36C24526Q0704.docx
DOCX document 42 KB Posted
- Solicitation number
- 36C24526Q0704
About this file
This is a Notice of Intent to Sole Source a Karl Storz endoscopy equipment support contract for the Washington DC VA Medical Center. The Department of Veterans Affairs is seeking a contractor to provide comprehensive maintenance and support services for Karl Storz scope and camera equipment at the facility located at 50 Irving Street NW, Washington, DC 20422. The base period of performance runs from October 15, 2026, through October 14, 2027, with a response deadline of July 30, 2026, at 11:00 AM Eastern Time. The solicitation number is 36C24526Q0704, and the contracting office is located in Perry Point, Maryland (zip code 21201), with William Chris Galletta serving as the point of contact.
The scope of services encompasses preventative maintenance according to manufacturer recommendations, unlimited corrective maintenance and repairs, parts and materials replacement, software updates and patching, and 24/7/365 technical support via telephone. The contractor must provide on-site labor and travel, use only Original Equipment Manufacturer (OEM) certified parts and OEM-trained personnel, and respond to trouble calls within thirty minutes with a maximum dispatch time of the following workday. The equipment list includes over 1,800 items across multiple categories: accessories and spare parts, C-MAC imaging systems, electro-mechanical devices (insufflators, light sources, monitors, cameras), flexible and rigid endoscopes, and various surgical instruments. The contractor must maintain active OEM service coverage, provide detailed service reports within five business days of completion, and comply with specific requirements regarding security, infection control, waste removal, chemical disclosure, property damage prevention, and patient health information safeguarding. Payment will be made in arrears upon receipt of properly prepared invoices that include contract period, equipment model, contract and purchase order numbers, and correct payment address.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBJECT*
NOTICE OF INTENT TO SOLE SOURCE REQUIREMENT
KARL STORZ ENDOSCOPY EQUIPMENT
DC VA MEDICAL CENTER DEPT. VETERANS AFFAIRS
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 21201 |
| SOLICITATION NUMBER* |
| 36C24526Q0704 |
| RESPONSE DATE/TIME/ZONE |
| 07-30-2026 11:00 EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 60 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
| PRODUCT SERVICE CODE* |
| J065 |
| NAICS CODE* |
| 811210 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Perry Pt VAMC
NCO 5
361 Boiler House Rd Perry Pt MD 21902
POINT OF CONTACT*
Contracting Officer William Chris Galletta william.galletta@va.gov
ADDITIONAL INFORMATION
| AGENCY’S URL |
| https://www.va.gov/washington-dc-health-care/ |
| URL DESCRIPTION |
| DC VA |
| AGENCY CONTACT’S EMAIL ADDRESS |
| william.galletta@va.gov |
| EMAIL DESCRIPTION |
| NCO 5 |
DESCRIPTION
Karl Storz CSA Support Contract
A. GENERAL
Scope of Services:
The purpose of this requirement is to provide support for the Karl Storz scope and camera equipment at Washington DC VAMC. The Contractor shall provide all labor, personnel, equipment, tools, materials, supervision and other items and services necessary to perform service and maintenance.
Location: Washington DC VA Medical Center, 50 Irving Street NW, Washington, DC 20422.
B. WORK HOURS
a. Hours of Operation: Normal business hours are Monday through Friday, 8:00 a.m. to 4:00 p.m., excluding holidays. Should the Contractor require work afterhours, the Contractor shall arrange in advance with the Contracting Officer’s Representative (COR).
b. Delivery Hours: The Warehouse is open to receive deliveries Monday through Friday, 8:00 a.m. to 4:00 p.m., excluding holidays.
c. National Holidays: The holidays observed by the Federal Government are: New Year’s Day, Martin Luther King Day, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day and any other day specifically declared by the President of the United States to be a national holiday. Contractor may work on holidays with prior communication and coordination.
