schedule.docx

DOCX document 219 KB Posted

Attached to
F108--SDVOSB Asbestos/Lead/Mold Abatement Services | NCO 4 Butler VAMC
Solicitation number
36C24424R0064
Issued by

About this file

This document appears to be a pricing schedule for a federal contract opportunity. It includes line items and pricing for various industrial hygiene and abatement services, including:

  • Certified Industrial Hygienist, Professional Industrial Hygienist, and Industrial Hygiene Technician services priced per hour
  • Laboratory analysis of bulk, air, and clearance samples priced per sample
  • Mold and lead testing services priced per sample
  • Drafting and clerical support services priced per hour
  • Final reporting services priced per report

The pricing schedule covers a base period as well as four one-year option periods. The related federal contract opportunity is for asbestos, lead, and mold abatement services at the VA Butler Healthcare facility. The solicitation requires state-licensed abatement contractors using EPA-accredited, state-certified, or state-licensed workers and supervisors. The contractor must provide planning, documentation, permitting, removal, monitoring, inspection, testing, disposal, and other support services to ensure patient, employee, and visitor safety during the abatement work.

View the file

Other files

File Type Posted
36C24424R0064.docx DOCX document
P07.15-4235 REV 26 5 6 24.pdf PDF
36C24424R0064_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICING INFORMATION$

50 HR

Certified Industrial Hygienist (CIH) Contract Period: Base POP Begin:

POP End:

Professional Industrial Hygienist (PIH) Contract Period: Base POP Begin:

POP End:

50 HR

Industrial Hygiene Technician (IHT) Contract Period: Base POP Begin:

POP End:

50 HR

Laboratory Analysis of Bulk Samples (PLM Method) Contract Period: Base POP Begin:

POP End:

80 EA

Laboratory Analysis of Air Samples (PCM Method) Contract Period: Base POP Begin:

POP End:

80 EA

Laborato1y Analysis of Air Clearance Samples (TEM Method) Contract Period: Base POP Begin:

POP End:

75 EA

Mold Bulk Contract Period: Base POP Begin:

POP End:

75 EA

Mold Air Contract Period: Base POP Begin:

POP End:

75 EA

Lead Bulk Contract Period: Base

75 EA

Page24 of 56

POP Begin:

0010
Lead Air
50
EA
$
$

Contract Period: Base

POP Begin:

POP End:

0011
Drafter
50
HR
$
$

Contract Period: Base

POP Begin:

POP End:

0012
Clerical Support
50
HR
$
$

Contract Period: Base

POP Begin:

POP End:

0013
Final Report
5
EA
$
$

Contract Period: Base

POP Begin:

POP End:

1001
Certified Industrial
50
HR
$
$

Hygienist (CIH)

Contract Period: Option 1

POP Begin:

POP End:

1002
Professional Industrial
50
HR
$
$

Hygienist (PIH)

Contract Period: Option l

POP Begin:

POP End:

1003
Industrial Hygiene
50
HR
$
$

Technician (JHT)

Contract Period: Option 1

POP Begin:

POP End:

1004
Laboratory Analysis of
80
EA
$
$

Bulk Samples (PLM

Method)

Contract Period: Option 1

POP Begin:

POP End:

1005
Laboratory Analysis of
80
EA
$
$

Air Samples (PCM

Method)

Contract Period: Option 1

POP Begin:

POP End:

1006
Laboratory Analysis of
75
EA
$
$

Air Clearance Samples

(TEM Method)

Contract Period: Option 1

POP Begin:

POP End:

1007
Mold Bulk
75
EA
$
$

Contract Period: Option 1

POP Begin:

POP End:

1008
Mold Air
75
EA
$
$

Contract Period: Option 1

POP Begin:

POP End:

1009
Lead Bulk
75
EA
$
$

Contract Period: Option 1

POP Begin:

POP End:

1010
Lead Air
50
EA
$
$

Contract Period: Option 1

POP Begin:

POP End:

