Solicitation Amendment 0005 - updated PWS - Windows.docx

DOCX document 65 KB Posted

Attached to
S299--VISN 04 Window, Glass, and Surface Cleaning Services
Solicitation number
36C24421Q0573
Issued by

View the file

Other files

File Type Posted
36C24421Q0573 0005.docx DOCX document
36C24421Q0573 0004.docx DOCX document
36C24421Q0573 0003.docx DOCX document
36C24421Q0573 0002.docx DOCX document
Wilkes Barre Wage Determination.pdf PDF
Map of Main and CLC Campus.pdf PDF
P12 - Site Map - PIT - Heinz.pdf PDF
Lebanon Wage Determination.pdf PDF
Phildadelphia Wage Determination.pdf PDF
P12 - Site Map - ERIE.pdf PDF
Wilmington Wage Determination.pdf PDF
P12 - Site Map - LEB.pdf PDF
P12 - Site Map - PIT - University Drive.pdf PDF
P12 - Site Map - BUT.pdf PDF
P12 - Site Map - WB 1.pdf PDF
Butler Wage Determination.pdf PDF
P12 - Site Map - WB 2.pdf PDF
Erie Wage Determination.pdf PDF
P12 - Site Map - COAT.pdf PDF
Pittsburgh Wage Determination.pdf PDF
P12 - Site Map - WIL.pdf PDF
Coatesville Wage Determination.pdf PDF
36C24421Q0573 - VISN 4 Window Cleaning Amendment.docx DOCX document
36C24421Q0573 0001.docx DOCX document
Contract Performance Report Example - VISN 4 Windows.docx DOCX document
Corrective Action Plan Form Example - VISN 4 Windows.docx DOCX document
Records Managment Language - VISN 4 Window.docx DOCX document
Cleaning Cycle Evaluation Form Example - VISN 4 Windows.docx DOCX document
36C24421Q0573.docx DOCX document
ESTIMATED ANNUAL QUANTITIES - VISN 4 WINDOWS.pdf PDF
QASP Draft - VISN 4 Windows.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B.2 PERFORMANCE WORK STATEMENT (PWS)

VISN 04 Window, Glass, and Surface Cleaning Service

Introduction

This is a non-personnel services contract to provide Window, Glass, and Surface Cleaning Service for the Medical Centers of the Veterans Health Administration’s Veterans Integrated Service Network 04.

SECTION 1 - ACRONYMS AND DEFINITIONS

1.1 Acronyms. Following are acronyms which may be used in place of full text throughout this Performance Work Statement

AQLAcceptable Quality Level
CAPCorrective Action Plan
CCCleaning Cycle
CCECleaning Cycle Evaluation
CLINContract Line Item Number
COContracting Officer
CPARSContractor Performance Assessment Reporting System
CPRContract Performance Report
EMSEnvironmental Management Services
FARFederal Acquisition Regulation
FCORFacility Contracting Officer Representative
GFMGovernment Furnished Materials
GFPGovernment Furnished Property
GFSGovernment Furnished Services
IDIQIndefinite Delivery Indefinite Quantity
IWCAInternational Window Cleaning Association (www.iwca.org)
OSHAOccupational Safety and Health Administration
POCPoint of Contact
PRSPerformance Requirements Summary
PWSPerformance Work Statement
QASPQuality Assurance Surveillance Plan
QCPQuality Control Plan
SDSSafety Data Sheet
TOTask Order
VADepartment of Veterans Affairs
VAMCVeterans Administration Medical Center
VCORVISN04 Contracting Officer Representative
VHAVeterans Health Administration
VISNVeterans Integrated Service Network

1.2 Definitions. Following are definitions for words or phrases used throughout this PWS.

1.2.1 Calendar Days. Every consecutive day on the calendar, including holidays and weekends.

1.2.2 Cleaning Cycle. The cleaning cycle is the unit of service to be acquired by the Government. The CC is further defined in Section 5 and Section 6 of this PWS. The Government will acquire cleaning cycle(s) through issued TOs

1.2.3 Contractor. A supplier or vendor having a contract to provide specific supplies or service to the Government. The term used in this PWS refers to the prime Contractor

1.2.4 Contracting Officer. A person with authority to award, administer, and terminate contracts and make related determinations and findings on behalf of the Government. The only individual legally authorized to bind the Government.

1.2.5 FCOR. An employee of the U. S. Government appointed by the CO to assist with contract administration at the facility level and to liaison between the Contractor, CO and VCOR. A CO issued delegation memo will further define the roles of the FCOR.

1.2.6 Quality Assurance. The Government procedures to verify provided Contractor services are performed according to acceptable standards.

1.2.7 Quality Control. All measures taken by the Contractor to assure the quality of services provided meets contract requirements.

1.2.8 QASP. A written document specifying the methodology to be used to surveil Contractor performance.

1.2.9 Task Order. An order for services placed against the Window, Glass, Surface Cleaning Service contract.

1.2.10 VCOR. An employee of the U. S. Government appointed by the CO to assist with contract administration at the VISN level and to liaison between the Contractor, CO and FCOR. A CO issued delegation memo will further define the roles of the VCOR.