C. PERIOD OF PERFORMANCE
Base Year:
Karl Storz CSA Service Contract 10/15/2026 - 10/14/2027
D. EQUIPMENT
| Device |
| Description |
Accessories/Spare Parts (181) Accessories/Spare Parts EM Video
Accessories/Spare Parts Endoscopes
Accessories/Spare Parts Instruments
Accessories/Spare Parts Lighting/Viewing
C-MAC (45)
C-MAC Accessories
C-MAC Imager
C-MAC Monitor
Electro Mechanical (410) Electro Mechanical AIDA-Image Capture
Electro Mechanical Camera Heads
Electro Mechanical CCU/Modules
Electro Mechanical Coupler/Adapter
Electro Mechanical Device Control
Electro Mechanical High Frequency
Electro Mechanical Insufflators
Electro Mechanical Light Cables
Electro Mechanical Light Sources
Electro Mechanical Monitors
Electro Mechanical Printers
Electro Mechanical Smoke
Page 1 of
Evacuation
Electro Mechanical Telepack
Electro Mechanical Zerowire
Fiber Flexible Scopes (88) Fiber Flexible Cystoscope
Fiber Flexible Hysteroscope
Fiber Flexible Rhino-Laryngoscope
Fiber Flexible Ureteroscope
Instruments (895) Instruments Access Devices
Instruments Bridges
Instruments Burrs
Instruments Clamps
Instruments Clickline
Instruments Currettes/Loops
Instruments Dilators
Instruments Dismantling
Instruments Dissectors
Instruments Elevators/Rasp
Instruments Evacuators
Instruments Forceps
Instruments Guides
Instruments Handles
Instruments Holders
Instruments Knives
Instruments Laryngoscope
Instruments Light Carrier
Instruments Needles
Instruments Obturators
Instruments Otoscope
Instruments Picks
Instruments Probes
Instruments Punches
Instruments Retractors
Instruments Scissors
Instruments Sheaths
Instruments Speculum
Instruments Suction/Irrigation
Instruments Suture/Ligature
Instruments Tubes-Operating
Instruments Working Elements
Semi-Rigid Scopes (13) Semi-Rigid Intubation
Semi-Rigid Perc Neph
Semi-Rigid Saliendoscope
Semi-Rigid Ureteroscope
Specialty Rigid Scopes (26) Specialty Rigid EndoCAMeleon
Specialty Rigid NIR Filter
Specialty Rigid Operative
Specialty Rigid PDD
Specialty Rigid VITOM
Standard Rigid Scopes (234) Standard Rigid Tier 1 (< 24cm)
Standard Rigid Tier 2 (24-38cm)
Standard Rigid Tier 3 (> 38cm)
| Video Flexible Scopes (89) |
| Video Flexible Cystoscope |
Video Flexible Intubation
Video Flexible Rhino-Laryngoscope
Video Flexible Ureteroscope
E. SPECIFICATIONS
a. Preventative Maintenance
i. This contract shall include all preventative maintenance (PM) of the equipment according to manufacturer’s recommendations/procedures in the equipment manual.
ii. All tasks in the manufacturer’s procedures shall be completed at the manufacturer’s listed frequencies.
iii. PMs will be accomplished in accordance with the Original Equipment Manufacturer (OEM) recommendations.
b. Corrective Maintenance
i. The contract shall include all on-site corrective (unplanned) maintenance/repair of the equipment in accordance with the manufacturer’s manual.
ii. Recalls & Alerts-- Contractor shall perform all remediation actions needed for product alerts and recalls issued for the equipment.
iii. The contractor will perform unlimited corrective services on equipment/systems under full coverage agreement from OEM.
1. Provide labor and replacement parts, as necessary, to return the Products listed to normal operating conditions, provided that such service is necessitated by the failure of or accidental damage to the Product during normal usage for its intended purpose and such failure is not otherwise excluded from coverage as set forth herein. The number of repairs or exchanges that may be performed on the Covered Products is unlimited. All replaced or exchanged parts and Products shall become the property of KARL STORZ. Subject to the availability of Product, KARL STORZ may provide Customer with loaner Product while repairs or exchanges are being made.
2. In addition to, or instead of the services set forth in section 1(a) above, for the Covered Products referenced on Exhibit A attached hereto, KARL STORZ shall provide an unlimited number of exchanges whereby Customer will submit its damaged Covered Product in exchange for one that is in normal operating condition (each an “Exchange”), provided that such Exchange is necessitated by (i) the failure of or (ii) accidental damage to the Covered Product during normal usage for its intended purpose and such failure is not otherwise excluded from coverage under this Agreement. Exchanges will typically consist of the same Covered Product (by model/material number) or the closest available Product, as determined by KARL STORZ. Upon customer request, and at the sole discretion of KARL STORZ, customer may receive for its damaged Covered Product an exchange with a similar Product of different model/material number.
3. Provide applicable technology updates, as designated by KARL STORZ, at the time of Exchange or repair.
4. Upon request, and if available, provide a Damage Evaluation Report for each Product repaired or Exchanged.
5. Pay shipping costs to Customer for repaired, replaced or exchanged product using KARL STORZ’s preferred carrier.
6.
c. Parts/Materials/Tools/Labor
i. All parts and materials to complete the maintenance shall be included as a part of this contract
ii. Contractor shall provide their own tools to complete the maintenance.
iii. All labor (including travel) to complete the maintenance is included in the contract.
iv. Contractor must use OEM certified parts and service. Use of refurbished parts have to be approved in writing by Biomedical Engineering prior to use.
v. Engineer/technicians must be OEM trained on all equipment included in agreement. Proof of competency to be provided upon request.
d. Updates/Patching
i. Contractor shall complete available updates to the software at the discretion of Biomedical Engineering.
ii. Contractor shall complete all patching according to manufacturer’s specifications.
e. Response Time
i. Contractor shall respond to trouble phone calls within thirty minutes.
ii. The minimum standard response time for dispatch will be no later than the following workday after notification of equipment malfunction.
