This document appears to be a pricing schedule for a federal contract opportunity. It includes line items and pricing for various industrial hygiene and abatement services, including:
- Certified Industrial Hygienist, Professional Industrial Hygienist, and Industrial Hygiene Technician services priced per hour
- Laboratory analysis of bulk, air, and clearance samples priced per sample
- Mold and lead testing services priced per sample
- Drafting and clerical support services priced per hour
- Final reporting services priced per report
The pricing schedule covers a base period as well as four one-year option periods. The related federal contract opportunity is for asbestos, lead, and mold abatement services at the VA Butler Healthcare facility. The solicitation requires state-licensed abatement contractors using EPA-accredited, state-certified, or state-licensed workers and supervisors. The contractor must provide planning, documentation, permitting, removal, monitoring, inspection, testing, disposal, and other support services to ensure patient, employee, and visitor safety during the abatement work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24424R0064.docx | DOCX document | |
| P07.15-4235 REV 26 5 6 24.pdf | ||
| 36C24424R0064_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING INFORMATION$
50 HR
Certified Industrial Hygienist (CIH) Contract Period: Base POP Begin:
POP End:
Professional Industrial Hygienist (PIH) Contract Period: Base POP Begin:
POP End:
50 HR
Industrial Hygiene Technician (IHT) Contract Period: Base POP Begin:
POP End:
50 HR
Laboratory Analysis of Bulk Samples (PLM Method) Contract Period: Base POP Begin:
POP End:
80 EA
Laboratory Analysis of Air Samples (PCM Method) Contract Period: Base POP Begin:
POP End:
80 EA
Laborato1y Analysis of Air Clearance Samples (TEM Method) Contract Period: Base POP Begin:
POP End:
75 EA
Mold Bulk Contract Period: Base POP Begin:
POP End:
75 EA
Mold Air Contract Period: Base POP Begin:
POP End:
75 EA
Lead Bulk Contract Period: Base
75 EA
Page24 of 56
POP Begin:
| 0010 |
| Lead Air |
| 50 |
| EA |
| $ |
| $ |
Contract Period: Base
POP Begin:
POP End:
| 0011 |
| Drafter |
| 50 |
| HR |
| $ |
| $ |
Contract Period: Base
POP Begin:
POP End:
| 0012 |
| Clerical Support |
| 50 |
| HR |
| $ |
| $ |
Contract Period: Base
POP Begin:
POP End:
| 0013 |
| Final Report |
| 5 |
| EA |
| $ |
| $ |
Contract Period: Base
POP Begin:
POP End:
| 1001 |
| Certified Industrial |
| 50 |
| HR |
| $ |
| $ |
Hygienist (CIH)
Contract Period: Option 1
POP Begin:
POP End:
| 1002 |
| Professional Industrial |
| 50 |
| HR |
| $ |
| $ |
Hygienist (PIH)
Contract Period: Option l
POP Begin:
POP End:
| 1003 |
| Industrial Hygiene |
| 50 |
| HR |
| $ |
| $ |
Technician (JHT)
Contract Period: Option 1
POP Begin:
POP End:
| 1004 |
| Laboratory Analysis of |
| 80 |
| EA |
| $ |
| $ |
Bulk Samples (PLM
Method)
Contract Period: Option 1
POP Begin:
POP End:
| 1005 |
| Laboratory Analysis of |
| 80 |
| EA |
| $ |
| $ |
Air Samples (PCM
Method)
Contract Period: Option 1
POP Begin:
POP End:
| 1006 |
| Laboratory Analysis of |
| 75 |
| EA |
| $ |
| $ |
Air Clearance Samples
(TEM Method)
Contract Period: Option 1
POP Begin:
POP End:
| 1007 |
| Mold Bulk |
| 75 |
| EA |
| $ |
| $ |
Contract Period: Option 1
POP Begin:
POP End:
| 1008 |
| Mold Air |
| 75 |
| EA |
| $ |
| $ |
Contract Period: Option 1
POP Begin:
POP End:
| 1009 |
| Lead Bulk |
| 75 |
| EA |
| $ |
| $ |
Contract Period: Option 1
POP Begin:
POP End:
| 1010 |
| Lead Air |
| 50 |
| EA |
| $ |
| $ |
Contract Period: Option 1
POP Begin:
POP End:
| 1011 |
| Drafter |
| 50 |
| HR |
| $ |
| $ |
Contract Period: Option 1
POP Begin:
POP End:
| 1012 |
| Clerical Support |
| 50 |
| HR |
| $ |
| $1 |
Contract Period: Option 1
POP Begin:
POP End:
| 1013 |
| Final Report |