1011
Drafter
50
HR
$
$

Contract Period: Option 1

POP Begin:

POP End:

1012
Clerical Support
50
HR
$
$1

Contract Period: Option 1

POP Begin:

POP End:

1013
Final Report
5
EA
$
$

Contract Period: Option 1

POP Begin:

POP End:

2001
Certified Industrial
50
HR
$
$

Hygienist (CIH)

Contract Period: Option 2

POP Begin:

POP End:

2002
Professional Industrial Hygienist (PIH)

Contract Period: Option 2

50
HR
$
$

POP Begin:

2003
Industrial Hygiene
50
HR
$
$

Technician (IHT)

Contract Period: Option 2

POP Begin:

POP End:

2004
Laborato1y Analysis of
80
EA
$
$

Bulk Samples (PLM

Method)

Contract Period: Option 2

POP Begin:

POP End:

2005
Laboratory Analysis of
80
EA
$
$

Air Samples (PCM

Method)

Contract Period: Option 2

POP Begin:

POP End:

2006
Laboratory Analysis of
75
EA
$
$

Air Clearance Samples

(TEM Method)

Contract Period: Option 2

POP Begin:

POP End:

2007
Mold Bulk
75
EA
$
$

Contract Period: Option 2

POP Begin:

POP End:

2008
Mold Air
75
EA
$
$

Contract Period: Option 2

POP Begin:

POP End:

2009
Lead Bulk
75
EA
$
$

Contract Period: Option 2

POP Begin:

POP End:

2010
Lead Air
50
EA
$
$

Contract Period: Option 2

POP Begin:

POP End:

2011
Drafter

Contract Period: Option 2 POP Begin:

50
HR
$
$

POP End:

2012
Clerical Support
50HR
$
$

Contract Period: Option 2

POP Begin:

POP End:

2013
Final Report
5 EA
$
$

Contract Period: Option 2

POP Begin:

POP End:

3001
Certified Industrial
50HR
$
$

Hygienist (CIH)

Contract Period: Option 3

POP Begin:

POP End:

3002
Professional Industrial
50HR
$
$

Hygienist (PIH)

Contract Period: Option 3

POP Begin:

POP End:

3003
Industrial Hygiene
50HR
$
$

Technician (IHT)

Contract Period: Option 3

POP Begin:

POP End:

3004
Laboratory Analysis of
80EA
$
$

Bulk Samples (PLM

Method)

Contract Period: Option 3

POP Begin:

POP End:

3005
Laboratory Analysis of Air Samples (PCM Method)

" Contract Period: Option 3 POP Begin:

POP End:

80EA
$
$
3006
Laboratory Analysis of
75EA
$
$

Air Clearance Samples

(TEM Method)

Contract Period: Option 3

POP Begin:

POP End:

3007
Mold Bulk

Contract Period: Option 3

75EA
$
$2

Page 27 of56

POP Begin:

3008
Mold Air
75EA
$
$

Contract Period: Option 3

POP Begin:

POP End:

3009
Lead Bulk
75EA
$
$

Contract Period: Option 3

POP Begin:

POP End:

3010
Lead Air
50EA
$
$

Contract Period: Option 3

POP Begin: 03-01-2021

POP End: 02-28-2022

3011
Drafter
50HR
$
$

Contract Period: Option 3

POP Begin:

POP End:

3012
Clerical Support
50HR
$
$

Contract Period: Option 3

POP Begin:

POP End:

3013
Final Report
5EA
$
$

Contract Period: Option 3

POP Begin:

POP End:

4001
Certified Industrial
5HR
$
$

Hygienist (CIH)

Contract Period: Option 4

POP Begin:

POP End:

4002
Professional Industrial
5HR
$
$

Hygienist (PIH)

Contract Period: Option 4

POP Begin:

POP End:

4003
Industrial Hygiene
50HR
$
$

Technician (IHT)

Contract Period: Option 4

POP Begin:

POP End:

4004
Laboratory Analysis of Bulk Samples (PLM
80EA
$
$

Method)