iii. Service agreement service call priority with OEM under active coverage.
f. Check in/Out
i. Contractor personnel arriving on-site to perform work shall report to the Biomedical Engineering Department.
ii. Contractor personnel shall sign in using the department’s vendor sign-in sheet, filling out all required information.
iii. Contractor personnel’s tool bags are subject to inspection by the Biomedical Engineering department upon arrival and upon departure.
iv. Contractor personnel shall sign out upon completion of visit.
v. Prior to departure, Contractor personnel are required to, at a minimum, verbally report any issues with the equipment to the Biomedical Engineering department, especially noting if the system is still down or not fully repaired.
vi. The VA campus is non-smoking. Contractor personnel are required to comply with this policy.
vii. Parking. It is the responsibility of the Contractor to park in the appropriate designated parking areas.
g. Reporting
i. Within 5 business days of award, must provide validation of equipment active coverage with OEM to certify service agreement in place.
ii. Contractor shall provide a copy of the service report, complete with test data, to the VHAWASHTM@VA.GOV within five business days after completion of any services.
iii. Service reports shall include identifying information about the equipment, all services provided during the service visit, any issues found during the visit, the technician/engineer names of the personnel performing work, and the date service was provided.
h. Remote Support
i. The Contractor shall provide a telephone line available 24/7/365 for technical support. Contractor shall also provide a phone number for VA staff to call to dispatch Contractor field service engineers/technicians.
ii. If remote support via site-to-site virtual private network (VPN) is required, Contractor shall work with the COR and the facility Information Security Officer (ISO) to meet the requirements prior to connection. A National Site to Site MOU/ISA is the preferred way to complete this connection.
i. Patient Health Information
i. The Contractor shall safeguard patient health information.
ii. The Contractor shall report to the Biomedical Engineering Department any issues with disclosed or unsecure patient health information.
iii. Contractor shall note remove any hard drives, storage devices, or anything containing patient health information from the site.
j. Contractor Requirements
i. All Contractor personnel performing services on the equipment shall have factory training and experience in the maintenance and repair of the equipment.
ii. Contractor shall provide copies of training certificates for the Contractor personnel performing work on-site upon the request of the Government.
iii. Waste Removal: The contractor is responsible to remove and properly dispose of all waste related to the services provide on-site.
k. Safety and Security
i. Contractor shall follow all Occupational Safety and Health Administration (OSHA) laws and regulations. The Contractor is responsible for reporting any hazards they come across to their point of contact.
ii. Contractor shall follow all local procedures concerning infection control. Should the Contractor be unsure of the requirements, the COR can provide the specific information and procedures.
iii. Contractor personnel shall wear visible identification at all times while on VA property. Contract personnel are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials.
iv. Property Damage
1. The contractor shall take all necessary precautions to prevent damage to any Government property.
2. The contractor shall report any damage immediately and shall be assessed current replacement costs for property damaged by the contractor, unless corrective action is taken.
3. Any damaged material (i.e., trees, shrubs, lawn/turf, curbs, gutters, sidewalks, etc.) will be replaced in a timely manner or corrected by the contractor with like materials, at no extra cost to the Government, upon approval of the Contracting Officer.
v. Chemical Use
1. Prior to performance of any work, the Contractor will be required to furnish the Contracting Officer with the trade names (if any) and chemical names of all chemicals to be used, along with a label showing contents, the use strength of the chemical as applied, and the antidote thereto.
2. Contractor shall furnish the same information each time a change is made to the chemicals or products used in the performance of this contract.
3. This information is required for emergency treatment in the event of ingestion or and/or contact with the material by humans.
F. QUALITY ASSURANCE
a. End-users, Biomedical Engineering, and/or the contract COR shall perform system verification tests to ensure the system is fully functional following service/repairs.
b. Issues with the quality of the Contractor’s work will be communicated through the Contracting Officer to the Contractor point of contact for resolution.
c. Documentation with be completed in the Government systems.
G. Invoicing/Payment
a. Noncontract Charges: The contractor shall not perform any service that will result in additional charges without prior approval from the Contracting Officer.
b. Payment: Payment will be made in arrears, and upon receipt of a properly prepared invoice. Any invoice that is not properly prepared may get refused and sent back for correction. An invoice must include the following criteria to be considered “properly prepared”:
i. Contract period of performance and monthly period of performance when the service was completed.
ii. Equipment model name serviced.
iii. Contract number
iv. Purchase order number
v. Correct payment address H. GUARANTEE: The contractor will guarantee workmanship and all parts furnished by the contractor for a period of not less than 90 days.
I. PRIOR INSPECTION OF EQUIPMENT: Potential contractors may, at their own expense, inspect equipment covered by this solicitation (ref 52.237-1 SITE VISIT). Arrangements must be made in advance with Biomedical Engineering.
J. Failure to carry out the above procedures will be considered as a failure to document the service visit and will constitute a failure to perform.
File details come from the government source that posted it. Updated .