| 5 |
| EA |
| $ |
| $ |
Contract Period: Option 1
POP Begin:
POP End:
| 2001 |
| Certified Industrial |
| 50 |
| HR |
| $ |
| $ |
Hygienist (CIH)
Contract Period: Option 2
POP Begin:
POP End:
| 2002 |
| Professional Industrial Hygienist (PIH) |
Contract Period: Option 2
| 50 |
| HR |
| $ |
| $ |
POP Begin:
| 2003 |
| Industrial Hygiene |
| 50 |
| HR |
| $ |
| $ |
Technician (IHT)
Contract Period: Option 2
POP Begin:
POP End:
| 2004 |
| Laborato1y Analysis of |
| 80 |
| EA |
| $ |
| $ |
Bulk Samples (PLM
Method)
Contract Period: Option 2
POP Begin:
POP End:
| 2005 |
| Laboratory Analysis of |
| 80 |
| EA |
| $ |
| $ |
Air Samples (PCM
Method)
Contract Period: Option 2
POP Begin:
POP End:
| 2006 |
| Laboratory Analysis of |
| 75 |
| EA |
| $ |
| $ |
Air Clearance Samples
(TEM Method)
Contract Period: Option 2
POP Begin:
POP End:
| 2007 |
| Mold Bulk |
| 75 |
| EA |
| $ |
| $ |
Contract Period: Option 2
POP Begin:
POP End:
| 2008 |
| Mold Air |
| 75 |
| EA |
| $ |
| $ |
Contract Period: Option 2
POP Begin:
POP End:
| 2009 |
| Lead Bulk |
| 75 |
| EA |
| $ |
| $ |
Contract Period: Option 2
POP Begin:
POP End:
| 2010 |
| Lead Air |
| 50 |
| EA |
| $ |
| $ |
Contract Period: Option 2
POP Begin:
POP End:
| 2011 |
| Drafter |
Contract Period: Option 2 POP Begin:
| 50 |
| HR |
| $ |
| $ |
POP End:
| 2012 | |
| Clerical Support | |
| 50 | HR |
| $ | |
| $ |
Contract Period: Option 2
POP Begin:
POP End:
| 2013 |
| Final Report |
| 5 EA |
| $ |
| $ |
Contract Period: Option 2
POP Begin:
POP End:
| 3001 | |
| Certified Industrial | |
| 50 | HR |
| $ | |
| $ |
Hygienist (CIH)
Contract Period: Option 3
POP Begin:
POP End:
| 3002 | |
| Professional Industrial | |
| 50 | HR |
| $ | |
| $ |
Hygienist (PIH)
Contract Period: Option 3
POP Begin:
POP End:
| 3003 | |
| Industrial Hygiene | |
| 50 | HR |
| $ | |
| $ |
Technician (IHT)
Contract Period: Option 3
POP Begin:
POP End:
| 3004 | |
| Laboratory Analysis of | |
| 80 | EA |
| $ | |
| $ |
Bulk Samples (PLM
Method)
Contract Period: Option 3
POP Begin:
POP End:
| 3005 |
| Laboratory Analysis of Air Samples (PCM Method) |
" Contract Period: Option 3 POP Begin:
POP End:
| 80 | EA |
| $ | |
| $ |
| 3006 | |
| Laboratory Analysis of | |
| 75 | EA |
| $ | |
| $ |
Air Clearance Samples
(TEM Method)
Contract Period: Option 3
POP Begin:
POP End:
| 3007 |
| Mold Bulk |
Contract Period: Option 3
| 75 | EA |
| $ | |
| $2 |
Page 27 of56
POP Begin:
| 3008 | |
| Mold Air | |
| 75 | EA |
| $ | |
| $ |
Contract Period: Option 3
POP Begin:
POP End:
| 3009 | |
| Lead Bulk | |
| 75 | EA |
| $ | |
| $ |
Contract Period: Option 3
POP Begin:
POP End:
| 3010 | |
| Lead Air | |
| 50 | EA |
| $ | |
| $ |
Contract Period: Option 3
POP Begin: 03-01-2021
POP End: 02-28-2022
| 3011 | |
| Drafter | |
| 50 | HR |
| $ | |
| $ |
Contract Period: Option 3
POP Begin:
POP End:
| 3012 | |
| Clerical Support | |
| 50 | HR |
| $ | |
| $ |
Contract Period: Option 3
POP Begin:
POP End:
| 3013 | |
| Final Report | |
| 5 | EA |
| $ | |
| $ |
Contract Period: Option 3
POP Begin:
POP End:
| 4001 | |
| Certified Industrial | |
| 5 | HR |
| $ | |
| $ |
Hygienist (CIH)
Contract Period: Option 4
POP Begin:
POP End:
| 4002 | |
| Professional Industrial | |
| 5 | HR |
| $ | |
| $ |
Hygienist (PIH)
Contract Period: Option 4
POP Begin:
POP End:
| 4003 | |
| Industrial Hygiene | |
| 50 | HR |
| $ | |
| $ |
Technician (IHT)
Contract Period: Option 4
POP Begin:
POP End:
| 4004 | |
| Laboratory Analysis of Bulk Samples (PLM | |
| 80 | EA |
| $ | |
| $ |
Method)
Contract Period: Option 4
POP Begin:
POP End:
| 4005 |
| Laboratory Analysis of |
| 80 |
| EA |
| $ |
| $ |
Air Samples (PCM
Method)
Contract Period: Option 4
POP Begin:
POP End:
| 4006 |
| Laboratory Analysis of |
| 75 |
| EA |
| $ |
| $ |
Air Clearance Samples
(TEM Method)
Contract Period: Option 4