Contract Period: Option 4

POP Begin:

POP End:

4005
Laboratory Analysis of
80
EA
$
$

Air Samples (PCM

Method)

Contract Period: Option 4

POP Begin:

POP End:

4006
Laboratory Analysis of
75
EA
$
$

Air Clearance Samples

(TEM Method)

Contract Period: Option 4

POP Begin:

POP End:

4007
Mold Bulk
75
EA
$
$

Contract Period: Option 4

POP Begin:

POP End:

4008
Mold Air
75
EA
$
$

Contract Period: Option 4

POP Begin:

POP End:

4009
Lead Bulk
75
EA
$
$

Contract Period: Option 4

POP Begin:

POP End:

4010
Lead Air
50
EA
$
$

Contract Period: Option 4

POP Begin:

POP End:

4011
Drafter
50
HR
$
$

Contract Period: Option 4

POP Begin:

POP Encl:

4012
Clerical Support
50
HR
$
$

Contract Period: Option 4

POP Begin:

POP End:

4013
Final Report
5
EA
$
$

Contract Period: Option 4

POP Begin:

POP End:

Page30 of 56

Abatement Services

Base Year: CLINs 0014 - 0027

ABATEMENTS INCLUDING ALL DISPOSAL COSTS

UNIT

UNIT COST

Removal of Thermal System Insulation (TSI) (<6" O.D.) by full containment, negative pressure enclosure
Linear foot

Removal of Thermal System Insulation (TSI) (>6" O.D.) by full containment, negative pressure enclosure Linear foot

Removal of Thermal System Insulation (TSI) (<6" O.D.) by glove bag technique. (EA= 3' glove bag units)

Each

Removal of Thermal System Insulation (TSI) (>6" O.D.) by glove bag technique. (EA= 3' glove bag units)

Removal of Thermal System Insulation (TSI) fittings (2"-6" nominal) by full containment, negative pressure enclosure
Number

of fittings

Removal of miscellaneous material, with asbestos, lead, or mold with critical barrier enclosure under negative air
Square foot
Removal of miscellaneous material such as pipe enclosures (ceiling and walls) constructed of plaster, brow coat, wire lath and black iron
Square foot
Removal of surface material asbestos contaminated suspended ceiling panels and grid system
Square foot
Removal of miscellaneous material such as asbestos containing tile mastic by portable mechanized machine scraper (Unit= square foot)
Square foot
Chemical Removal
Each
Mobilization
Each
Permit Required Confined Space Requirements
Each
Large Dumpster
Each
Small Dumpster
Each

Page30 of 56

Option Year One: CLINs 1014 - 1027

UNIT COST

Removal of Thermal System Insulation (TSI) (<6" O.D.) by full containment, negative pressure enclosure
Linear foot

Removal of Thermal System Insulation (TSI) (>6" O.D.) by full containment, negative pressure enclosure

Linear foot

Removal of Thermal System Insulation (TSI) (<6" O.D.) by glove bag technique. (EA= 3' glove bag units)

Removal of Thermal System Insulation (TSI) (>6" O.D.) by glove bag technique. (EA= 3' glove bag units)

Removal of Thermal System Insulation (TSI) fittings (2"-6" nominal) by full containment, negative pressure enclosure
Number
Removal of miscellaneous material, with asbestos, lead, or mold with critical barrier enclosure under negative air
Square foot
Removal of miscellaneous material such as pipe enclosures (ceiling and walls) constructed of plaster, brow coat, wire lath and black iron
Square foot
Removal of surface material asbestos contaminated suspended ceiling panels and grid system
Square foot
Removal of miscellaneous material such as asbestos containing tile mastic by portable mechanized machine scraper (Unit= square foot)
Square foot
Chemical Removal
Each
Mobilization
Each
Permit Required Confined Space Requirements
Each
Large Dumpster
Each
Small Dumpster
Each

