Attachment 2 Questions and Answers.pdf
PDF 101 KB Posted
- Attached to
- J045--Duct Cleaning Service - Butler VAMC
- Solicitation number
- 36C24422Q0250
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 Drawings Duct Cleaning Mark Up.pdf | ||
| 36C24422Q0250 0001.pdf | ||
| 36C24422Q0250 0001.docx | DOCX document | |
| Attachment 3 Pricing Schedule Attachment.pdf | ||
| 36C24422Q0250_1.docx | DOCX document | |
| Attachment 4 SCA Wage Determination 2015-4235 Rev 18 Dtd 12-27-2021.pdf | ||
| Attachment 1 Drawings.pdf | ||
| Attachment 2 Applicable VA Memorandum.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1: Questions and Answers RFQ 36C24422Q0250 AMEND 0001
1. Please provide Square footage of the Buildings in the Bid.
Area Use Building Square
Footage
Building 46
Facility Management
9762 (300 LF of Duct)
Building 48 Fire Station (Living Quarters)
Building 22 Domiciliary 5372
Building 23 Domiciliary 6590
Building 24 Domiciliary 6590
Building 25 Domiciliary 5276
Building 20 CLC 52280
Building 21 Domiciliary (admin)
11955
2. Could the pricing needed to be provided for the other buildings be hourly since there is no data on the other buildings to be cleaned?
Pricing per service will be required. Drawings for all buildings were provided in the solicitation, with the exception of building 46. Approximate duct length is 300 LF for building 46.
3. Please provide the details on the kitchen hood systems to be cleaned – how many hoods and fans are associated with these systems?
There are two hoods each with their own fans.
4. Please confirm hard surfaces (e.g. hard ceilings) are not required to be cut into by contractor.
This is a means and methods question, the response of which depends on the manner of cleaning. VA Butlers response is that all ductwork must be cleaned regardless of the ceiling access type.
5. Please confirm all work can be performed off ladders (e.g. lifts aren’t required).
This is means and methods. Approximate ceiling heights are as follows: Building 20- 11’; Building 21- 8’ 6”; All other buildings 8’.
6. Not all drawings are labeled with the Building numbers as shown in the SOW and pricing sheets, can drawings be labeled with the appropriate building numbers?
Updated drawings have been attached.