Updated SOW Water Monitoring FY25.docx
DOCX document 37 KB Posted
- Attached to
- N046--Water Monitoring Baltimore & Loch Raven
- Solicitation number
- 36C24525Q0056
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity related to online water quality monitoring services at two VA medical centers. The key details are:
The contractor shall provide all personnel, equipment, supplies, and services needed for continuous water quality monitoring at the Baltimore VA Medical Center and Loch Raven VA Medical Center to comply with VA Directive 1061 requirements. This includes monthly onsite service inspections, emergency service, and maintenance of the monitoring systems. The contractor must be able to transmit the water quality data (pressure, dissolved solids, temperature, pH, chlorine levels) to a VA database in a format compatible with Microsoft Excel. The period of performance is for a 5-year ordering period under a Firm-Fixed-Price contract. The work will be monitored by a Contracting Officer's Representative (COR). The solicitation number is 36C24525Q0056 issued by the Department of Veterans Affairs, Veterans Integrated Service Network 5.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24525Q0056 Updated SOW.docx | DOCX document | |
| SOL questions.pdf | ||
| 36C24525Q0056 0001 admendment.docx | DOCX document | |
| 36C24525Q0056.docx | DOCX document | |
| 36C24525Q0056_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Water Monitoring
STATEMENT OF WORK
SCOPE OF WORK: The Contractor shall provide all personnel, management, material, parts, continuous water quality monitoring system and equipment, supplies, labor, and transportation in services needed for the online water monitoring treatment at the Baltimore VA Medical Center and the Loch Raven VA Medical Center to compliance with VA directive 1061 requirements. This will include continuing recurring service to the online monitoring system needs monthly and records real time data on specific parameters of the water quality. Parameters include water pressure, dissolved solids, temperature, pH, and residual oxidants (free chlorine and total chlorine) as per VA directive 1061requirements. The system must be able to transmit the data to a secure data base that is accessible to the VA Personnel so that the data can be viewed and downloaded in a tabular format that is compatible with Microsoft Excel.
All routine onsite service inspections, emergency service calls, and maintenance of the monitoring systems including chemical reagents and its components will be performed and supplied by the contractor (this includes remote modems for transmittal and data backup functions). The systems are proprietary equipment and are installed at the Baltimore VA Medical Center providing this service on Cold Water (source 1PA102), Hot Water (source 7A101), and distal Hot Water Return (source 1C100). Installation at Loch Raven Medical Center monitors Cold & Hot water supplies (source Basement Boiler Mechanical room). The contractor shall also provide monthly written reports on the operation of the unit including data in format of VA requested as well as necessary training to the VA staffing on operation of the system and any daily/weekly checks that are necessary. The period of performance will be for a five (5) year ordering period. Firm-Fixed-Price will be awarded to provide the required services. All work under this contract shall be monitored by the COR.
Requirements:
· Contractor provides all necessary maintenance including installation of reliable continue water monitoring system as mentioned above.
· For each continue water monitoring system, Test and record water pressure, dissolved solids, temperature, pH, and residual oxidants (free chlorine and total chlorine) as per VA directive 1061 requirement.
· For each continue water monitoring system, set up and check that the unit is transmitting and reporting data to the web portal in an easily comparable manner and user friendly.
· For each continue water monitoring system, Record values from each parameter from display unit all time.
· Calibration testing for water samples from supply line and recalibrate units as required to continuous reliable data.
· For each continue water monitoring system, the contractor must offer 24/7 monitoring with remote functionality or on-site for trouble calls and ensure technicians are available to service the unit within 24-48 hours of notification by the VA personnel. An action plan is required by contractor once notification received from the VA.
· Evaluate recordings against unit display for each parameter.
· Valve on/off water flow to flow assembly, if required to control flow.
· The Contractor is required to notify VA personnel of all updates related to the system, including the site visit schedule, in advance, if possible.
IV. DEFINITIONS/ACRONYMS
A. Contract Discrepancy Report (CDR): A report that the Government shall complete and issue to the Contractor when service is unsatisfactory and not in compliance with the terms and conditions of the contract. The Contractor is required to complete and return this form to the COR whenever performance is unsatisfactory. The CDR requires the Contractor to explain, in writing, the cause of the unsatisfactory performance, how performance will be returned to acceptable standards, and how reoccurrence of the problem will be prevented in the future.
B. Contracting Officer (CO): The individual with the authority to enter into, administer, and/or terminate contracts. The CO is the exclusive Government official authorized to execute changes and deviations or variations in the contract.
C. Contracting Officer's Technical Representative (COTR): A Government representative, designated in writing by the Contracting Officer, to be responsible for quality assurance, inspection, surveillance, documentation and acceptance of the Contractor's performance. A copy of the letter of designation will be provided to the Contractor.