SECTION 2 – GENERAL INFORMATION

2.1 General. VISN04 requires window, glass, and surface cleaning services at the VISN04 VAMC’s as indicated in this PWS

2.2 Description of Services. Contractor must provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Window, Glass, and Surface Cleaning Service as defined in this Performance Work Statement. The Contractor must perform to the standards in this contract.

2.3 Background. The VISN04 is comprised of nine Veterans Administration Medical Centers. Historically some of the facilities have operated under individual contracts. VISN04 intends to pursue a single Firm Fixed Priced, five-year Indefinite Delivery Indefinite Quantity contract or five-year Firm Fixed Priced Blanket Purchase Agreement to provide service to all nine sites in VISN04.

2.4 Objectives.

· Window, Glass, and Surface Cleaning Services

· Availability for use by the VISN04 Medical Centers

2.5 Quality Assurance. The Government will evaluate the Contractor’s performance under this contract in accordance with the attached QASP included as Attachment 1. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). The FCOR will conduct performance surveillance and when defective performance is observed will make known the defective performance to the Contractor’s Facility Manager or acting alternate. Government surveillance of tasks other than those listed in the QASP, may occur during the performance period of the contract.

2.6 Holidays. Contractor may perform services on any of the below Federal holidays if pre-approved by the applicable FCOR:

New Year’s DayMartin Luther King Day
President’s DayMemorial Day
Independence DayLabor Day
Columbus DayVeteran’s Day
ThanksgivingChristmas

2.7 Hours of Operation. Generally, cleaning services will occur between 0700 – 1700 Monday through Friday, excluding Federal Holidays; however, the Contractor may be required to provide services after hours (1700 – 0700) and on the weekends and must have the capability to do so. Issued TOs will identify when cleaning services are required after hours and on the weekends. The Contractor may request to perform services after hours or on weekends, such requests must be presented to the FCOR and written approval must be obtained from the FCOR prior to service performance.

2.8 Place of Performance. The Contractor must have the capability to perform cleaning services at any of the following facilities. Issued TOs will define locations.

Facility
Official Name
Address
County
Altoona
James E VanZandt VAMC
2907 Pleasant Valley Road, Altoona, PA 16602
Blair
Butler
Butler VAMC
325 New Castle Rd, Butler PA 16001
Butler
Coatesville
Coatesville VAMC
1400 Blackhorse Hill Road, Coatesville, PA 19320
Chester
Erie
Erie VAMC
135 East 38th Street, Erie, PA 16504
Erie
Lebanon
Lebanon VAMC
1700 South Lincoln Avenue, Lebanon, PA 17042
Lebanon
Philadelphia
Corporal Michael J Crescenz VAMC
3900 Woodland Avenue, Philadelphia, PA 19104
Philadelphia
Pittsburgh
Pittsburgh VAMC University Drive Campus
University Drive, Pittsburgh, PA 15240
Allegheny
Pittsburgh
Pittsburgh VAMC H. J. Heinz Campus
1010 Delafield Road Pittsburgh, PA 15215
Allegheny
Wilkes Barre
Wilkes Barre VAMC
1111 East End Boulevard Wilkes Barre, PA 18711
Luzerne
Wilmington
Wilmington VAMC
1601 Kirkwood Highway Wilmington, DE 19805
New Castle

2.9 Insurance. The Government requires insurance as specified in incorporated Clauses.

2.10 Physical Security. The Contractor is responsible for safeguarding all Government equipment, information and property and is liable for any Contractor caused damage.

2.11 Access Control. The Contractor must adhere to the following:

2.11.1 Each facility will determine accessibility to restricted areas. Access to restricted areas must be coordinated with the FCOR and may require Government provided escort.

2.11.2 The Contractor must establish and implement methods of ensuring all keys, access badges, access passes, and lock combinations issued to the Contractor are not lost or misplaced and are not used by unauthorized persons. The Contractor will not duplicate any keys, access badges, or access passes issued by the Government.

2.11.3 The Contractor must immediately notify the FCOR or CO any occurrences of lost or duplicated keys, access badges, and/or access passes. Additional parties may require notification (e.g. facility police, safety office, etcetera) as identified by the FCOR.

2.11.4 The Contractor must prohibit the use of issued keys, access badges, access passes, and lock combinations by any person(s) other than the Contractor’s employees. Opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in contract performance is prohibited.

2.11.5 Accessed restricted areas must be secured and locked at work conclusion.

2.12 Post Award Conference. The Contractor agrees to attend any post award conference requested by the VCOR, FCOR, or Contracting Officer in accordance with Federal Acquisition Regulation Subpart 42.5.

2.13 Periodic Progress Meetings. The Contracting officer, VCOR, FCOR or other Government personnel, as appropriate, may meet periodically with the Contractor to review the contractor's performance. At these meetings the Government will apprise the contractor of how the government views the contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action must be taken to resolve outstanding issues. These meetings will be at no additional cost to the Government

2.14 Identification of Contractor Employees. All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public they are Government officials. The Contractor must also ensure all documents or reports produced by Contractors are suitably marked as Contractor products or that contractor participation is appropriately disclosed.

