Pricing sheetRevised.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- J041--Chiller Maintenance Wilkes Barre VAMC
- Solicitation number
- 36C24423Q0009
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24423Q0009 0001_1.docx | DOCX document | |
| 36C24423Q0009 0001.docx | DOCX document | |
| 36C24423Q0009_1.docx | DOCX document | |
| Pricing sheet.xlsx | XLSX spreadsheet | |
| Attachment B WD 2015-4239.pdf | ||
| Attachment C Clauses_Provisions_quote submission_evaluation0009.docx | DOCX document | |
| Attachment 1 Site Visit Information.docx | DOCX document | |
| Attachment A Statement of Work Chiller Maintenance9-27-2022.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Item Number | SLIN | Description | Contract Period | Pop Begin | Pop End | Quantity | Unit of Measure | Unit Price | Total | Total |
| 0001 | Main Chiller Plant | Base | 11/17/22 | 11/16/23 | 0 | MO | $0.00 | $0.00 | ||
| 0001 | AA | Main Chiller Plant Chiller 1 750 Ton Water Cooled Centrifugal Chiller | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0001 | AB | Main Chiller Plant Chiller 2 750 Ton Water Cooled Centrifugal Chiller | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0001 | AC | Main Chiller Plant Cooling Tower 1 1000 Ton Updraft Cooling Tower | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0001 | AD | Main Chiller Plant Cooling Tower 2 1000 Ton Updraft Cooling Tower | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0001 | AE | Main Chiller Plant Primary pump 1 | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0001 | AF | Main Chiller Plant Primary pump 2 | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0001 | AG | Main Chiller Plant Primary pump 3 | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0001 | AH | Main Chiller Plant Secondary pump 1-4 | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0001 | AI | Main Chiller Plant Secondary pump 2-5 | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0001 | AJ | Main Chiller Plant Secondary pump 2-6 | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0001 | AK | Main Chiller Plant Condenser water pump 1 | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0001 | AL | Main Chiller Plant Condenser water pump 2 | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0002 | CLC Chiller Plant | Base | 11/17/22 | 11/16/23 | $0.00 | |||||
| 0002 | AA | CLC Chiller Plant 90 Ton Screw Chiller 1 | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0002 | AB | CLC Chiller Plant 90 Ton Screw Chiller 2 | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0002 | AC | CLC Chiller Plant Cooling Tower 1 100 Ton Updraft Cooling Tower | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0002 | AD | CLC Chiller Plant Cooling Tower 2 100 Ton Updraft Cooling Tower | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0002 | AE | CLC Chiller Plant Chiller 3 100 Ton Screw Chiller/Air Cooled VFD Screw Chiller | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | |
| 0003 | Operating Room Back-Up Chiller | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | ||
| 0004 | Kitchen Chiller | Base | 11/17/22 | 11/16/23 | 12 | MO | $0.00 | $0.00 | ||
| 0005 | Emergency Services as outlined in 4.2 Rate for OT: Hourly Rate for Weekend: Hourly Rate for Holiday: | Base | 11/17/22 | 11/16/23 | 1 | LT | $0.00 | $0.00 | ||
| 0006 | Repair Services as outlined in 4.3 Hourly Rate for Regular time: | Base | 11/17/22 | 11/16/23 | 1 | LT | $0.00 | $0.00 | ||
| 1001 | Main Chiller Plant | Base | 11/17/23 | 11/16/24 | 0 | MO | $0.00 | $0.00 | ||
| 1001 | AA | Main Chiller Plant Chiller 1 750 Ton Water Cooled Centrifugal Chiller | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1001 | AB | Main Chiller Plant Chiller 2 750 Ton Water Cooled Centrifugal Chiller | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1001 | AC | Main Chiller Plant Cooling Tower 1 1000 Ton Updraft Cooling Tower | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1001 | AD | Main Chiller Plant Cooling Tower 2 1000 Ton Updraft Cooling Tower | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1001 | AE | Main Chiller Plant Primary pump 1 | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1001 | AF | Main Chiller Plant Primary pump 2 | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1001 | AG | Main Chiller Plant Primary pump 3 | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1001 | AH | Main Chiller Plant Secondary pump 1-4 | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1001 | AI | Main Chiller Plant Secondary pump 2-5 | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1001 | AJ | Main Chiller Plant Secondary pump 2-6 | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1001 | AK | Main Chiller Plant Condenser water pump 1 | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1001 | AL | Main Chiller Plant Condenser water pump 2 | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1002 | CLC Chiller Plant | Base | 11/17/23 | 11/16/24 | $0.00 | |||||