D. Preventive Maintenance (PM): Services which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with minimal incidence of malfunction or inoperative conditions. To clean, lubricate, calibrate, test and replace faulty or worn parts and/or parts which are likely to become faulty, fail or become worn, repair or adjust components, or assemblies of components as necessitated by wear, tear, damage, or failure of parts, returning the equipment and/or instrument to the operating condition defined in the manufacturer’s specifications.
E. Repair Cost Estimate: The Contractors estimated cost (for parts, labor and freight) to repair a system according to manufactures' specifications and requirements.
F. Time: When hours are given, it shall mean clock hours exclusive of Saturdays, Sundays and Holidays unless otherwise specified (i.e., 1:00 P.M. Monday to 1:00 P.M. Tuesday equals 24 hours; 12:00 P.M. Friday to 12:00 P.M. Monday equals 24 hours). If days are indicated it shall mean calendar days including Saturdays, Sundays and Holidays.
G. Rework. Any work the Contractor is required to accomplish due to unsatisfactory performance or nonperformance in accordance with the stated quality and level of effort specified in the contract. Rework is performed at no additional cost to the Government.
H. ESR. Vendor Engineering Service Report. A documentation of services rendered for each incidence of work performance under the terms and conditions of the contract.
I. Acronyms. Commonly used acronyms are listed below
| FSE: | Field Service Engineer | |
| AQL: | Acceptable Quality Level | |
| IAW: | In Accordance With | |
| QA: | Quality Assurance | |
| QC: | Quality Control | |
| WS: | Performance Work Statement | |
| VA: | VA Medical Center | |
| CO: | Contracting Officer | |
| COTR: | Contracting Officer’s Technical Representative |
FES: Facilities and Engineering Service
A. The Contractor will contact the COR to schedule a PM at least seven (7) calendar days prior to the proposed date. Schedule changes required by the Government after approval shall be made at no additional cost if notice is provided to the Contractor five (5) calendar days or more prior to the scheduled date of accomplishment.
B. All inspection work must be coordinated through the COR:
Vincent Butler Plumbing Supervisor Facilities and Engineering Service 10 North Greene Street Baltimore, Maryland 21201 Telephone: (410) 605-7000 extension 56044
V. CONTRACTOR PERSONNEL
A. Personnel Experience. All work shall be performed by competent mechanics, experienced and qualified to work on the specific makes and models of equipment listed in this contract. The Contractor shall submit to and for the approval of the Contracting Officer, certification, and a list of credentials of the approved mechanics. Personnel shall have a minimum of three (3) years recent experience related to this work. The contractor must provide a list of three (3) reference contacts that have been provided service on similar or identical equipment. The contractor must provide authenticated factory training certificates or credentials (or acceptable substitute as approved by the COTR) for any personnel who are working on any VA equipment. The VA specifically reserves the right to reject any of the contractor’s personnel and refuse them permission to work on VA equipment.
B. Conduct of Personnel. The Contractor shall ensure that his personnel always present a professional appearance and that their conduct shall not reflect discredit upon this facility or the Department of Veterans Affairs. The Contractor shall remove from the job site any employee for reasons of misconduct or security. The removal from the job site of such a person shall not relieve the Contractor of the requirement to provide sufficient personnel to perform adequate and timely service. All employees shall be legal residents of the United States and be able to understand, speak, read and write the English language.
C. Identification of Employees.: The Contractor shall within 10 calendar days before beginning performance of work provide the Contracting Officer a list of all employees who will perform under this contract. The list shall include the full name, and work assignment of each employee. The Contractor shall notify the Contracting Officer in writing of any addition, deletion or change in work assignment within 10 days of such change. Each of the Contractor's employees shall conspicuously display on their person a badge provided by the Contractor that shall include the full name of the employee, the name under which the Contractor is doing business and a badge serial number.
VI. HOURS OF OPERATION
A. Normal Duty Hours. The Contractor shall have employees available Monday through Friday, except legal public holidays at the times specified to perform routine work and inspections. All work will be performed between the hours of 7:00a.m. and 4:30p.m. on the prearranged dates.
B. Federal Holidays. Federal Holidays observed by the VA are:
New Year’s Day; Martin Luther King Day; President’s Day; Memorial Day; Independence Day; Labor Day; Columbus Day; Veterans Day; Thanksgiving Day; and Christmas.
VII. CONTRACTOR QUALITY CONTROL
The Contractor shall establish and maintain a Quality Control Program that ensures that all requirements of the contract are provided as specified.
VIII. INSPECTION AND ACCEPTANCE
A. Final inspection and acceptance by the Government shall be made at the site of each system. However, final inspection and acceptance do not preclude the Government's right to inspect completed work prior to shipment from the Contractor's shop nor does it waive any rights of the Government.