2.14.1 Contractor employees must be clean and present a neat appearance. Hair must be neatly trimmed and combed. Contractor employees must wear Contractor provided uniforms or comply with Contractor’s dress code which must include pants, shirts or blouses, and protective clothing when applicable. The dress code must be the same color or color combinations for all Contractor employees and distinguishable from VAMC staff and facility population. All apparel, whether uniform or dress code requirements, will be worn as designed by the manufacturer. Open toe shoes or sandals are not permitted. All personnel will display a Contractor provided identification badge while on campus. The badge must include: 1) Name of employee, 2) Contractor name, and 3) Employee photograph and must be visible and attached to employee clothing at chest level.

2.14.2 Facility access requirements vary amongst the VISN04 facilities. To ensure compliance, the Contractor must obtain the facility requirements from the FCOR prior to work commencement.

SECTION 3 – CONTRACTOR PERSONNEL

3.1 Project Manager and Facility Managers. The Contractor must provide a Project Manager and Facility Managers who are responsible for the performance of the work. The Contractor must also provide alternates for the Project Manager and Facility Managers during absences. The names and contact information of these individuals must be designated in writing to the CO prior to contract award and subsequent changes must be presented to the CO and applicable FCOR within one business day of the change. Each participating VISN04 VAMC requires an assigned Facility Manager and alternate(s).

3.1.1 The Project Manager and Facility Managers or alternate(s) must have full authority to act for the Contractor on all contract matters.

3.1.2 The Facility Manager or alternate must be on-site, at the applicable facility, and reachable via cell phone during times Contractor employees are performing contract work and must be available to meet with the FCOR, when requested, within 30 minutes. A cell phone contact number must be provided to the FCOR prior to contract work commencement.

3.1.3 The Project Manager and Facility Managers or alternate(s) must be able to read, write, speak, and understand English.

3.2 Contractor Employees. The Contractor must not employ persons for work on this contract if such employee is considered by the CO or FCOR to be a potential threat to the facility’s operational mission or the health, safety, security, general well-being of the VISN04 VAMC’s employees and facility population.

3.2.1 The Contractor must comply with the applicable facility’s Infection Control Policy, Tuberculosis Surveillance Policy, and Infectious Disease Policy. Guidance and policy requirements will be provided by the FCOR and the facility’s Infection Prevention and Control Office. Costs incurred to establish and maintain Contractor compliance will be borne by the Contractor.

3.2.2 The Contractor employees also employed by the U. S. Government must be identified. A list of such individuals must be presented to the FCOR prior to work commencement. The list must include: 1) name of employee, 2) address of employee, 3) contact telephone number of the employee, 4) position the employee holds with the Contractor, and 5) agency and position the employee holds with the U. S. Government. The FCOR and the CO will determine if the employee(s) is granted approval to perform work under the contract.

3.3 Safety. The Contractor must perform all work in a safe manner, ensuring the protection of facility buildings and equipment from damage and Contractor employees and facility population from injury.

3.3.1 The Contractor must comply with all applicable VA, VHA, VISN04 VAMC, Federal, State, and Local Municipality directives, standards, ordinances, laws, and regulations to include but not limited to OSHA, IWCA, and IWCA Alliance directives, standards, laws, regulations, and guides.

3.3.2 The Contractor must coordinate with the FCOR a site visit at each VISN04 VAMC prior to work commencement. The visit will familiarize Contractor with the facility and offer opportunity for the FCOR to provide the facility’s guidelines and policies. It will also afford opportunity to identify and mitigate any site-unique hazards or obstacles.

3.3.3 The Contractor must adhere to site-specific requirements (e.g., check-in check-out procedures, site parking restrictions, etcetera) provided by the FCOR.

3.3.4 Prior to work commencement, the Contractor must verify, with the FCOR, the cleaning solutions, compounds, and/or chemicals the Contractor intends to use are permitted. The Contractor must provide the FCOR any requested SDS.

3.3.5 Contractor employees performing the services must be IWCA certified in any multiple of the following IWCA certifications: 1) Certified Commercial Ground, 2) Certified Rope Descent Systems, and 3) Certified Suspended Scaffolds. Equivalent certifications bestowed by organizations other than IWCA may be substituted with CO and FCOR approval. An employee’s certification must be congruent with work performed. Contractor must provide proof of employee certification within three business days when requested by the FCOR.

3.3.6 The FCOR reserves the right to stop work if unsafe practices are observed. The Contractor must make corrections prior to work resumption at no cost to the Government.

3.3.7 At no time may a Contractor employee use VAMC furniture, windowsills, or equipment as substitute stools or ladders.

3.3.8 Any window or door open during the cleaning process must be closed and locked (if applicable) at completion.

SECTION 4 – GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICE

4.1 Government Furnished Property. The Government will not provide GFP

4.2 Government Furnished Materials. The Government will not provide GFM

4.3 Government Furnished Services. The Government will permit us of limited utility services, i.e., electric and water. Water will be available for the filling and re-filling of buckets, spray bottles and other containers needed during the cleaning process. The Government will permit use of 120volt AC electricity for Contractor owned equipment operation. The Contractor must ensure all Contractor employees use methods to conserve utilities.

