve rooms and confirm room blocks as soon as possible, but no later than close of business five business days after receipt of the reservation list. Confirmation will be sent to the Durham Veteran Administration Medical Center via e-mail.”

A. This is the list sent to the Patient Lodging Coordinator by the Contractor so we can verify which veterans checked in for invoicing purposes. Must receive within five business days from stay.

2. Q. a. Can you please clarify the number of rooms per day?

A. This is an Indefinite Quantity Contract; all number of rooms are estimates.

Q. b. Section B.3. Price/Cost Schedule states, “A minimum of 1 room and a maximum of 20 rooms will be required 7 days a week.”

A. These are estimates for the week.

Q. c. Section B.3. Price/Cost Schedule also states, “the maximum number of rooms is 36,400.” The estimated quantity for each CLIN is 5,460 so it appears the maximum number of rooms would be 27,300.

A. These are estimates, we add additional rooms so the contract would not be in default if it goes over.

Q. d. Section 2.1 states, “Contractor will guarantee 20 rooms per night is to be billed to the Durham Veteran Affairs Health Care System, for Sunday through Thursday, and five rooms on Friday and Saturday.”

A. Exactly as written, these are the number of rooms needed to be held for the government on a daily basis.

3. Q. Is the VA requesting more than one hotel option in each proposal? Section 2.2 states, “Lodging assignments will be on a rotation basis. If a veteran has a preference for a particular hotel, the VA will try to accommodate and continue with rotation.”

A. The Government will award up to three hotels.

4. Q. Is hotel required to provide complimentary breakfast for Veteran only or Veteran and caregiver?

A. Yes, Spouse or caregiver staying at hotel with veteran.

5. Q. Can you please confirm days and times for shuttle service?

A. See PWS Section 6.2