POP Begin:
POP End:
| 4007 |
| Mold Bulk |
| 75 |
| EA |
| $ |
| $ |
Contract Period: Option 4
POP Begin:
POP End:
| 4008 |
| Mold Air |
| 75 |
| EA |
| $ |
| $ |
Contract Period: Option 4
POP Begin:
POP End:
| 4009 |
| Lead Bulk |
| 75 |
| EA |
| $ |
| $ |
Contract Period: Option 4
POP Begin:
POP End:
| 4010 |
| Lead Air |
| 50 |
| EA |
| $ |
| $ |
Contract Period: Option 4
POP Begin:
POP End:
| 4011 |
| Drafter |
| 50 |
| HR |
| $ |
| $ |
Contract Period: Option 4
POP Begin:
POP Encl:
| 4012 |
| Clerical Support |
| 50 |
| HR |
| $ |
| $ |
Contract Period: Option 4
POP Begin:
POP End:
| 4013 |
| Final Report |
| 5 |
| EA |
| $ |
| $ |
Contract Period: Option 4
POP Begin:
POP End:
Page30 of 56
Abatement Services
Base Year: CLINs 0014 - 0027
ABATEMENTS INCLUDING ALL DISPOSAL COSTS
UNIT
UNIT COST
| Removal of Thermal System Insulation (TSI) (<6" O.D.) by full containment, negative pressure enclosure |
| Linear foot |
Removal of Thermal System Insulation (TSI) (>6" O.D.) by full containment, negative pressure enclosure Linear foot
Removal of Thermal System Insulation (TSI) (<6" O.D.) by glove bag technique. (EA= 3' glove bag units)
Each
Removal of Thermal System Insulation (TSI) (>6" O.D.) by glove bag technique. (EA= 3' glove bag units)
| Removal of Thermal System Insulation (TSI) fittings (2"-6" nominal) by full containment, negative pressure enclosure |
| Number |
of fittings
| Removal of miscellaneous material, with asbestos, lead, or mold with critical barrier enclosure under negative air |
| Square foot |
| Removal of miscellaneous material such as pipe enclosures (ceiling and walls) constructed of plaster, brow coat, wire lath and black iron |
| Square foot |
| Removal of surface material asbestos contaminated suspended ceiling panels and grid system |
| Square foot |
| Removal of miscellaneous material such as asbestos containing tile mastic by portable mechanized machine scraper (Unit= square foot) |
| Square foot |
| Chemical Removal |
| Each |
| Mobilization |
| Each |
| Permit Required Confined Space Requirements |
| Each |
| Large Dumpster |
| Each |
| Small Dumpster |
| Each |
Page30 of 56
Option Year One: CLINs 1014 - 1027
UNIT COST
| Removal of Thermal System Insulation (TSI) (<6" O.D.) by full containment, negative pressure enclosure |
| Linear foot |
Removal of Thermal System Insulation (TSI) (>6" O.D.) by full containment, negative pressure enclosure
Linear foot
Removal of Thermal System Insulation (TSI) (<6" O.D.) by glove bag technique. (EA= 3' glove bag units)
Removal of Thermal System Insulation (TSI) (>6" O.D.) by glove bag technique. (EA= 3' glove bag units)
| Removal of Thermal System Insulation (TSI) fittings (2"-6" nominal) by full containment, negative pressure enclosure |
| Number |
| Removal of miscellaneous material, with asbestos, lead, or mold with critical barrier enclosure under negative air |
| Square foot |
| Removal of miscellaneous material such as pipe enclosures (ceiling and walls) constructed of plaster, brow coat, wire lath and black iron |
| Square foot |
| Removal of surface material asbestos contaminated suspended ceiling panels and grid system |
| Square foot |
| Removal of miscellaneous material such as asbestos containing tile mastic by portable mechanized machine scraper (Unit= square foot) |
| Square foot |
| Chemical Removal |
| Each |
| Mobilization |
| Each |
| Permit Required Confined Space Requirements |
| Each |
| Large Dumpster |
| Each |
| Small Dumpster |
| Each |
Option Year Two: CLINs 2014 -2027
UNIT COST
| Removal of Thermal System Insulation (TSI) (<6" O.D.) by full containment, negative pressure enclosure |
| Linear foot |
Page32 of 56
| Removal of Thermal System Insulation (TSI) (>6" O.D.) by full containment, negative pressure enclosure |
| Linear foot |