4.3.1 Lights must be turned off when no longer required in work areas.

4.3.2 Contractor employees must not adjust controls for heating, ventilation, air conditioning, or any other environmental systems.

4.3.3 Water faucets or valves must be turned fully closed when no longer in use.

SECTION 5 – CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES

5.1 The Contractor must provide all property, equipment, apparatus, materials, supplies, safety equipment (to include all lifts, scaffolds, suspended scaffolds, anchors etc.) and services required to ensure all terms and conditions are met.

5.2 The Government reserves the right to have removed from the work site any Contractor equipment or apparatus not meeting standards expressed in Section 3.3 of this PWS.

SECTION 6 – TASKS AND CAPABILITY

6.1 The Contractor must be capable of meeting and accomplishing all elements of this PWS.

6.2 The Contractor must provide all labor, material, equipment, apparatus, maintenance, repair, supplies, transportation, management, expertise and supervision necessary to perform the requirements of this service contract. In executing the requirements of this PWS, the Contractor must satisfy the performance requirements included in this PWS and the requirements set forth in the attached QASP.

6.3 Contractor Capability.

6.3.1 The Period of Performance (POP) will be stated within each TO. Any deviations (delays) due to extraneous circumstances (i.e. weather) must be presented to the FCOR, VCOR and CO. The CO will make any final determinations.

6.3.2 The Contractor must be able to perform at four (4) facilities within VISN4 at the same time under this contract.

6.3.3 The Contractor must be capable of completing performance at each facility within one (1) month of the start of the period of performance as specified within each TO. *For Pittsburgh’s campuses, the Contractor must be capable of completing all of the Cleaning Cycles (refer to Section 6.7 of this PWS) within eight (8) weeks of the start of the period of performance as specified within each TO.

6.4 Window, Glass, and Panel surfaces.

6.4.1 The quantity and location of window, glass, and panel surfaces are estimated in Section 6.7 of this PWS. (If a Contractor wishes to conduct a site-visit prior to submitting an offer, they may do so at their own expense. All site-visit requests shall be emailed to william.schlobohm@va.gov no later than seven (7) days prior to solicitation due date. Any questions or clarifications asked or needed as a result of a site-visit will result in a solicitation amendment to provide the answers or clarifications.)

6.4.2 Window, glass, and surfaces include but are not limited to:

· Windows

· Glass in doors

· Glass ventilators and /or transoms

· Blanks

· Fiberglass panels

6.4.3 All surfaces must be cleaned and free of streaks, smears, soap residue, dirt, paint specs, or other foreign debris. Following the cleaning, the cleaning solutions, compounds, and chemicals used in the cleaning process must be wiped and absorbed; the window, frame, sills, screens, tracks, and floor in the work area must be made dry.

6.4.4 Any items, furniture, equipment, etcetera, moved to allow for cleaning purposes must be returned to the original location and be wiped dry of any cleaning solutions, compounds, and chemicals.

6.4.5 When working in building interiors, opportunity must be given to VAMC staff to clear work areas prior to cleaning. The Contractor will coordinate with the FCOR methods of notification.

6.5 Window Frames, Sills, Screens, and Window/Screen tracks.

6.5.1 The quantity and location of the window frames, sills, screens, and window/screen tracks are estimated in Section 6.7 of this PWS. (If a Contractor wishes to conduct a site-visit prior to submitting an offer, they may do so at their own expense. All site-visit requests shall be emailed to william.schlobohm@va.gov no later than seven (7) days prior to solicitation due date. Any questions or clarifications asked or needed as a result of a site-visit will result in a solicitation amendment to provide the answers or clarifications.)

6.5.2 All frames, sills, screens, tracks, etcetera must be cleaned and free of streaks, stains, soap residue, dirt, paint specs, dust, or other foreign debris. Following the cleaning, the cleaning solutions, compounds, and chemicals used in the cleaning process must be wiped and absorbed; the window, frame, sills, screens, tracks, and floor in the work area must be made dry.

6.5.3 Any screens or components removed for cleaning purposes must be reinstalled after completion. Any items, furniture, equipment, etcetera, moved to allow for cleaning purposes must be returned to the original location and be wiped dry of any cleaning solutions, compounds, and chemicals.

6.5.4 When working in building interiors, opportunity must be given to VAMC staff to clear work areas prior to cleaning. The Contractor will coordinate with the FCOR methods of notification.

6.6 Additional Services.

6.6.1 Condition Report. During the cleaning process, the Contractor must evaluate the condition of the windows, panels, glass, frames, sills, screens, etcetera. The following or similar conditions must be reported to the FCOR:

· Screen tears or holes

· Cracked or broken windows, panes, panels

· Damaged or torn window seals

· Inoperable windows

· Any other conditions considered poor or in need of repair

The report must be in Word or PDF format and, at a minimum, must include the reportable condition, the location (building – room number), the date discovered and the name of the Contractor employee making the observation. The report is due at the conclusion of a CC unless the Contractor determines the condition presents a safety concern; it must then be reported immediately to the FCOR.

