Amendment 1 - Consolidated Questions - Clarifications.pdf

PDF 92 KB Posted

Attached to
VAPHS Bagged Ice Melt & Bulk Rock Salt
Solicitation number
36C24427Q0035
Issued by

About this file

This is a Questions and Answers (Q&A) document for a federal contract solicitation related to the procurement of de-icing materials—specifically bulk sodium chloride (rock salt) and bagged ice melt products—for the Virginia-Maryland Regional College of Veterinary Medicine (VAPHS).

The procurement involves firm quantities of 350 tons of bulk salt (CLIN 0001) and 1,764 bags of ice melt (CLIN 0002), with delivery to Building 53. The bulk salt must be effective to -10°F and meet specified water content requirements; the bagged ice melt must be effective to -20°F with no brand name restriction. The salt will be delivered in two separate tranches (175 tons in December 2026 and 175 tons in mid-January 2027), with the Government issuing separate delivery requests for each requiring 7-day delivery from order placement. The bagged ice melt will be delivered in two separate shipments. Unit prices should be quoted per 50-pound bag and per ton, delivered and offloaded at Building 53, with each bulk salt truckload invoice to state the tonnage delivered. The contractor may submit separate invoices after Government inspection and acceptance of each shipment. Regarding eligibility, FAR 52.219-33 (Nonmanufacturer Rule) applies to the acquisition; however, FAR 52.219-14 (Limitations on Subcontracting) does not apply, permitting subcontracting of delivery and offloading services. The contractor must take ownership of products consistent with industry practice. For product documentation, bidders should reference the Statement of Need (SON) and solicitation page 14 for origin and manufacturer requirements. Further details on salt bin capacity, site logistics, equipment availability, offloading responsibilities, insurance coverage minimums, and pricing terms are contained in the amended SON.

View the file

Other files

File Type Posted
Amendment 1 - Updated Statement of Need.pdf PDF
36C24427Q0035.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Eligibility and Subcontracting

Q1. Does the nonmanufacturer rule (FAR 52.219-33) apply to this acquisition given its estimated value, and does the exception at 13 CFR 121.406(c) apply? May a small business nonmanufacturer supply bagged ice melt and bulk salt produced by an other-than-small manufacturer, and is a class waiver available for NAICS 325998 / PSC 6810? If no small business manufacturer can supply the 350 tons of bulk salt, is a waiver available?

Answer: The nonmanufacturer rule (FAR 52.219-33) is applicable.

52.219-33 Nonmanufacturer Rule

(a) Definitions. As used in this clause—

Manufacturer means the concern that transforms raw materials, miscellaneous parts, or components into the end item. Concerns that only minimally alter the item being procured do not qualify as manufacturers of the end item. Concerns that add substances, parts, or components to an existing end item to modify its performance will not be considered the end item manufacturer, where those identical modifications can be performed by and are available from the manufacturer of the existing end item.

Nonmanufacturer means a concern, including a supplier, that provides an end item it did not manufacture, process, or produce.

(b) Applicability.

(1) This clause does not apply to contracts awarded pursuant to the unrestricted portion of a partial set-aside or to a contractor that is the manufacturer of the product or end item.

(2) This clause applies to—

(i)Contracts that have been awarded pursuant to a set-aside, in total or in part, for any of the small business concerns identified in 19.000(a)(3);

(ii)Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;

(iii)Orders expected to exceed the simplified acquisition threshold and that are—

(A)Set aside for small business under multiple-award contracts, as described in 8.405- 5 and 16.505(b)(2)(i)(F); or https://www.acquisition.gov/far/19.000#FAR_19_000 https://www.acquisition.gov/far/subpart-19.8#FAR_Subpart_19_8 https://www.acquisition.gov/far/subpart-19.13#FAR_Subpart_19_13 https://www.acquisition.gov/far/subpart-19.14#FAR_Subpart_19_14 https://www.acquisition.gov/far/subpart-19.15#FAR_Subpart_19_15 https://www.acquisition.gov/far/8.405-5#FAR_8_405_5 https://www.acquisition.gov/far/8.405-5#FAR_8_405_5 https://www.acquisition.gov/far/16.505#FAR_16_505

(B)Issued directly to a small business concern under multiple-award contracts as described in 19.504(c)(1)(ii);

(iv)Orders, regardless of dollar value, that are—

(A)Set aside in accordance with subparts 19.8, 19.13, 19.14, and 19.15 under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F); or

(B)Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, and 19.15 under multiple-award contracts as described in 19.504(c)(1)(ii); and

(v)Contracts using the HUBZone price evaluation preference to award to a HUBZone concern unless the Contractor waived the evaluation preference.

(c) Requirements.

(1)The Contractor shall—

(i)Provide an end item that a small business has manufactured, processed, or produced in the United States or its outlying areas; for kit assemblers who are nonmanufacturers, see paragraph (c)(2) of this clause instead;

(ii)Be primarily engaged in the retail or wholesale trade and normally sell the type of item being supplied; and

(iii)Take ownership or possession of the item(s) with its personnel, equipment, or facilities in a manner consistent with industry practice; for example, providing storage, transportation, or delivery.

(2)When the end item being acquired is a kit of supplies, at least 50 percent of the total cost of the components of the kit shall be manufactured, processed, or produced in the United States or its outlying areas by small business concerns.

(End of clause)

Answer:

Refer to page 1 section 10 of the solicitation for set-aside status.