Removal of Thermal System Insulation (TSI) (<6" O.D.) by glove bag technique. (EA= 3' glove bag units)
Removal of Thermal System Insulation (TSI) (>6" O.D.) by glove bag technique. (EA= 3' glove bag units)
| Removal of Thermal System Insulation (TSI) fittings (2"-6" nominal) by full containment, negative pressure enclosure |
| Number of fittings |
| Removal of miscellaneous material, with asbestos, lead, or mold with critical barrier enclosure under negative air |
| Square foot |
| Removal of miscellaneous material such as pipe enclosures (ceiling and walls) constructed of plaster, brow coat, wire lath and black iron |
| Square foot |
| Removal of surface material asbestos contaminated suspended ceiling panels and grid system |
| Square foot |
| Removal of miscellaneous material such as asbestos containing tile mastic by portable mechanized machine scraper (Unit= square foot) |
| Square foot |
| Chemical Removal |
| Each |
| Mobilization |
| Each |
| Permit Required Confined Space Requirements |
| Each |
| Large Dumpster |
| Each |
| Small Dumpster |
| Each |
Option Year Three: CLINs 3014 -3027
UNIT COST
| Removal of Thermal System Insulation (TSI) (<6" O.D.) by full containment, negative pressure enclosure |
| Linear |
foot
| Removal of Thermal System Insulation (TSI) (>6" O.D.) by full containment, negative pressure enclosure |
| Linear foot |
Removal of Thermal System Insulation (TSI) (<6" O.D.) by glove bag technique. (EA= 3' glove bag units)
Removal of Thermal System Insulation (TSI) (>6" O.D.) by glove bag Each technique. (EA= 3' glove bag units)
| Removal of Thermal System Insulation (TSI) fittings (2"-6" nominal) by full containment, negative pressure enclosure |
| Number |
| Removal of miscellaneous material, with asbestos, lead, or mold with critical barrier enclosure under negative air |
| Square foot |
| Removal of miscellaneous material such as pipe enclosures (ceiling and walls) constructed of plaster, brow coat, wire lath and black iron |
| Square foot |
| Removal of surface material asbestos contaminated suspended ceiling panels and grid system |
| Square foot |
| Removal of miscellaneous material such as asbestos containing tile mastic by portable mechanized machine scraper (Unit= square foot) |
| Square foot |
| Chemical Removal |
| Each |
| Mobilization |
| Each |
| Permit Required Confined Space Requirements |
| Each |
| Large Dumpster |
| Each |
| Small Dumpster |
| Each |
Option Year Four: CLINs 4014 - 4027
UNIT COST
| Removal of Thermal System Insulation (TSI) (<6" O.D.) by full containment, negative pressure enclosure |
| Linear foot |
| Removal of Thermal System Insulation (TSI) (>6" O.D.) by full containment, negative pressure enclosure |
| Linear foot |
Removal of Thermal System Insulation (TSI) (<6" O.D.) by glove bag technique. (EA= 3' glove bag units)
Removal of Thermal System Insulation (TSI) (>6" O.D.) by glove bag technique. (EA= 3' glove bag units)
| Removal of Thermal System Insulation (TSI) fittings (2"-6" nominal) by full containment, negative pressure enclosure |
| Number |
| Removal of miscellaneous material, with asbestos, lead, or mold with critical barrier enclosure under negative air |
| Square foot |
| Removal of miscellaneous material such as pipe enclosures (ceiling and walls) constructed of plaster, brow coat, wire lath and black iron |
| Square foot |
| Removal of surface material asbestos contaminated suspended ceiling panels and grid system |
| Square foot |
| Removal of miscellaneous material such as asbestos containing tile mastic by portable mechanized machine scraper (Unit square foot) |
| Square foot |
| Chemical Removal |
| Each |
| Mobilization |
| Each |
| Permit Required Confined Space Requirements |
| Each |
| Large Dumpster |
| Each |
| Small Dumpster |
| Each |
GRAND TOTAL