6.6.2 Cleaning Cycle Schedule. Prior to the start of a CC the Contractor must present to the FCOR a Cleaning Cycle Schedule. The schedule must identify locations (e.g., rooms, floors, wings, etcetera) and the anticipated date cleaning will occur in those locations. As schedule deviations occur, they must be reported to the FCOR. The FCOR will define the report format.

6.6.3 Post Cleaning Report. During a CC, Post Cleaning Reports must be presented to the FCOR. The Post Cleaning Reports will identify locations recently cleaned. The FCOR will determine the frequency the reports are required (daily, weekly, etcetera) and will define the report format.

6.7 VISN04 VAMC Requirements. Facility requirements follow in Section 6.7 of this PWS. The requirements identified in each table must be worked as an independent project, be completed in entirety, and hereinafter will be referred to as a Cleaning Cycle. The window counts in Sections 6.7 PWS, are estimates and the window sizes vary. The pre-award site visits are crucial and will provide Contractor opportunity to evaluate and appraise the site requirements.

6.7.1 James E. Van Zandt Veterans Affairs Medical Center (Altoona VAMC). At this time Altoona VAMC will not be participating; However, within the life of the contract Altoona VAMC may elect to participate. Contractor must ensure they have resources and capability to include Altoona in the future. Altoona VAMC will provide CC tables. Fair and reasonable pricing will be negotiated with the CO, VCOR and FCOR.

6.7.2 Butler VAMC:

6.7.2.1

CC 1A

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient area
2 – 1st floor
Yes
Yes
159
Varies
2 Story
No
2 – 2nd floor
Yes
Yes
157
Varies
2 Story
No
20
Yes
Yes
868
Varies
1 Story
Yes
21
Yes
Yes
129
Varies
1 Story
No
22
Yes
Yes
78
Varies
2 Story
Yes
23
Yes
Yes
106
Varies
2 Story
Yes
24
Yes
Yes
106
Varies
2 Story
Yes
25
Yes
Yes
62
Varies
1 Story
Yes

CC 1B

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient Area
2 – Entrance
Yes
Yes
Varies
2 Story
No
20 – Entrance
Yes
Yes
Varies
1 Story
Yes

CC 1C

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient Area
2 – 20 Tunnel
Yes
Yes
10
Varies
1 Story
No

6.7.2.2 Suspended scaffolds and rope descents from the roof top are not permitted at the Butler campus.

6.7.2.3 FCOR will provide special safety requirements and lift equipment/apparatus constraints.

6.7.2.4 The exterior windows of assigned buildings must be cleaned regardless of interior accessibility.

6.7.2.5 Building 20 skylights can only be accessed from the rooftop.

6.7.3 Coatesville VAMC:

6.7.3.1

CC 2A

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient area
3
No
Yes
100
Varies
3 Story
Yes
3 MRI
No
Yes
Varies
3 Story
Yes
69
No
Yes
75
Varies
1 Story
Yes
69 – Pool area
No
Yes
60
Medium
3 Story
Yes
138 – E
No
Yes
100
Varies
2 Story
Yes
138
No
Yes
200
Varies
2 Story
Yes
138 – Atrium
No
Yes
Varies
1 Story
Yes
39
No
Yes
200
Varies
3 Story
Yes
57
No
Yes
200
Varies
3 Story
Yes
59
No
Yes
200
Varies
3 Story
Yes
38
No
Yes
200
Varies
3 Story
No
1
No
Yes
200
Varies
3 Story
Yes
2
No
Yes
200
Varies
3 Story
Yes
4
No
Yes
200
Varies
3 Story
Yes
5
No
Yes
200
Varies
2 Story
Yes
6
No
Yes
200
Varies
3 Story
Yes
7
No
Yes
200
Varies
3 Story
Yes
8
No
Yes
200
Varies
3 Story
Yes
9
No
Yes
200
Varies
3 Story
Yes
16
No
Yes
200
Varies
3 Story
No
72
No
Yes
200
Varies
1 Story
Yes
70
No
Yes
200
Varies
1 Story
No
58
No
Yes
200
Varies
3 Story
Yes
139
No
Yes
60
Varies
1 Story
Yes

CC 2B

Location/ Building Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient area

3 –Urgent Care Entrance
Yes
Yes
25
Varies
3 Story
Yes
Building 138-Hospice Entrance
Yes
Yes
10
Varies
2 Story
Yes

CC 2C

Location/ Building Inside Cleaning Outside Cleaning Estimated Window Count Window Size Building Height Patient area

