The RFI consists of nine questions and VA answers clarifying project requirements and constraints. Key operational parameters include: the stairwell will be closed during repairs with an alternate exit route provided; Stair Tower 70 will be closed from ground floor to first floor; work scheduling details should reference the Statement of Work; and the building will remain fully occupied during construction requiring infection control measures at Level II per the VHA Infection Control Risk Assessment. Staffing requirements mandate that the project Superintendent be a direct employee of the Prime Contractor; however, one individual may serve multiple roles (Superintendent, SSHO, QCM, and OSHA Competent Person) provided all qualifications and certifications are met. The contractor must be an NTMA member with documented minimum experience in terrazzo repair, including stair tread work—non-NTMA members with terrazzo experience are not acceptable. The grinding, demolition, and terrazzo work will generate dust and debris requiring Level II infection control containment measures including barriers, negative air, and HEPA filtration as detailed in the attached VHA Infection Control Risk Assessment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 Sign In Sheet.pdf | ||
| 36C24426B0008 0002_1.docx | DOCX document | |
| 36C24426B0008 0002.pdf | ||
| Attachment 3 09 66 13_Terrazzo Flooring.pdf | ||
| 36C24426B0008 0001_1.docx | DOCX document | |
| Attachment 2 01 74 19_Construction Waste Management_Rev.pdf | ||
| Attachment 1 01 00 00_General Requirements.pdf | ||
| S06 36C24426B0008 0001.pdf | ||
| S02 36C24426B0008.pdf | ||
| 36C24426B0008_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI
36C24426B0008 Terrazo Step Repair
1. Please advise if the stairwell will be closed during the repair VA Answer-Yes, the stairwell will be closed while repairs are being made. An alternate exit route will be planned and enforced.
2. Is after hours preferred? During the site visit, the stairwell was busy.
VA Answer -Refer to the SOW.
3. Please confirm whether the project Superintendent is required to be a direct employee of the Prime Contractor, or if a qualified subcontractor employee may fulfill this role.
VA Answer -Yes, project superintendent is required to be a direct employee of the Prime Contractor.
4. Please confirm if one individual may serve in multiple roles (Superintendent, SSHO, and/or QCM), provided all qualification and certification requirements are met.
VA Answer -Yes, one individual may serve multiple roles provided all qualification and certifications requirements are met.
5. Can the Superintendent also serve as the OSHA Competent Person for this project if properly qualified?
VA Answer- Yes, the super can fill both roles
6. The project is located within an active, occupied VA facility and stair tower.
a. Please confirm whether work may be bid at off-hours (evenings), instead of normal hours. Also whether temporary shutdown of the stairwell will be permitted to safely complete the terrazzo repairs.
VA Answer -Please refer to the SOW on off hours work. Yes the shutdown of stairwell will be permitted.
7. The building will remain fully occupied during construction and infection control measures are required.
a. Please clarify whether Stair Tower 70 must always remain operational, or if full or partial closures will be permitted during construction activities with proper coordination.
VA Answer -Stair tower will be closed from ground fl to 1st Fl
8. The specification requires an NTMA contractor member with minimum experience and documented terrazzo repair experience.
a. Please confirm if an installer with documented terrazzo repair experience (including stair tread work), but not an NTMA member, would be acceptable.
VA Answer -NTMA contractor member with minimum experience and documented terrazzo repair experience required, must be a NTMA member is only acceptable contractor
9. Given grinding, demolition, and terrazzo work will generate dust and debris:
a. Please confirm the required infection control level/class and whether full containment (barriers, negative air, HEPA filtration) will be required.
VA Answer -Please refer to attached VHA Infection Control Risk Assessment, Its should be a Level II requirement