Option Year Two: CLINs 2014 -2027

UNIT COST

Removal of Thermal System Insulation (TSI) (<6" O.D.) by full containment, negative pressure enclosure
Linear foot

Page32 of 56

Removal of Thermal System Insulation (TSI) (>6" O.D.) by full containment, negative pressure enclosure
Linear foot

Removal of Thermal System Insulation (TSI) (<6" O.D.) by glove bag technique. (EA= 3' glove bag units)

Removal of Thermal System Insulation (TSI) (>6" O.D.) by glove bag technique. (EA= 3' glove bag units)

Removal of Thermal System Insulation (TSI) fittings (2"-6" nominal) by full containment, negative pressure enclosure
Number of fittings
Removal of miscellaneous material, with asbestos, lead, or mold with critical barrier enclosure under negative air
Square foot
Removal of miscellaneous material such as pipe enclosures (ceiling and walls) constructed of plaster, brow coat, wire lath and black iron
Square foot
Removal of surface material asbestos contaminated suspended ceiling panels and grid system
Square foot
Removal of miscellaneous material such as asbestos containing tile mastic by portable mechanized machine scraper (Unit= square foot)
Square foot
Chemical Removal
Each
Mobilization
Each
Permit Required Confined Space Requirements
Each
Large Dumpster
Each
Small Dumpster
Each

Option Year Three: CLINs 3014 -3027

UNIT COST

Removal of Thermal System Insulation (TSI) (<6" O.D.) by full containment, negative pressure enclosure
Linear

foot

Removal of Thermal System Insulation (TSI) (>6" O.D.) by full containment, negative pressure enclosure
Linear foot

Removal of Thermal System Insulation (TSI) (<6" O.D.) by glove bag technique. (EA= 3' glove bag units)

Removal of Thermal System Insulation (TSI) (>6" O.D.) by glove bag Each technique. (EA= 3' glove bag units)

Removal of Thermal System Insulation (TSI) fittings (2"-6" nominal) by full containment, negative pressure enclosure
Number
Removal of miscellaneous material, with asbestos, lead, or mold with critical barrier enclosure under negative air
Square foot
Removal of miscellaneous material such as pipe enclosures (ceiling and walls) constructed of plaster, brow coat, wire lath and black iron
Square foot
Removal of surface material asbestos contaminated suspended ceiling panels and grid system
Square foot
Removal of miscellaneous material such as asbestos containing tile mastic by portable mechanized machine scraper (Unit= square foot)
Square foot
Chemical Removal
Each
Mobilization
Each
Permit Required Confined Space Requirements
Each
Large Dumpster
Each
Small Dumpster
Each

Option Year Four: CLINs 4014 - 4027

UNIT COST

Removal of Thermal System Insulation (TSI) (<6" O.D.) by full containment, negative pressure enclosure
Linear foot
Removal of Thermal System Insulation (TSI) (>6" O.D.) by full containment, negative pressure enclosure
Linear foot

Removal of Thermal System Insulation (TSI) (<6" O.D.) by glove bag technique. (EA= 3' glove bag units)

Removal of Thermal System Insulation (TSI) (>6" O.D.) by glove bag technique. (EA= 3' glove bag units)

Removal of Thermal System Insulation (TSI) fittings (2"-6" nominal) by full containment, negative pressure enclosure
Number
Removal of miscellaneous material, with asbestos, lead, or mold with critical barrier enclosure under negative air
Square foot
Removal of miscellaneous material such as pipe enclosures (ceiling and walls) constructed of plaster, brow coat, wire lath and black iron
Square foot
Removal of surface material asbestos contaminated suspended ceiling panels and grid system
Square foot
Removal of miscellaneous material such as asbestos containing tile mastic by portable mechanized machine scraper (Unit square foot)
Square foot
Chemical Removal
Each
Mobilization
Each
Permit Required Confined Space Requirements
Each
Large Dumpster
Each
Small Dumpster
Each

GRAND TOTAL

image2.png image1.png

File details come from the government source that posted it. Updated .