3
Yes
No
100
Varies
3 Story
Yes
3 MRI
Yes
No
Varies
3 Story
Yes
69
Yes
No
75
Varies
1 Story
Yes
69 – Pool area
No
No
60
Medium
3 Story
Yes
138 – E
Yes
No
100
Varies
2 Story
Yes
138
Yes
No
200
Varies
2 Story
Yes
138 – Atrium
Yes
No
Varies
1 Story
Yes
39
Yes
No
200
Varies
3 Story
Yes
57
Yes
No
200
Varies
3 Story
Yes
59
Yes
No
200
Varies
3 Story
Yes
38
Yes
No
200
Varies
3 Story
No
1
Yes
No
200
Varies
3 Story
Yes
2
Yes
No
200
Varies
3 Story
Yes
4
Yes
No
200
Varies
3 Story
Yes
5
Yes
No
100
Varies
2 Story
Yes
6
Yes
No
200
Varies
3 Story
Yes
7
Yes
No
200
Varies
3 Story
Yes
8
Yes
No
200
Varies
3 Story
Yes
9
Yes
No
200
Varies
3 Story
Yes
16
Yes
No
200
Varies
3 Story
No
72
Yes
No
100
Varies
1 Story
Yes
70
Yes
No
100
Varies
1 Story
No
58
Yes
No
200
Varies
3 Story
Yes
139
Yes
No
60
Varies
1 Story
Yes

6.7.3.2 Suspended scaffolds and rope descents from the roof top are not permitted at the Coatesville campus.

6.7.3.3 Outside windows are to be accessed and cleaned from the outside. The inside panes must be accessed and cleaned from the inside. The FCOR will provide any exceptions. Windows may not be removed for cleaning unless specific approval has been received from the FCOR.

6.7.3.4 The exterior windows of assigned buildings must be cleaned regardless of interior accessibility.

6.7.3.5 Outside window cleaning to be accomplished on all floors of assigned buildings except for the following: windows above the second floor on the front side of Building One do not require outside cleaning.

6.7.4 Erie VAMC:

6.7.4.1

CC 3A

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient area
1
Yes
Yes
306
Varies
7 Story
Yes
6
Yes
Yes
18
Varies
1 Story
No
8
Yes
Yes
94
Varies
2 Story
Yes
CLC
Yes
Yes
44
Varies
1 Story
Yes
Parking Garage
Yes
Yes
86
Varies
2 Story
No
New Boiler Plt
Yes
Yes
3
Varies
2 Story
No

CC 3B

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient Area
1 – Entrances
Yes
Yes
15
Varies
7 Story
Yes
8 – Entrance
Yes
Yes
10
Varies
2 Story
Yes
CLC – Entrance
Yes
Yes
8
Varies
1 Story
Yes
Park Garage - Ent
Yes
Yes
18
Varies
2 Story
No

6.7.4.2 Suspended scaffolds and rope descents from the roof top are not permitted at the Erie campus.

6.7.4.3 Many of the facility’s outside windows are accessible and cleanable from the inside. The Contractor must clean the outside when accessible. The FCOR will identify windows not to be opened in order to access the outside. Such windows will not require outside cleaning during the CC except as stipulated in Section 6.7.4.4 of the PWS.

6.7.4.4 The locations identified in the CC 3A table require outside cleaning from the ground through the third floor regardless of interior accessibility.

6.7.5 Lebanon VAMC:

6.7.5.1

CC 4A

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient area
1 – Ground- 1st Fl
Yes
Yes
122
Varies
7 Story
Yes
18 – Basement-1stFl
Yes
Yes
72
Varies
6 Story
Yes
19 – 1st Fl-2nd Fl
Yes
Yes
108
Varies
3 Story
No
22 – 1st Fl -2rd Fl
Yes
Yes
92
Varies
3 Story
No
99 – 1st Floor
Yes
Yes
92
Varies
1 Story
No
2 – 1st Fl-2nd Fl
Yes
Yes
48
Large
3 Story
No
23 – 1st Floor
Yes
Yes
66
Varies
3 Story
No
24 – 1st Floor
Yes
Yes
16
Varies
1 Story
No
106 – 1st Floor
Yes
Yes
8
Varies
1 Story
No
4-1st Fl and 2nd Fl
Yes
Yes
60
Varies
2 Story
No
5-1st Fl and 2nd Fl
Yes
Yes
40
Varies
2 Story
No
25
Yes
Yes
24
Varies
2 Story
No
17 – Café
Yes
Yes
100
Varies
1 Story
Yes
17 – 1st Fl-2nd Fl
Yes
Yes
336
Varies
5 Story
Yes
101 – 1st Floor
Yes
Yes
14
Varies
1 Story
Yes
102 – 1st Floor
Yes
Yes
8
Varies
1 Story
Yes
100 – 1st Floor
Yes
Yes
40
Varies
2 Story
Yes
104-1st Floor
Yes
Yes
116
Varies
1 Story
Yes
144 – 1st Floor
Yes
Yes
10
Varies
1 Story
Yes
34- 1st Fl to 2nd Fl
Yes
Yes
144
Varies
2 Story
Yes
35- 1st Fl to 2nd Fl
Yes
Yes
164
Varies
2 Story
Yes
36- 1st Fl to 2nd Fl
Yes
Yes
112
Varies
2 Story
Yes

CC 4B

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient Area
1 – 2nd -5th Fl
Yes
No
490
Varies
7 Story
Yes
18 – 2nd Fl-5th Fl
Yes
No
432
Varies
6 Story
No
19 – 3nd Fl
Yes
No
108
Varies
3 Story
No
22 – 3rd Fl
Yes
No
46
Varies
3 Story
No
2 – 3rd Fl
Yes
No
48
Large
3 Story
No
17 – 3rd Fl - 5th Fl
Yes
No
504
Varies
5 Story
Yes