| 1002 | AA | CLC Chiller Plant 90 Ton Screw Chiller 1 | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1002 | AB | CLC Chiller Plant 90 Ton Screw Chiller 2 | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1002 | AC | CLC Chiller Plant Cooling Tower 1 100 Ton Updraft Cooling Tower | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1002 | AD | CLC Chiller Plant Cooling Tower 2 100 Ton Updraft Cooling Tower | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1002 | AE | CLC Chiller Plant Chiller 3 100 Ton Screw Chiller/Air Cooled VFD Screw Chiller | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | |
| 1003 | Operating Room Back-Up Chiller | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | ||
| 1004 | Kitchen Chiller | Base | 11/17/23 | 11/16/24 | 12 | MO | $0.00 | $0.00 | ||
| 1005 | Emergency Services as outlined in 4.2 Rate for OT: Hourly Rate for Weekend: Hourly Rate for Holiday: | Base | 11/17/23 | 11/16/24 | 1 | LT | $0.00 | $0.00 | ||
| 1006 | Repair Services as outlined in 4.3 Hourly Rate for Regular time: | Base | 11/17/23 | 11/16/24 | 1 | LT | $0.00 | $0.00 | ||
| 2001 | Main Chiller Plant | Base | 11/17/24 | 11/16/25 | 0 | MO | $0.00 | $0.00 | ||
| 2001 | AA | Main Chiller Plant Chiller 1 750 Ton Water Cooled Centrifugal Chiller | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2001 | AB | Main Chiller Plant Chiller 2 750 Ton Water Cooled Centrifugal Chiller | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2001 | AC | Main Chiller Plant Cooling Tower 1 1000 Ton Updraft Cooling Tower | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2001 | AD | Main Chiller Plant Cooling Tower 2 1000 Ton Updraft Cooling Tower | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2001 | AE | Main Chiller Plant Primary pump 1 | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2001 | AF | Main Chiller Plant Primary pump 2 | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2001 | AG | Main Chiller Plant Primary pump 3 | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2001 | AH | Main Chiller Plant Secondary pump 1-4 | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2001 | AI | Main Chiller Plant Secondary pump 2-5 | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2001 | AJ | Main Chiller Plant Secondary pump 2-6 | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2001 | AK | Main Chiller Plant Condenser water pump 1 | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2001 | AL | Main Chiller Plant Condenser water pump 2 | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2002 | CLC Chiller Plant | Base | 11/17/24 | 11/16/25 | $0.00 | |||||
| 2002 | AA | CLC Chiller Plant 90 Ton Screw Chiller 1 | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2002 | AB | CLC Chiller Plant 90 Ton Screw Chiller 2 | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2002 | AC | CLC Chiller Plant Cooling Tower 1 100 Ton Updraft Cooling Tower | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2002 | AD | CLC Chiller Plant Cooling Tower 2 100 Ton Updraft Cooling Tower | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2002 | AE | CLC Chiller Plant Chiller 3 100 Ton Screw Chiller/Air Cooled VFD Screw Chiller | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | |
| 2003 | Operating Room Back-Up Chiller | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | ||
| 2004 | Kitchen Chiller | Base | 11/17/24 | 11/16/25 | 12 | MO | $0.00 | $0.00 | ||
| 2005 | Emergency Services as outlined in 4.2 Rate for OT: Hourly Rate for Weekend: Hourly Rate for Holiday: | Base | 11/17/24 | 11/16/25 | 1 | LT | $0.00 | $0.00 | ||
| 2006 | Repair Services as outlined in 4.3 Hourly Rate for Regular time: | Base | 11/17/24 | 11/16/25 | 1 | LT | $0.00 | $0.00 | ||
| 3001 | Main Chiller Plant | Base | 11/17/25 | 11/16/26 | 0 | MO | $0.00 | $0.00 | ||