Q2. FAR 52.219-14 (Limitations on Subcontracting) is not listed. May the awardee subcontract delivery and offloading to a large business, and are there limits on subcontracting the supply itself?

https://www.acquisition.gov/far/19.504#FAR_19_504 https://www.acquisition.gov/far/subpart-19.8#FAR_Subpart_19_8 https://www.acquisition.gov/far/subpart-19.13#FAR_Subpart_19_13 https://www.acquisition.gov/far/subpart-19.14#FAR_Subpart_19_14 https://www.acquisition.gov/far/subpart-19.15#FAR_Subpart_19_15 https://www.acquisition.gov/far/8.405-5#FAR_8_405_5 https://www.acquisition.gov/far/16.505#FAR_16_505 https://www.acquisition.gov/far/subpart-19.8#FAR_Subpart_19_8 https://www.acquisition.gov/far/subpart-19.13#FAR_Subpart_19_13 https://www.acquisition.gov/far/subpart-19.14#FAR_Subpart_19_14 https://www.acquisition.gov/far/subpart-19.15#FAR_Subpart_19_15 https://www.acquisition.gov/far/19.504#FAR_19_504

Answer: FAR 52.219-14 (Limitations on Subcontracting) is not applicable.

Q3. Under FAR 52.225-1, what product-origin or manufacturer documentation must accompany the quote for the bulk salt and the bagged ice melt?

Answer: See SON and solicitation page 14.

Product Specifications

Q4. Section B.4 requires bulk sodium chloride to be effective to -10°F, and untreated rock salt has a eutectic temperature of about -6°F. Will the Government accept treated rock salt (sodium chloride pre-treated with magnesium chloride or calcium chloride) under CLIN 0001, or can the -10°F requirement be revised? What test or technical documentation shows -10°F performance? Must the bulk product meet the 1% maximum water content listed on pages 6 and 8?

Answer: See SON and Salient Characteristics on pages 6-8.

Q5. Is an equivalent to Ice Beeter acceptable? Please provide the manufacturer and product details for Ice Beeter, and identify the documentation required to show compliance (product data sheet, composition, safety data sheet, or independent test results for the -20°F and -10°F effectiveness requirements). Is pre-approval of an equivalent product required before quote submission, or is a manufacturer specification sheet sufficient? Is a magnesium chloride blend without calcium magnesium acetate acceptable? Is a beet-derivative requirement applicable?

Answer: Brand name does not matter, as long as the product is effective to -20°F per

SON.

Quantities and Award

Q6. Are the 350 tons of bulk salt and the 1,764 bags of ice melt firm quantities or estimates? Will the bulk salt be ordered as-needed, or is the tonnage guaranteed?

Answer: The quantities are firm.

Q7. Will the Government consider separate awards for the bagged ice melt (CLIN 0002) and the bulk salt (CLIN 0001) if no single offeror can supply both? Will quotes for only one CLIN be considered for award, or must offerors price both?

Answer: See solicitation page 14 – letter H.

Q8. Is the 1,764-bag quantity acceptable as 35 full pallets plus one partial pallet of 14 bags, or should the quoted quantity be adjusted to full pallets only?

Answer: We will accept the pallets as they come. The bagged ice will be delivered in two deliveries each.

Delivery

Q9. Is the bagged ice melt expected as a single delivery? Section B.3 leaves the delivery date blank, so what is the required delivery date or window for the bags?

Answer: No. The bagged ice melt will be delivered in two deliveries. See SON.

Q10. The Statement of Need anticipates 175 tons of salt in December 2026 and 175 tons in mid-January 2027. Will the Government issue separate delivery requests for each tranche?

Does the 7-day delivery requirement apply to each individual request? What advance notice will be provided, and may multiple truckloads be coordinated within each delivery period?

Answer: Yes, the Government will issue separate delivery requests for each tranche.

The Government will give notice to the supplier. See SON.

Q11. Should offerors enter estimated delivery dates in Section B.3 for quotation purposes, with final dates coordinated after award? Alternatively, will VAPHS call off each load with delivery within 7 days of the order?

Answer: Yes, offerors should enter estimated delivery dates for quotation purposes, and final dates will be coordinated with the POC after award. See SON.

Q12. What is the salt bin's capacity? Can the salt bin at Building 53 accommodate a tractor-trailer end-dump or walking-floor delivery of approximately 23 to 25 tons per load?

If there are height, length, or turning limits at the bin, please share them. Will the Government issue call-offs in truckload-sized quantities? Can a standard end-dump tailgate directly into the bin, or is a live-bottom trailer or conveyor needed?

Answer: See amended SON.

Pricing and Invoicing

Q13. Should unit prices be quoted per 50-lb bag and per ton, delivered and offloaded at Building 53 (including freight, pallet delivery, and bulk offloading), or is there a separate line for delivery?

Answer: See Price/Cost Schedule and SON.

Q14. May the contractor submit separate invoices after Government inspection and acceptance of each completed bulk salt shipment?

Answer: Yes, each truckload invoice must state the tonnage on that truck.

Q15. Will the Government require truck scale weigh slips for each bulk salt load? If so, should they accompany the invoice?

Answer: See solicitation/SON - Page 7.

Site Logistics

Q16. What equipment and access does VAPHS provide at Building 53? Will VAPHS staff offload the ice melt pallets with a forklift, or should the contractor deliver with a liftgate or truck-mounted forklift? Is dock access or a forklift available for pallets, and what are the receiving contact and hours? Who is responsible for offloading the bulk salt and the bagged product, and who removes rejected product?

Q17. The Statement of Need requires personal liability and property damage insurance.

What minimum coverage amounts are required?

File details come from the government source that posted it. Updated .