CC 4C

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient Area
17-18 Tunnel
Yes
Yes
63
Medium
1 Story
No
19 Tunnel
Yes
Yes
48
Medium
1 Story
No
22 Tunnel
Yes
Yes
12
Medium
1 Story
No
24 Tunnel
Yes
Yes
10
Medium
1 Story
No
136 Tunnel
Yes
Yes
20
Medium
1 Story
No

6.7.5.2 Suspended scaffolds and rope descents from the roof top are not permitted at the Lebanon campus.

6.7.5.3 The FCOR will provide special safety requirements and lift equipment/apparatus constraints.

6.7.6 Corporal Michael J Crescenz Veterans Affairs Medical Center (Philadelphia VAMC):

6.7.6.1

CC 5A

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient Area
1
Yes
Yes
1513
Varies
9 Story
Yes
2
Yes
Yes
1073
Varies
8 Story
Yes
21
Yes
Yes
67
Varies
8 Story
Yes
3
Yes
Yes
35
Varies
2 Story
Yes
CLC
Yes
Yes
923
Varies
2 Story
Yes
Employee Garage
Yes
Yes
506
Varies
4 Story
No
Engineering
Yes
Yes
52
Varies
1 Story
No

CC 5B

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient Area
1 – Entrance
Yes
Yes
1513
Varies
9 Story
Yes
2 – Entrance
Yes
Yes
1073
Varies
8 Story
Yes
21 – Entrance
Yes
Yes
67
Varies
8 Story
Yes
3 – Entrance
Yes
Yes
35
Varies
2 Story
Yes
CLC – Entrance
Yes
Yes
923
Varies
2 Story
Yes
Employee Garage – Entrance
Yes
Yes
506
Varies
4 Story
No
Engineering – Entrance
Yes
Yes
52
Varies
1 Story
No

6.7.6.2 The facility’s outside windows cannot be accessed from the interior.

6.7.6.3 Exterior window cleaning can only be accomplished on weekends. The FCOR will identify the outside panes to be cleaned during a CC and will coordinate scheduling with the Contractor’s Facility Manger and the facility’s EMS Manager.

6.7.6.4 Suspended scaffolds and rope descents from the roof top are permitted. The facility’s Engineering and Safety Office must be consulted prior to use.

6.7.7 Pittsburgh VAMC:

6.7.7.1 University Drive Campus:

6.7.7.2

CC 6A

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient Area
1
Yes
Yes
5351
Varies
13 Story
Yes
1 – Lincoln Wall
Yes
N/A
1
Large
3 Story
Yes
29
Yes
Yes
1356
Varies
6 Story
Yes
30
Yes
Yes
447
Varies
4 Story
No
Parking Garage
Yes
Yes
386
Varies
8 Story
Yes
33
Yes
Yes
71
Varies
3 Story
No
Police Booth
Yes
Yes
4
120 SqFt
1 Story
No

1 – Kalwall Surfaces

Elevator Tower Walls, East, West, Floors 1 - 5
5 Story
Yes
Room 2N174, Connecting Corridor
1 Story
Yes
Stairwells 2,3,6,7
13 Story
Yes
11th Floor Breezeways, East & West
1 Story
Yes
Smoking shelter
Yes
Yes
40x16x10
1 Story
No

6.7.7.3 Building 29 lobby, Lincoln Wall requires cleaning. It is constructed of honed limestone. There is a staircase at the bottom of the wall. The wall is approximately 30 feet wide and 43 feet tall at the bottom of the staircase and 31 feet tall at the top of the staircase. The Terrazzo flooring around the wall must be protected during cleaning. The FCOR will provide special safety requirements and lift equipment/apparatus constraints.

6.7.7.4 Building 29 lobby includes an arched glass ceiling of approximately 258 panes with a total area of approximately 4,620 square feet. The maximum interior height is 43feet. The Terrazzo floor must be protected during cleaning. The FCOR will provide special safety requirements and lift equipment/apparatus constraints.

6.7.7.5 Building 29 (Chapel) stained glass window, squeegee cleaning may not be effective.

6.7.7.6 Outside windows are to be accessed and cleaned from the outside. The inside panes must be accessed and cleaned from the inside. The FCOR will provide any exceptions. Windows may not be removed for cleaning unless specific approval has been received from the FCOR.

