This document contains responses to a pre-bid request for information (RFI) related to a federal construction contract solicitation. The solicitation is for renovations to Building 14 at the Loch Raven Veterans Affairs Medical Center to create new prosthetics facilities. The pre-bid RFI responses clarify dates from the solicitation form, confirming the site visit will take place on December 18, 2023 at 10:00 AM and RFI responses are due by December 26, 2023 at 10:00 AM. Bids must be received electronically by the contracting officer at the provided email by January 18, 2024 at 2:00 PM. The solicitation number is 36C24524B0006 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5 for the Y1DA--512-22-208 Loch Raven Building 14 Prosthetics Renovation project.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24524B0006 Loch Raven Building 14 Prosthetics Construction Pre-Bid

Request for Information

RFI #

Specifications & Drawings Reference Request Response

1 NA

On the SF-1442 cover, it cites the site visit date of Dec. 18, and the due date for pre-bid RFI’s as Dec. 18, both at the same time.

A site visit will occur on 12/18/2023 at 10:00 AM Building 14 Loch Raven VAMC.

Pre-Bid RFI's are due 12/26/2023 @ 10:00

AM

2 NA

In Item 10 of the SF-1442, it cites the bid due date as Jan. 8 with hard copies of bonds due by Jan. 18. However, Item 13a only states Jan. 18 as the bid due date.

I believe that both of these items are correctly stated on Page 29 of the solicitation body, but not on the SF-1442.

All bids must be received electronically by the Contracting Officer at derrick.mincer@va.gov by Thursday January 18, 2024 @ 2:00 pm

Correct, the SF-1442 has an error, Page 29 in the IFB document list all dates and times correctly.