B. Unsatisfactory service will be reported in writing by the CO to the Contractor.
C. Telephone Answering Service: The Contractor shall maintain, at his own expense, a dedicated (tie-line) toll-free telephone answering service for the exclusive use in the performance of this contract. This answering service shall be monitored during normal work hours as identified in the specifications.
D. Radio Dispatch System: It is recommended but not mandatory that the Contractor utilizes a radio dispatch system for directing and dispatching personnel in response to maintenance service calls. In the event the use of radio dispatch is elected for use; it shall be the Contractors responsibility to obtain all permits, licenses, frequency allocations and antennas, all accessories necessary for send or receive operation at no additional cost to the Government. An expanded radio system could possibly be utilized in conjunction with or instead of the telephone answering service described in the paragraph above.
IX. REMOVAL AND/OR DISPOSAL
A. Removing Government-Owned Material: All property removed remains the property of the U.S. Government and shall be returned by the Contractor to a place of storage as designated by the CO or COTR.
B. Salvage: Items received by the Contractor that are non-repairable because of condition, or declared unfit for economical rehabilitation by the Contractor, shall be returned to the Government. All salvage remaining in the Contractor's shop shall remain Government property and may be used for repair of any Government-owned equipment when released by the CO. The Contractor shall be required to maintain an accountable record of inventory upon completion of the maintenance contract.
C. Inventories shall not be disposed of by the Contractor without inspection and written approval of the CO. Salvaged parts used in the repair of any government owned equipment shall be treated by the Contractor as Government furnished material and reflected as same on Contractor's invoices when submitted for payment. All salvage in the possession of the Contractor, upon expiration of the contract, will be returned to the Government within thirty (30) days after such expiration.
X. FIRE PREVENTION AND PROTECTION
The Contractor shall fully acquaint himself and his personnel with the location of fire equipment before work, take all prudent measures to minimize fire hazards that result from work, complies with all ordering agency fire and safety regulations.
XI. ENERGY CONSERVATION
The Contractor is required to comply with all energy conservation regulations and instructions that are applicable to Government-owned facilities including but not limited to thermostat settings.
XII.CLEANING UP
The Contractor shall clean up after work, leaving each area where work is performed, neat and clean. All containers, trash and debris for which he is responsible shall be removed.
XIII. HAZARDOUS CONDITIONS
During performing work under this contract, should the Contractor find serious or hazardous conditions existing with or in any of the equipment the Contractor shall secure the equipment and immediately notify the COTR.
XIV.CLEANLINESS
The area immediately around the equipment provided for the Contractor’s use shall be kept in a clean and orderly condition. Trash and waste material shall not be permitted to accumulate but shall be removed by the Contractor’s employees.
SERVICE MANUALS
The VA shall not provide service manuals or service diagnostic software to the contractor. The contractor shall obtain, have on file, and make available to its FSEs all operational and technical documentation, (such as: operational and service manuals, schematics, and parts lists), which are necessary to meet the performance requirements of this contract. The location and listing of the service data manuals, by name, and/or the manuals themselves shall be provided to the CO upon request.
XV. INSURANCE
A. Worker compensation and employer’s liability. Contractor and any subcontractor covered under this contract are required to comply with applicable Federal and State Worker’s Compensation and occupational disease statutes.
B. General Liability. Contractor and any subcontractor covered under this contract are required to have Bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
C. Property Damage Liability. Contractor and any subcontractor covered under this contract are to have Property Damage Liability insurance coverage of at least $500,000.
D. Contractor shall provide proof of liability insurance within five (5) days after contract award.
XVI. SMOKING POLICY
Smoking is prohibited inside all buildings except in designated areas.
XVII. BILLING AND PAYMENT
A. Each invoice shall contain the documentation required by this contract. The invoices shall be itemized to contain the equipment’s identifier. When parts are furnished by the Government, they shall be itemized on Contractor's invoice at no-cost and indicated as Government-furnished parts.
B. Contractor will forward invoices to the following address:
OB10 as per contract Austin, TX.
C. Payment. Payment will be made 30 days in arrears upon receipt of properly prepared invoice. Invoice must contain the contract number and the appropriation number.
XVIII. PRICING SUBMITTAL
The annual pricing of the contract should be itemized by the bidders to reflect a cost per unit PM.
XIX. VENDOR REQUIREMENTS
1. The contractor must employ mechanics and technicians that are trained in the applicable codes, standards, and manufacturer requirements for water treatment and testing services. Supervision must be by a professional engineer.
2. The contractor must have at least 5 years experience satisfactorily performing such maintenance on comparable units, equipment, or systems.
3. The contractor must have sufficient supplies, tools, and equipment to perform all requirements of this contract.
File details come from the government source that posted it. Updated .