6.7.7.7 Heinz Campus:

6.7.7.8

CC 6B

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient Area
49
Yes
Yes
108
Varies
1 Story
No
32
Yes
Yes
310
Varies
3 Story
No
50
Yes
Yes
974
Varies
2 Story
Yes
51
Yes
Yes
580
Varies
4 Story
Yes
69
Yes
Yes
301
Varies
3 Story
Yes
69 Vestibules
Yes
Yes
18
Varies
3 Story
Yes
70
Yes
Yes
350
Varies
3 Story
No
Villas
Yes
Yes
414
Varies
3 Story
Yes
71
Yes
Yes
635
Varies
3 Story
Yes
71 – Lt Fixture
Yes
N/A
1
Medium

Yes

52
Yes
Yes
52
Varies
3 Story
Yes
53
Yes
Yes
24
Varies
3 Story
Yes
Canopy to Shelter
Yes
Yes
4
Varies
1 Story
Yes
50 Smoking Shelter 1
No
Yes

40x16x10

No

50 Smoking Shelter 2
No
Yes

25x16x10

No

50
No
Yes
251
Small
51
No
Yes
257
Small
Police Booth
Yes
Yes
3
80SqFt
1 Story
No

CC 6C

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient Area
50 – 51 Tunnel
Yes
Yes
88
Varies
2 Story
Yes
50 – 51 Tunnel
No
Yes
102
Small
2 Story
Yes
51 – 71 Tunnel
Yes
Yes
123
Varies
2 Story
Yes

6.7.7.9 Building 69 vestibule glass ceilings located at two entrances must be cleaned from the topside and from the bottom-side. Each entrance has nine panes with a 120 square foot area. Top of glass must be accessed from floor of lobby area

6.7.7.10 Building 71 lobby lighting fixture must be cleaned. The following heights and dimensions are approximate. The four-sided fixture is a unique design (20ft x 5ft x 5ft) constructed with metal and glass hanging from a 45foot high ceiling. Top of fixture is 40feet high. Bottom of fixture is 20feet high. Two metal plates are positioned between the fixture and the ceiling which require cleaning. The total fixture surface area is 350 square feet. The FCOR will provide special safety requirements and lift equipment/apparatus constraints.

6.7.7.11 Building 71 glass partition around the second-floor stairwell requires cleaning on both sides.

6.7.7.12 Suspended scaffolds and rope descents from the roof top are not permitted at the Heinz Campus

6.7.7.13 Outside windows are to be accessed and cleaned from the outside. The inside panes must be accessed and cleaned from the inside. The FCOR will provide any exceptions. Windows may not be removed for cleaning unless specific approval has been received from the FCOR.

6.7.8 Wilkes-Barre VAMC:

6.7.8.1

CC 7A

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient Area
8
Yes
Yes
34
Medium
1 Story
No
42
Yes
Yes
19
Medium
1 Story
No
35
Yes
Yes
21
Medium
1 Story
No
7
Yes
Yes
54
Medium
1 Story
No
5
Yes
Yes
49
Medium
2 Story
No
3
Yes
Yes
50
Medium
2 Story
No
2
Yes
Yes
40
Medium
2 Story
No
1
Yes
Yes
1910
Varies
11 Story
Yes

6.7.8.2 Suspended scaffolds and rope descents from the roof top are not permitted at the Wilkes Barre campus. Exterior panes will only be cleaned if accessible from the inside.

6.7.8.3 Many of the facility’s outside windows can be accessed and cleaned from the inside. The Contractor must clean the outside when accessible. The FCOR will identify windows not to be opened in order to access the outside. Such windows will not require outside cleaning during the CC.

6.7.9 Wilmington VAMC:

6.7.9.1

CC 8A

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient Area
1
Yes
Yes
1046
Medium
10 Story
Yes
10
Yes
Yes
20
Medium
1 Story
No
5
Yes
Yes
35
Medium
1 Story
No
6
Yes
Yes
30
Medium
2 Story
No
7
Yes
Yes
15
Large
2 Story
No
13
Yes
Yes
50
Small
1 Story
No
15
Yes
Yes
20
Small
2 Story
No
17
Yes
Yes
100
Small
1 Story
No

CC 8B

Location/ Building
Inside Cleaning
Outside Cleaning
Estimated Window Count
Window Size
Building Height
Patient Area
1 – ground and 1st floor
Yes
Yes
56 plus 9 glass entrances
Medium
10 Story
Yes
10 – ground and 1st floor
Yes
Yes
32 plus 1 glass entrance
Medium
1 Story
No
5 – ground and 1st floor
Yes
Yes
21 plus 5 glass doors and 1 glass entrance
Medium
1 Story
No
6 – ground and 1st floor
Yes
Yes
11 plus 2 glass doors
Medium
2 Story
No
17 – ground and 1st floor
Yes
Yes
34 plus 5 glass entrances
Small
1 Story
No
15 – ground and 1st floor
Yes
Yes
10
Small
2 Story
No
13 – ground floor
Yes
Yes
44 plus 4 glass entrances
Small
1 Story
No

6.7.9.2 There are some rooftop anchors permitting limited suspended scaffolds and rope descent systems for exterior window cleaning. The FCOR will identify anchor locations and the facility’s Engineering Office must be consulted prior to use.

6.7.9.3 Exterior windows not accessible from the ground, by lifts, by scaffolding, or suspended systems do not require cleaning; the FCOR will identify such windows.

SECTION 7 – ADDITIONAL INFORMATION

The contractor will not have access to PHI in any form and does not have access to the computer system. However, all contractors must complete basic privacy training. This training can be completed by using the text version of the “VA Privacy for Personnel Without Access to VA Computer Systems or Direct Access to or Use of a Sensitive Information”.

END OF PERFORMANCE WORK STATEMENT