| 3001 | AA | Main Chiller Plant Chiller 1 750 Ton Water Cooled Centrifugal Chiller | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3001 | AB | Main Chiller Plant Chiller 2 750 Ton Water Cooled Centrifugal Chiller | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3001 | AC | Main Chiller Plant Cooling Tower 1 1000 Ton Updraft Cooling Tower | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3001 | AD | Main Chiller Plant Cooling Tower 2 1000 Ton Updraft Cooling Tower | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3001 | AE | Main Chiller Plant Primary pump 1 | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3001 | AF | Main Chiller Plant Primary pump 2 | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3001 | AG | Main Chiller Plant Primary pump 3 | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3001 | AH | Main Chiller Plant Secondary pump 1-4 | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3001 | AI | Main Chiller Plant Secondary pump 2-5 | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3001 | AJ | Main Chiller Plant Secondary pump 2-6 | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3001 | AK | Main Chiller Plant Condenser water pump 1 | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3001 | AL | Main Chiller Plant Condenser water pump 2 | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3002 | CLC Chiller Plant | Base | 11/17/25 | 11/16/26 | $0.00 | |||||
| 3002 | AA | CLC Chiller Plant 90 Ton Screw Chiller 1 | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3002 | AB | CLC Chiller Plant 90 Ton Screw Chiller 2 | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3002 | AC | CLC Chiller Plant Cooling Tower 1 100 Ton Updraft Cooling Tower | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3002 | AD | CLC Chiller Plant Cooling Tower 2 100 Ton Updraft Cooling Tower | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3002 | AE | CLC Chiller Plant Chiller 3 100 Ton Screw Chiller/Air Cooled VFD Screw Chiller | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | |
| 3003 | Operating Room Back-Up Chiller | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | ||
| 3004 | Kitchen Chiller | Base | 11/17/25 | 11/16/26 | 12 | MO | $0.00 | $0.00 | ||
| 3005 | Emergency Services as outlined in 4.2 Rate for OT: Hourly Rate for Weekend: Hourly Rate for Holiday: | Base | 11/17/25 | 11/16/26 | 1 | LT | $0.00 | $0.00 | ||
| 3006 | Repair Services as outlined in 4.3 Hourly Rate for Regular time: | Base | 11/17/25 | 11/16/26 | 1 | LT | $0.00 | $0.00 | ||
| 4001 | Main Chiller Plant | Base | 11/17/26 | 11/16/27 | 0 | MO | $0.00 | $0.00 | ||
| 4001 | AA | Main Chiller Plant Chiller 1 750 Ton Water Cooled Centrifugal Chiller | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4001 | AB | Main Chiller Plant Chiller 2 750 Ton Water Cooled Centrifugal Chiller | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4001 | AC | Main Chiller Plant Cooling Tower 1 1000 Ton Updraft Cooling Tower | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4001 | AD | Main Chiller Plant Cooling Tower 2 1000 Ton Updraft Cooling Tower | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4001 | AE | Main Chiller Plant Primary pump 1 | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4001 | AF | Main Chiller Plant Primary pump 2 | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4001 | AG | Main Chiller Plant Primary pump 3 | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4001 | AH | Main Chiller Plant Secondary pump 1-4 | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4001 | AI | Main Chiller Plant Secondary pump 2-5 | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4001 | AJ | Main Chiller Plant Secondary pump 2-6 | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4001 | AK | Main Chiller Plant Condenser water pump 1 | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4001 | AL | Main Chiller Plant Condenser water pump 2 | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4002 | CLC Chiller Plant | Base | 11/17/26 | 11/16/27 | $0.00 | |||||
| 4002 | AA | CLC Chiller Plant 90 Ton Screw Chiller 1 | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4002 | AB | CLC Chiller Plant 90 Ton Screw Chiller 2 | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4002 | AC | CLC Chiller Plant Cooling Tower 1 100 Ton Updraft Cooling Tower | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4002 | AD | CLC Chiller Plant Cooling Tower 2 100 Ton Updraft Cooling Tower | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4002 | AE | CLC Chiller Plant Chiller 3 100 Ton Screw Chiller/Air Cooled VFD Screw Chiller | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | |
| 4003 | Operating Room Back-Up Chiller | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | ||
| 4004 | Kitchen Chiller | Base | 11/17/26 | 11/16/27 | 12 | MO | $0.00 | $0.00 | ||
| 4005 | Emergency Services as outlined in 4.2 Rate for OT: Hourly Rate for Weekend: Hourly Rate for Holiday: | Base | 11/17/26 | 11/16/27 | 1 | LT | $0.00 | $0.00 | ||
| 4006 | Repair Services as outlined in 4.3 Hourly Rate for Regular time: | Base | 11/17/26 | 11/16/27 | 1 | LT | $0.00 | $0.00 | ||
| $0.00 |
File details come from the government source that posted it. Updated .