About this file

This is a Sources Sought Notice for the rental, delivery, installation, and start-up of an 80 KVA Uninterruptible Power Supply (UPS) system at the Louis A. Johnson VA Medical Center in Clarksburg, West Virginia. The Department of Veterans Affairs, Veterans Health Administration, Network Contracting Office 5 issued this pre-solicitation notice (Solicitation Number 36C24526Q0812) with a response deadline of September 14, 2026, at 10:00 AM Eastern Time. Responses should be submitted to Contracting Officer Bill Pratt at Billie.Pratt@va.gov. The Product Service Code is J061 (Electrical and Power Generation Equipment Services) with NAICS Code 238210. Interested vendors must provide their business name and Unique Entity ID, business type and socio-economic status, point of contact information, a capability statement documenting prior experience with VA or similar facilities, available contract vehicles (such as GSA FSS), a summary of services offered, relevant certifications and licenses, and responses addressing whether they intend to self-perform or subcontract the work.

The contractor will be responsible for the complete delivery, installation, start-up, maintenance, and removal of the rental UPS system, including full disassembly and removal of the existing Liebert UPS Model 37BP080XWXCBNR to accommodate the temporary unit due to space constraints. Required certifications include an Electrical License, expertise with Liebert/Vertiv UPS systems (specifically three-phase 80 kVA installations), NFPA 70E certification, OSHA 10/30 training, and Lock Out Tag Out (LOTO) procedures. The base performance period is twelve months from equipment delivery and acceptance, with two government-unilateral options to extend for an additional twelve months each. The contractor must provide a detailed maintenance and service schedule, ensure daily cleanup of work areas and debris removal, comply with all OSHA safety requirements, and coordinate all activities exclusively with the VA Contracting Officer's Representative. All equipment remains the property of the rental vendor and must be maintained per manufacturer specifications.

View the file

Other files

File Type Posted
36C24526Q0812_SOURCES SOUGHT NOTICE.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sources Sought Notice Sources Sought Notice

SUBJECT*
SOURCES SOUGHT NOTICE - RENTAL OF UPS - Uninterruptible Power Supply FOR PHONE ROOM LOUIS A JOHNSON VA MEDICAL CENTER 36C24526Q0812

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
21902
SOLICITATION NUMBER*
36C24526Q0812
RESPONSE DATE/TIME/ZONE
09-14-2026 10:00 EASTERN TIME, NEW YORK, USA
ARCHIVE
60 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N

SET-ASIDE

PRODUCT SERVICE CODE*
J061
NAICS CODE*
238210
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

VAMC

361 Boiler House RD Perry Point MD 21902

POINT OF CONTACT*

Contracting Officer Bill Pratt Billie.Pratt@va.gov 410-642-2411

PLACE OF PERFORMANCE

ADDRESS
Department of Veterans Affairs

Louis A Johnson VA Medical Center

1 Medical Center Drive

Clarksburg WV

POSTAL CODE
26301
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL
https://www.va.gov
URL DESCRIPTION
VA
AGENCY CONTACT’S EMAIL ADDRESS
billie.pratt@va.gov
EMAIL DESCRIPTION
NCO 5

DESCRIPTION

Department of Veterans Affairs, Veterans Health Administration, Network Contracting Office 5, is issuing this Notice of Sources Sought for a contractor for delivery, installation, and start-up, of a rental 80 KVA UPS. For the CLARKSBURG “Louis A Johnson” VA MEDICAL CENTER.

1 Medical CTR DRIVE, Clarksburg, WV 26301.

All responsible sources may submit a capabilities statement and answer the subcontracting questions listed below. At minimum the below response must include the following.

All responses must include the following information or will not be considered.

Please respond to this Sources Sought Notice 36C24526Q0812 with your:

1. Business name (including Unique Entity ID (SAM.gov)

2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), and

3. Person of contact (including telephone number & email address).

4. Capability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities.

5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (include applicable NAICS)

6. Brief Summary of categories of services that your company can/cannot provide.

7. Certification(s) / Licenses for meeting the local requirements to provide these services at the DC VAMC (if applicable)

8. Confirmation that your organization has the capability & expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response:

a. Do you intend to self-perform this effort?

b. If you are located outside the immediate area, how will you self-perform?

c. Or do you intend to subcontract work under this contract?

d. If you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting?

Please include certifications or knowledge that demonstrate competency.

1. Electrical License

2. Must be able have the ability for Installing or interfacing with a UPS—especially a three‑phase 80 kVA system

3. Certifications working with Liebert/Vertiv UPS systems requires familiarity with their installation, electrical interface, battery system, control wiring, commissioning practice, and safety requirements.

4. LOC out Tag out procedures, OSHA 10/30 Training Certifications

5. NFPA 70E certification.

6. Commissioning of Liebert unit

Must Respond with all information by September 14th, 2026, at 10:00 AM ET. Send all responses to Bill Pratt, Billie.Pratt@va.gov

STATEMENT OF WORK

SCOPE OF WORK

1. PROJECT DATA:

a) TITLE: Server Room UPS Rental

b) BUILDING/FACILITY: Bldg. 1 LAJVAMC

2. GENERAL SCOPE

This project covers the delivery, installation, and start-up, of a rental 80 KVA UPS. Contractor will verify the existing connected load to an existing Liebert UPS:

Model 37BP080XWXCBNR Serial # 3T00005193 Perform all necessary demolition and site preparations to install a temporary UPS of the same size and capacity as existing. Due to space limitations, it is anticipated that the existing Liebert UPS referenced above will require full disassembly and removal prior to the placement and connection of a temporary UPS of comparable size and capacity.

