Question and Answer - 36C24424Q0973.docx
DOCX document 15 KB Posted
- Attached to
- H146--AT RISK | Water System Testing and Maintenance | Water Management Program Services | (VA-24-00094196)
- Solicitation number
- 36C24424Q0973
About this file
This document is a Question and Answer related to Solicitation Number 36C24424Q0973, a Request for Quote (RFQ) for a five-year, firm-fixed-price Indefinite Delivery - Indefinite Quantity (IDIQ) contract for Water Management Program Services at the Pittsburgh VA Medical Center. The contract does not require the contractor to conduct regular sampling, but rather to oversee the facility's collection of samples and provide a database for tracking results. Any issues with equipment or the water system identified during the initial survey will be the responsibility of the facility to address, not the contractor. The solicitation is set aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB), and the contracting office is the Department of Veterans Affairs Regional Procurement Office East Network Contracting Office 4.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24424Q0973 0001.docx | DOCX document | |
| Combined Synopsis - 36C24424Q0973 - Water Management Prog.docx | DOCX document | |
| Attachment B - Past Performance Questionnaire.docx | DOCX document | |
| Attachment D - Wage Determination.pdf | ||
| 36C24424Q0973.docx | DOCX document | |
| Attachment C - Price Schedule.docx | DOCX document | |
| Attachment A - Statement of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and Answer
1. Are you looking for the contractor to conduct regular (daily, monthly, quarterly, etc.) sampling as part of this solicitation, or to oversee the collection of these samples by facility personnel?
No sampling is required. However observation of collection would be included in survey of of the SPS water system as referenced in 2.1 in the SOW. The contractor will provide a database for the facility to log and track testing results as referenced in 3.19.5
2. Following the initial survey, should existing equipment be found in need of repair or replacement to comply with AAMI ST108 standards, will this work fall under this contract?
No, when issues with equipment or parts of the water system are identified it will be the responsibility of the facility to fix or address these issues.