The Contractor shall be responsible for all labor, materials, equipment, and tools necessary to complete the delivery, demolition of existing, installation of temporary and start-up, maintenance (if required), and removal of the rental equipment to include disassembly at the end of the rental period. The Contractor shall clean the work area daily and secure all tools and materials for patient and staff safety.

3. GENERAL CONDITIONS AND DEFINITIONS

1. COR: Contracting Officer’s Representative. A VA employee of the Louis A. Johnson VA Medical Center Facilities Management Service officially assigned to act as Project Manager and Inspector. The COR shall be the primary point of contact on all matters concerning the contract work.

2. Coordination: All administrative and logistical requirements regarding the project must be exclusively coordinated with the assigned COR. No other person has authority to direct or approve changes to contract work unless specifically authorized.

3. Provide (Rental): For the purpose of this scope, the term “Provide” means to deliver, install, and make available for use fully functional rental UPS system(s) and associated battery cabinet per manufacturer’s instructions and SOW requirements.

4. Remove (Rental Return): At the conclusion of the rental period, all equipment will be disconnected and prepared for return shipment to the vendor. The vendor will coordinate pickup and removal with the COR.

5. The contractor shall remove all debris resulting from delivery, installation, and start-up immediately upon completion of the activity. The work site will be left clean and orderly at all times.

6. All activities shall correspond to this Scope of Work. Any discrepancy identified between this SOW and actual site conditions shall be promptly brought to the attention of the VA COR before continuation.

4. DETAILED REQUIREMENTS

1. Equipment to be Provided and Installed:

· UPS Systems (Qty 1):

· Size, model capacity to be field verified by vendor based on existing connected load.

· Reference 80 kVA Liebert UPS as basis for comparison.

2. Services Included:

· Delivery of all rental equipment to the loading dock at Louis A. Johnson VA Medical Center, 1 Medical Center Drive, Clarksburg, WV 26301.

· Start-up services by a qualified Sure Power Engineer (does not include on-site commissioning or load testing).

· Return (outbound) shipping at the end of the rental period.

· All equipment shall remain the property of the rental vendor and be maintained in accordance with manufacturer’s specifications during the rental period.

3. Maintenance and Service Schedule:

· The Contractor shall provide a detailed maintenance and service schedule for the rental equipment to the VA Contracting Officer’s Representative (COR) prior to or upon equipment delivery. This schedule shall include all planned maintenance, inspections, and required servicing for the duration of the rental period. Any updates or changes to the maintenance schedule must be promptly communicated to the COR. Documentation of all performed maintenance and service activities shall be submitted to the VA for tracking and recordkeeping purposes.

4. Customer Responsibilities:

· Provide a safe, accessible location for equipment installation at Louis A. Johnson VA Medical Center.

· Installation and all required external cabling to be done by the VA or as otherwise coordinated.

· Notify contractor of any required schedule changes or access issues at least 72 hours in advance.

5. Site and Safety Requirements:

· Contractor is responsible for all activities related to the safe delivery, set-up, energizing, and de-energizing of the rental units.

· All packaging, dunnage, and debris from delivery, start-up, or removal must be promptly cleaned up and removed off government property daily. VA dumpsters may not be used.

6. Performance Verification:

· After start-up, the Contractor shall demonstrate in-service that the UPS units and battery cabinets are functioning as intended, in coordination with VA technical staff.

· Any technical troubleshooting or warranty service during the rental shall be promptly performed by the Contractor or their designee.

· At the conclusion, the Contractor shall participate in the power-down and removal of both the UPS and battery cabinet and coordinate all return logistics.

5. SAFETY PRECAUTIONS

A. Contractor shall comply with all applicable Federal, State, and Local requirements regarding safety and health, including but not limited to OSHA statutes and regulations. The contractor is solely responsible for determining applicable requirements and ensuring a safe and healthful worksite.

B. The Contractor shall take precautions to protect Government property at all times.

C. The Contractor shall observe all facility fire, safety, and security requirements, including protection of egress routes.

D. No flammable liquids will be stored or used in the VA facility.

E. Appropriate portable fire extinguishers shall be available per National Fire Protection Association (NFPA) standards.

F. The Contractor shall take necessary precautions to avoid triggering smoke detectors or sprinkler systems.

6. PERIOD OF PERFORMANCE

The period of performance for this contract shall be a base year of twelve (12) consecutive months from the date of equipment delivery and acceptance at the Louis A. Johnson VA Medical Center, with two (2) Government unilateral option to extend the contract for an additional twelve (12) months. The Government may exercise the option year by providing written notice to the Contractor at least thirty (30) days prior to the expiration of the base year. All terms and conditions applicable to the base year shall apply to the option period, if exercised.

See attached document: 36C24526Q0812_SOURCES SOUGHT NOTICE.